ARCHITECT YASH AGARWAL CONSULTING ARCHITECT & PROJECT MANAGEMENT CONSULTANT 105 Rajshree Plaza, Opp. Shreyas Cinema, L.B.S. Marg, Ghatkopar (W), Mumbai-400 086. Email - arc.yash@gmail.com Mob. No, 98921 09022 Ref:YA/P58/RERA/L-07/25 Date: 01.04.2025 ANNEXURE A FORM 1 ARCHITECT'S CERTIFICATE To, M/s. Garodia Nagar Mahavir Dham CHS LTD, CTS 195/47, Plot no. 48-51, Garodia Nagar, Ghatkopar (E), Mumbai 400 077 Sub: Certificate of percentage of completion of construction wotk of building known as "Mahavirdham" situated at plot no. 48 to 51 bearing CTS No. 195/47 of Village Ghatkopar, at Garodia Nagar Layout, Ghatkopar (East), Mumbai -400077. Admeasuring 1839.20 sq.mts area being developed by promoter M/s. Garodia Nagar Mahavir Dham CHS LTD. Sir, L, MR. YASH RAJESH AGARWAL have undertaken assignment as Architect of certiftying Percentage of Completion ofConstruction Work of building situated atplot no. 48 to 51 bearing CTS No. 195/47 of Village Ghatkopar, at Garodia Nagar Layout, Ghatkopar (East),Mumbai -400077., admeasuring 1839.20 sq.mts area havingMAHARERA Registration Number P51800052562 being developed by promoter M/s. Garodia Nagar Mahavir Dham CHS LTD. 1. Following technical professionals are appointed by Developer/ Promoter: - Mr. Yash Rajesh Agawal as Architect. Mr.Kirtikumar HShah of M/s. Paras Consultant as StructuralConsultants. Mr. Abhishek Savenkar as MEP Consultant V. Mr. Navnath T. Aiwale as Site Supervisor. Based on Site Inspection, with respect to each of the building of the aforesaid Real Estate Project, I certifythat as on the date of this certificate, the Percentage of Workdone for each of the building of the Real Estate Project as registered vide number PS1800052562 under MAHARERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. NIIRDHAJ Regd. No. BOMIHSG/ 4671of 1975 HSG TABLE-A Building Number 1(to be prepared separately for each Building of the Project) SR. TASKS/ ACTIVITY START COMPLETIO COMPLETION DETAI NO AVAILA DATE N DATE PERCENTAGE LS BLE (YES /NO) Excavation YES 05-08-2022 10-10-2022 100% 2 number of Basement YES 15-10-2022 31.12.2022 100% 3 3 number of Podiums YES 24-02-2023 06-06-2023 100% 4 Plinth YES 10-01-2023 31-03-2023 100% 5 Stilt Floor YES 10-01-2023 31-03-2023 100% 6 19 number of Slabs of Super Structure YES 13-06-2023 31-03-2024 100% 7 Internal walls, Internal Plaster, Floorings, Floors YES 03-08-2023 75% and windows within Flats/Premises 8 Sanitary Fittings within the YES 15-07-2024 5% flats / premises Staircases, Lifts Wells and Lobbies at each Floor level YES 16-08-2024 90% Overhead and UndergrOund Water Tanks 10External plunbing and external plaster, elevation, completion of terraces YES 15-04-2023 65% with waterproofing of the building / wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fitfings, mechanícal YES 02-07-2024 45% equipment, compliance to condifions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving gf areas AHAV Page 2 of 4 Regd. tNo. BOMIHSG/ 4071of 13975) appurtenant to Building/Wing,Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. TABLE-B Internal and External Development Works inrespect of the Registered Phase. SR.NO COMMON AREAS START DATE COMPLE COMPLETION DETAILS AND FACILITIES AVAILABLE TION PERCENTAGE (YES /NO) DATE Internal Roads & NA 0% Footpaths 2 Water Supply YES 0% 3 Sewerage 01-07 (Chamber, lines, YES 31-05-2024 40% 2024 Septic Tank, SIP). 4 Storm Water YES 30-07-2024 80% Drains 5 Landscaping & YES 0% Tree Planting 6 Street Lighting NA 0% 7 Community NA 0% Buildings 8 Treatment and disposal of sewage NA 0% and sullage water. Solid Waste YES 11-08-2021 80% management & Disposal Water conservation / 03-11-2024 60% YES Rain water harvesting 11 Energy NA 0% mándgeme6t Regd. No. B O M / H S G / Page 3 of 4 '571of 1975 12 Fire protection and lire safety YES 05-07-2024 80% requirements 13 Electrical meter room, sub-station YES 15-03-2024 50% receiving 14 Aggregate area of recreational Open Space 15 Open Parking 16 OTHERS IF ANY Thanking You, Yours Faithfully, YASH Digitally signed by Regd. No. YASH RAJESH BOMHSG/ RAJESH AGARWAL Date 2025.04.02 4671 of 1975/ AGARWAL 1637:28 +0530' Yash Rajesh Agarwal (Lic. No. - CA/13/61572) Agreed and accepted by Page 4 of 4