PARAS CONSULTANTS K. H. SHAH CONSULTINC ENGINEERS B.E. (Civil) M.I.E. S/197 Regn. No. STR S/33 Office Tel. 2510 1085.2513 3922 E Mail: parasconsultants@yahoo.com Ref. No. Date : Date: 19/07/2025 ANNEXURE B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account Project Wise) For the period 30 June 2025 To. The The Garodia Nagar Mahavirdham CHS Limited, CTS 195/47,Plot No 48-51, Garodia Nagar, Ghatkopar East, Mumbai-40077 Subject: Certificate of Cost Incurred for Development of Garodia Nagar Mahavirdham CHS Limited Plot No 48-512,bearing C.T.S. No. 195/47 at Village Ghatkopar at Garodia Nagar, Kirol, Kurla, Ghatkopar East, Mumbai Suburban Pin Code 400077 Tehsil: Kurla District: Mumbai Suburban 1839.20 Sq. Mts. having MAHARERA Registration Number P51800052562 being developed by Garodia Nagar Mahavirdham CHS Limited Sir. 1. I/We Mr. K. H. Shah of M/s Paras Consultant have undertaken assignment of certifying Estimated Cost for Garodia Nagar Mahavirdham CHS Limited situated on the Plot No 48-512, bearing C.TS. No. 195/47 at Village Ghatkopar at Garodia Nagar, Kirol, Kurla, Ghatkopar East, Mumbai Suburban Pin Code 400077 Tehsil: Kurla District: Mumbai Suburban 1839.20 Sq. Mts. Area having MAHARERA Registration Number P51800052562 being developed by Garodia Nagar Mahavirdham CHS Limited, 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal &external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer /Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labor and other inputs made by developer, andthe site inspection carried out by us toascertain /confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. 25,99,00,000/- (Total of Table A and B) at the time of Registration. The estimated Total. Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal &external oRAs GOM works, as per specifications mentioned in agreement of sale and for the purpose of obtaining ccupationcertificate /completion certificate for the building(s) / Wing(s)/ Layout / Ploted Development from the MCGM being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. ADD: 103, PRINCE PALACE, (JAYANTILAL VAISHNAV XLANE), KHOT LANE GHATKOPARIM O86 MUIMc For Nar Mahavis,Dham C.H.S. Ltd. lathal cOMMIMeE MEMBER AUTHOAISED SIGNATORY PARASCONSULTANTS K. H. SHAH CONSUTINGENGINEERS B.E. (Civil) M.I.E. Regn. No. STR S/33 S/197 Office Tel. 2510 1085,2513 3922 E Mail: parasconsultants@yahoo.com Ref. No. Date: Date: 19/07/2025 4. The Estimated Cost Incurred till date is calculated at Rs.21,73,82,429/- (Total of Table A & B). The amount of Estimated Oost Incurred is calculated on the basis of input materials /services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal &external works, as per specifications mentioned in agreement of sale,of the Project is estimated at Rs.4,25,17,57 1/-(Totalof table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal&external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table Aand Bbelow: TABLE A Building 1 (To be prepared separately for each Building /Wing / Layout /Plotted Development of the Real Estate Project) SR. NO. PARTICULARS AMOUNT (IN RS.) Total Estimated Cost ofthe Building/Wing / Layout Plotted 25,99,00,000/ Development as on date of Registration is Cost incurred as on date of certificate 21,73,82,429/ 2 3 Work done in Percentage (as Percentage of the estimated cost) 75.88% 4.25,17,571/ Balance Cost to he Incurred 4 (Based on Estimated Cost) Estimated Cost Incurred on Additional/Extra items not included in the Cost (Table C) TABLE B Phase Internal & External Development Works in Respect of the Registered PARTICULARS AMOUNT (IN RS.) SR. NO. 1. Total Estimated Cost of the Internal anxd External Development Works including amenities and Facilities in the layout as on date of Registration is 2. Cost incurred as on date of certificate 3. Work done in Percentage (as Percentage of the estimated cost) Estimated (ost) 4 Balance Cost to be incurred (Based on included in the 5. Cost Incurred on Additional/Extra ltems not Estimated Cost (Table C) ADD: 103,PRINCE PALACE, (JAYANTILAL VAISHNAV X LANE), KHOT L ANE GHATKOPAR W) MUMBAL400 086 For roda/Nagar Mahavir Dham C.H.S.Ltd. cOMMTTEE NIEMBER AÚTHORISED SIGNATORY PARAS CONSULTANTS K. H. SHAH CONSULTING ENGINEBRS B.E. (Civil) M.I.E. Regn. No. STR S/33 S/197 Office Tel. 2510 1085. 2513 3922 E Mail: parasconsultants@yahoo.com Ref. No. Date : Yours Faithfully. Agreed and accepted by For Paras Consultant For Garodia Nagar Mahavir Dham C.H.S. Ltd. EONSL K.H. SAH REM..E, MUGA GHARTER.D ENGOERRTEE NBER /AUTTORISEb siGNATORY i-1425 KH Shah STR S/33 NOTE : 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. ()Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity caleulated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should he mentioned at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required Iescalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material usedfrom specifications in agreement of sale. TABLEC List of Extral/Additional/Deleted Items considered in cost (which were not part of original Estimate of Total Cost) SR.NO LIST OF EXTRA/ADDITIONAL/DELETED ITEMS AMOUNT (IN RS) ADD: 103,PRINCE PALACE, (JAYANTILAL VAISHNAV XLANE) KHOT LANE GHATKOPARIWY MUMBAL400 086