A TM G.M.ARCH Pvr. LTD. ARCHITECTS, ENGlNEERS, PROJECT MANAGEMENT CONSULTANTS SURVEYORS, INTERIOR DESIGNERS & VALUERS GSIEI ilo : Z7A B06764D1Z0 l OI ilo : U4ri2m lE00OPtC1286'rg Arcrenrre A FORU 1 [See Regulation 3l ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing project & for withdrawal of Money from Designated Account) Date: 26m April, 2023 To, l!t/S. Siroya Constructions 72, Bajaj Bhavan, Nariman Point, Mumbai -4000021 Subject: Certificate of Percentage of Completion of Construction Work of ptoposed development of residential building on plot bearing C.T.S. No 312, ZiZ yt toS of village Kondivita at off. Mathurdas Vasanji Road Andheri (E), lvlumbai having MahaRERA Registration Number --- (OnIy applicable after projei Registration) being Developed by Siroya Constructions. - Sir, I / We. have undertaken assignment as Architect / Licensed Surveyor of Certifying percentage of Completion of Corutruction work_of proposed development of residentij u"iai"g on-ptot bearing C.T.s. No 317, 317 /-l to 5 of village Kondivita at off. Mathurdas vasanji RoadlAndheri (E), Murnbai having MahaRERA Registration Number (only applicable aftgr Project Registration) being Developed by Siroya Constructions. Based on the site Irupectiory with respect to the Layout each Building/wing / Real Estate ?rojett, I certify that as on date of this Certificate, the perceiitage of the aforesaid of work Done for each of the Building/wing of the Real Estate project under MahaRERA is a"s per Table-A herein below. The percentage of work executed with respect to each of the activity of entire phase is detailed in Table-B. tl€8d (,fi.:tl0uailr noo, PL tlar$ l( L otatrDss, tflt t mlaloty'400 ml' ilalEn$Ea ffil .Id.:26{0 0512 / 14. Cdl:+91 982([ 3264'fum0 614 CoOq"aU 0n: n6o [0.zim,85$ Xo 56, Gedf [aF, tll8 Colotrr, Bardt? 0, *mbal- ' 100 EDd:gllardu"dunbl0@.c0m.IllafitPtegm!.m.$Eld0EditrlllatrJ0m'tldst:tTiYLSMrilh TABLE-A Layottt / Building / Wng Number _ (to be prepared separately for each Layout/ Building/ Wing of Project) S. Tasks / Activity Percentage of Actual Work No. Done As on date of the Certificate 3 1 Excavation 100 2. Basements if an 0 3 Podiums { 0 4. Plinth 0 5 Stilt Floor 0 6. Slab of Su Structure 0 7 Internal Walls, Intemal Plaster, Floorings, Doors, 0 windows within Flats Premises 8 Sani Fi within Flats Premises 0 9 Staircases, Lift Wells & Lobbies at each Floor Leve1 0 Overhead and Under Water Tanks 10. External Plumbing & Extemal Plaster, Elevation, 0 Completion of Terraces, with waterproofing of the 11. Installation of Lifts, Wa ter Pumps, F1re F ighting Fittings 0 and Eq ulp ments as Per CFO NOC, Electrical Fittings, M echanical Equ1Pmen ts Com P liance to conditions of Environment CRZ NOC, F inishing to Entrance Lo bby s/ Plin th Protectiory Pa vmg of Areas appurtenan t to Buitding/ W mg, Compound WaIl and all other requirements as may be required to complete project as per specifications to Agreement of Sale, Any other TABLE-B Common Areas (lntemal & Extemar Deveropment works) in respect of the Registered phase ,r Project Number S. C ommon Areas & Facilities Proposed Percentage of acfual Work No. Details (Yes/ No) Done As on date of Certificate (1) 2 (3) 4 1 Internal Roads & F aths Yes 0 2 Water Su Yes 0 f tr\---- \r- .1- Sewerage (Chamber, Lines, Septic Yes 0 Tank, STP) 4. Strom Water Drains Yes 0 J. Landsca & Tree Planting No 0 6. Street Lighting No 0 7 Community Buildings No 0 8. Treatrnent & Disposal of Sewage No 0 and Water 9. Solid Waste Management & Yes 0 Disposal 10. Water Conservation / Rain Water Yes 0 Harvesting 11. Energy Management No 0 12 Fire Protection & Fire Safety Yes 0 requirements 13 Electrical Meter Room, Sub- No 0 Station, Receiving Station "14. Others (Option to Add more) No 0 Yours faithfully, MUMBAI Signature Name I Purushottam Govind Redekar License Number Rfia&/LS Agreed & Accepted by: Signature of Promoter l\,I/s. Siroya Constructions Date: 26fr April, 2023