Date: 31/03/2025 ARCHITECT'S CERTIFICATE To, M/s. Shree Sai Enterprises 201, Sai Plaza Jawahar Road, Opp. Ghatkopar Railway Station, Ghatkopar (East) Mumbai - 400 077. Subject: Certificate of Percentage of Completion of Construction Work of composite Building of the Project “Sai Twin Tower”, situated on plot bearing F.P. No. 29, TPS III of village Ghatkopar Kirol, demarcated by its boundaries (latitude and longitude of the end points) 19 4 39.797”N 19 4 39.284”N 19 4 38.444” N 19 4 38.987”N & 72 54 17.945”E 72 54 19.610”E 72 54 19.545”E 72 54 17.664”E village Ghatkopar Kirol, Tilak Road, Ghatkopar (East), ‘N’ ward of MCGM, Mumbai: 400077 admeasuring 1394.70 sq.mts. area being developed by M/s. Shree Sai Enterprises Sir, I Shri. Rohit Dhiraj Patil have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the 01 composite Building of the Project “Sai Twin Tower”, situated on plot bearing F.P. No. 29, TPS III of village Ghatkopar Kirol, Tilak Road, Ghatkopar (East), Mumbai: 400077. admeasuring 1394.70 sq. mts. area being developed by M/s. Shree Sai Enterprises 1. Following technical professionals are appointed by Owner / Promoter: (i) Shri. Rohit Dhiraj Patil as Architect of M/s. Architectural Concept. (ii) Shri. Hiren Shah as Structural Consultant. (iii) Mr. Vijay Puranik as Electric consultant. (iv) Mr. Kamlesh Patel as License Plumber. (v) Shri. Kishor Patil as Site Supervisor. Page 1 of 3 Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800052553 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Composite Building (Wing A & B) Sr. Task / Activity Percentage Percentage No. of work of work done Wing done Wing ‘A’ ‘B’ 1 Excavation 100% 100% 2 Plinth 100% 100% 3 00 number of Podiums NA NA 4 00 number of Stilt Floor NA NA 5a 20 number of Slabs of Super Structure -- 100% 5b 18 number of slabs of Super Structure 100 % -- 6 Internal walls, Internal Plaster, Floorings within 80% 86% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 00% 00% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 90% 96% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 00% 00% elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Electrical fittings 00% 00% to Common Areas, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Page 2 of 3 TABLE-B for Composite Building Common Areas (Internal & External Development Works) in Respect of the Registered Project Sr. Common areas Proposed Percentage of Details No. and Facilities, (Yes/No) Work done Amenities 1 Internal Roads & Footh No NA paths 2 Water Supply YES 00% 3 Sewerage (chamber, lines) YES 00% 4 Storm Water Drains YES 00% 5 Landscaping & Tree YES 00% Planting 6 Street Lighting NO NA 7 Community Buildings NO NA 8 Treatment and disposal of NO NA sewage and sullage water 9 Solid Waste management NO NA &Disposal 10 Water conservation, Rain YES 00% water harvesting 11 Energy management NO NA 12 Fire protection and fire Yes 00% safety requirements 13 Electrical meter room, YES 00% 14 Others (Parking Tower) YES 00% Yours Faithfully ROHIT Digitally signed by ROHIT DHIRAJ PATIL DHIRAJ Date: 2025.04.07 PATIL 11:58:25 +05'30' Shri. Rohit Dhiraj Patil (License No. P/0840000456/LS) M/s. Architectural Concept 802, C-2 Wing, Skyline Wealth Space, Oasis Complex, Premier road, Vidyavihar (W), Mumbai 400 086. Page 3 of 3