PARAS CONSULTANTS K. H. SHAH CONSULTING ENGINEERS B.E. (Civil) MJ.E. Regn. No. STR SI33 S/197 Mobile : 98673 07061 /62 EMail: parasconsultants@yahoo. com Ref NAS Date - 28/02/2025 ANNEXURE B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated AccountProject Wise) For the period 31" DEC. 2024 The The Garodia Nagar Mahavirdham CHS Limited, CTS 195/47,Plot No 48-51, Garodia Nagar, Ghatkopar East, Mumbai-40077 Subject: Certificate of Cost Incurred for Development of Garodia Nagar Mahavirdham CHS Limited Plot No 48-512, bearing C.T.S. No. 195/47 at Village Ghatkopar at Garodia Nagar, Kirol, Kurla, Ghatko par East, Mumbai Suburban Pin Code 400077 Tehsil: Kurla District: Mumbai Suburban 1839.20 Sq. Mts. having MAHARERA Registration Number P51800052 562 being developed by Garodia Nagar Mahavirdham CHS Limited Sir. 1. IWe Mr. K. H. Shah of M/s Paras Consultant have undertaken assignment of certifying Estimated Cost for Garodia Nagar Mahavirdham CHS Limited situated on the Plot No 48-512, bearing C.T.S. No. 195/47 at Village Ghatkopar at Garodia Nagar, Kirol, Kurla, Ghatkopar East, Mumbai Suburban Pin Code 400077 Tehsil: Kurla District: Mumbai Suburban 1839.20 Sq. Mts. Area having MAHARERA Registration Number P51800052562 being developed by Garodia Nagar Mahavirdham CHS Lìmited 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal &external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer /Consultants. The Schedule of items and quantity required for the entire work as calculated by. Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labor and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. 25,99,00,000/- (Total of Table A and B) at the time of Registration. The estimated Total, Cost of project is with reference to the Civil, MEP and Alied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/t completion certificate for the building(s) / Wingts/Layout / Plotecd Dovelopment from the MCGM being the Planning Authority under whosRAOO the aforesaid projee heingimplemented. AUTORISEDSIGNATORY ADD: 103,PRINCE PALACE,(JAYANTILAL VAISHNAVXLANE), KHOT LANE, GHATKOPAR (W), MUMBA|-400 086. PARAS CONSULTANTS CONSULTING ENGINEERS K. H.SHAH B.E. (Civil) M.I.E. Regn. No. STR SI33 S/197 Mobile : 98673 07061 /62 E Mail: parasconsultants@yahoo.com Date Ref. No. 18.28.81,451/- (Total of Table A nd B). 4. The Estimated Cost Incurred till date is calculated at Rs. basis of input materials /services used and The amount of Estimated Cost Incurred is calculated on the unit cost of these items. 5. The Balance Cost of Completion of the Civil.internal MEP and Allied works for completion of the & external works, as per specifications apartments and proportionate completion of Rs. 7,70,18,549/-(Total of able A and mentioned in agreement of sale, of the Project is estimated at B). work for the apartments and proportionate internal & 6. Icertify that the Cost of the Civil, MEP and alliedagreement externalworks, as per specifications mentioned in of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Layout /Plotted Development Building 1(To be prepared separately for each Building /Wing / of the Real Estate Project) PARTICULARS AMOUNT (N RS.) SR. NO. 1 Total Estimated Cost of the Building/Wing/ Layout 25,99,00,000/ Plotted Development as on date of Registration is 18,28,81,451/ 2 Cost incurred as on date of certificate 31.12.2024 70.36% 3 Work done in Percentage (as Percentage of the estimated cost) Balance Cost to he Incurred 7,70,18,549/ 4 (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra items not included in the Estimated Cost (Table -C) TABLE B Internal &External Development Works in Respect of the Registered Phase SR. NO. PARTICULARS AMOUNT (IN RS.) 1. Total Esimated Cost of the Internal and External Development Works including amenities and Facilities AEOaavir/pham RHAVFO C.H. in the layout as on date of Registration is 2 Cost incurred as on date of certificate 3 Work done in Percentage (as Percentage of the eoMMITTEEMEMBEROTHORISE SI 4 5. estimated cost) Balance Costto be incurred(Based on Estimated Cost) EOE Cost Incurred on Additional/Extra Items not included in the GONSA Fstimated CGost (Table ADD: 103,PRINCE PALACE, (JAYANTILAL VAISHNAV X LANE) KHOT LANE, GHATKOPAR (W), MUMBA|-400 086. ARAS CONSULTANTS CONSULTING ENGINEERS K. H. SHAH B.E. (Civii) M.I.E. Regn. No. STR S/33 S/197 Mobile :98673 07061 / 62 E Mail: parasconsultants@yahoo. com Ref. No. Date - Yours Faithfully, Agreed and accepted by For Paras Consultant ONSU AANTS MUMBAJ CHAKTEREDENGINEER SEMA.E. KH Shah M-1942S STR S/33 NOTE: Estate Project as per drawings approved 1. The scope of work is to complete Registered Real agreement of sale. from time to time and as per specifications mentioned in Engineer or can be done by an independent 2. () Quantity survey can be done by office of calculated can be relied upon by the Quantity Surveyor, whose certificate of quantity appointed by Developer, the name Engineer. In case of independent quantity surveyor being quantity are being calculated by has to be mentioned at the place marked (*)and in case Engineer, who is responsible for the of office of Engineer, the name of the person in the office quantity calculated should he mentioned at the place marked (*). Difference between Total estimated Cost 3. (**) Balance Cost to be incurred (4) may vary from required I escalation of cost etc. (1) and Actual Cost incurred (2) due to deviation in quantity development of the Real As this is an estimated cost, any deviation in quantity required for incurred. Estate Project will result in amendment of the cost incurred / to be exhaustive. 4. Allcomponents of work with specifications are indicative and not 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra/Additional/Deleted Items considered in cost (which were not part of original Estimate of Total Cost) SR.NO LIST OF EXTRA/ADDITIONAL/DELETED ITEMS AMOUNT (IN RS) CARODA NA Ltd. C.H.S. 2 Dham Mahavir NagarMBERAUTHORISED SIGNATORY OSH dO-09 Garodia For Mo ADD: 103,PRINGE PALACE, (JAYANTILAL VAISNAV XLANE), KHOT LANE, GHATKOPAR (W), MUMBA-400 086.