Date: 21.11.2025 ANNEXURE A FORM 1 ARCHITECT'S CERTIFICATE To, M/s. Garodia Nagar Mahavir Dham CHS LTD, CTS 195/47, Plot no. 48-51, Garodia Nagar, Ghatkopar (E), Mumbai — 400 077 Sub: Certificate of percentage of completion of construction work of building known as "Mahavirdham" situated at plot no. 48 to 51 bearing CTS No. 195/47 of Village Ghatkopar, at Garodia Nagar Layout, Ghatkopar (East), Mumbai -400077. Admeasuring 1839.20 sq.mts area being developed by promoter M/s. Garodia Nagar Mahavir Dham CHS LTD. Sir, I, MR. DARSHAN R. PATEL have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of building situated at plot no. 48 to 51 bearing CTS No. 195/47 of Village Ghatkopar, at Garodia Nagar Layout, Ghatkopar (East), Mumbai -400077., admeasuring 1839.20 sq.mts area having MAHARERA Registration Number P51800052562 being developed by promoter M/s. Garodia Nagar Mahavir Dham CHS LTD. 1. Following technical professionals are appointed by Developer/ Promoter: - I. Mr. Darshan R. Patel as Architect. II. Mr. Kirtikumar H Shah of M/s. Paras Consultant as Structural Consultants. III. Mr. Abhishek Savenkar as MEP Consultant IV. Mr. Navnath T. Aiwale as Site Supervisor. Based on Site Inspection, with respect to each of the building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51800052562 under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building Number 1 (to be prepared separately for each Building of the Project) SR. TASKS / ACTIVITY IS START COMPLE COMPLETIO DETA NO. AVAILA DATE TION N ILS BLE DATE PERCENTAG (YES E / NO) 1 Excavation YES 05-08-2022 10-10-2022 100% - 2 1 number of Basement YES 15-10-2022 31.12.2022 100% - 3 3 number of Podiums YES 24-02-2023 06-06-2023 100% - 4 Plinth YES 10-01-2023 31-03-2023 100% - 5 Stilt Floor YES 10-01-2023 31-03-2023 100% - 6 19 number of Slabs of Super Structure YES 13-06-2023 31-03-2024 100% - 7 Internal walls, Internal Plaster, Floorings, Floors and windows within Flats/Premises YES 03-08-2023 31-12-2024 100% - 8 Sanitary Fittings within 100% the flats / premises YES 15-07-2024 15-09-2024 - 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks YES 16-08-2024 31-12-2024 100% - 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the building / wing. YES 15-04-2023 30-01-2025 100% - 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical YES 02-07-2024 15.06.2025 100% - equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. TABLE-B Internal and External Development Works in respect of the Registered Phase. SR. COMMON AREAS IS START COMPLE COMPLETIO DETA NO. AND FACILITIES AVAILA DATE TION N ILS BLE DATE PERCENTAGE (YES/NO ) 1 Internal Roads & Footpaths NA - - 0% - 2 Water Supply YES - - 0% - 3 Sewerage (Chamber, lines, Septic Tank, SIP). YES 31-05-2024 01-07-2024 100% - 4 Storm Water Drains YES 30-07-2024 15-09-2024 100% - 5 Landscaping & Tree Planting YES - - 0% - 6 Street Lighting NA - - 0% - 7 Community Buildings NA - - 0% - 8 Treatment and disposal of sewage and sullage water. NA - - 0% - 9 Solid Waste management & Disposal YES 11-08-2021 15-09-2024 100% - 10 Water conservation / 100% Rain water harvesting YES 03-11-2024 15-09-2024 - 11 Energy management NA - - 0% - appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. 12 Fire protection and lire safety requirements YES 05-07-2024 15.06.2025 100% - 13 Electrical meter room, sub-station receiving YES 15-03-2024 02-02-2025 100% - 14 Aggregate area of recreational Open Space - - - - - 15 Open Parking - - - - - 16 OTHERS IF ANY - - - - - For your information, OC for above said building has been received on dated 13.10.2025 and copy of the same is attached. Thanking You, Yours Faithfully, DARSHAN Digitally signed by DARSHAN RAMANLAL AR. DARSHAN R. PATEL RAMANLAL PATEL Date: 2025.11.21 M/S. Eastern Architects PATEL 16:06:37 +05'30' CA/2016/78098 Agreed and accepted by