ARCHITECT YASH AGARWAL CONSULTANT PROJECT MANAGEMENT CONSULTING ARCHITECT & Mumbai-400 086. Opp. Shreyas Cinema, L.B.S. Marg,Ghatkopar (W), 105 Rajshree Plaza, Email- arc,yash@gmail.com Mob. No, - 98921 09022 Ref :YA/P58/RERA/L-06/25 Date: 03.01.2025 ANNEXURE A FORM 1 ARCHITECT'S CERTIFICATE To, Dham CHS LTD, M/s.Garodia Nagar Mahavir CTS 195/47, Plot no. 48-51, Garodia Nagar, Ghatkopar (E), Mumbai 400 077 building completion of construction work of Sub: Certificate of percentage of plot no. 48to 51 bearing CTS No. known as "Mahavirdham" situated at Nagar Layout, Ghatkopar (East), 195/47 of Village Ghatkopar, at Garodia area being developed by Mumbai -400077. Admeasuring 1839.20 sq.mts Dham CHS LTD. promoter M/s. Garodia Nagar Mahavir Sir, undertaken assignment as Architect of , MR. YASH RAJESH AGARWAL have Work of building situated at plot no. certifying Percentage of Completion of Construction Ghatkopar, at Garodia Nagar Layout, 48 to 51 bearing CTS No. 195/47 of Village sq.mts area having MAHARERA Ghatkopar (East), Mumbai -400077., admeasuring 1839.20 promoter M/s. Garodia Nagar Registration Number P51800052562 being developed by Mahavir Dham CHS LTD. Developer/ Promoter: - 1. Following technical professionals are appointed by Mr. Yash Rajesh Agarwal as Architec. Mr. Kirtikumar H Shah of M/s. Paras Consultant as Structural Consultants. Mr. Abhishek Savenkar as MEP Consultant V. Mr, Navnath T. Aiwale as Site Supervisor. Based on Site Inspection, with respect to each of the building of the aforesaid Real Estate Project, I certity thatas on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51800052562 under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. C.H.S.Ltd. Dham Mahavir RODIA ANAGA pl Negar SIGNATORY AUTHORISED EMTEEMEMBER o TABLE-A separately for each Building of the Project) Building Number 1(to be prepared COMPLETIO COMPLETION DETAI TASKS/ACTIVITY IS START PERCENTAGE LS SR. DATE N DATE AVAILA NO BLE (YES /NO) 05-08-2022 10-10-2022 100% Excavation YES 15-10-2022 31.12,2022 100% YES 2 1number of Basement 24-02-2023 06-06-2023 100% YES 3 3 number of Podiums 10-01-2023 31-03-2023 100% YES 4 Plinth 10-01-2023 31-03-2023 100% Stilt Floor YES 5 6 19 number of Slabs of 13-06-2023 31-03-2024 95% YES Super Structure 7 Internal walls, Internal Plaster, Floorings, Floors 03-08-2023 70% YES and windows within Flats/Prenmises 8 Sanitary Fittings within the YES 15-07-2024 5% flats / premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 707% YES 16-08-2024 Overhead and UndergrOund Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces YES 15-04-2023 65% with waterproofing of the building / wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fitfings, mechanical equipment, compliance to YES 02-07-2024 35% conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas GarodiaNegar C.H.s Mahariu ERODIA For SIGNATORY Page 2 of 4 AUTHORISED MEMBER COMMITTEE Ma appurtenant to Building/Wing, Compound Walland all other requirements as may be required to complete project as per specifications in agreement of Sale. TABLE-B in respect of the Registered Phase. Internal and External Development Works COMPLETION DETAILS START DATE COMPLE SR.NO COMMON AREAS PERCENTAGE AVAILABLE TION AND FACILITIES DATE (YES /NO) Internal Roads & 0% NA Footpaths 0% 2 Water Supply YES 3 Sewerage 01-07 30% (Chamber, lines, YES 31-05-2024 2024 Septic Tank, SIP). 4 Storm Water YES 30-07-2024 80% Drains 5 Landscaping & YES 0% Tree Planting NA 0% 6 Street Lighting 7 Community NA 0% Buildings 8 Treatment and disposal of sewage NA 0% and sullage water. 9 Solid Waste YES 11-08-2021 60% management & Disposal 10 Water conservation / YES 03-11-2024 50% Rain water harvesting 11 Energy NA amC.H/s.Ltd. management ahavir 6ARO GarbelaNogar eFor GNATORY AUTHORISEPa of 4 SHI MEMBER PcoMMITTEE dO-09 12 Fire protection and ire safety YES 05-07-2024 50% requirements 13 Electrical meter room, sub-station YES 15-03-2024 40% receiving 14 Aggregate area of recreational Open Space 15 Open Parking 16 OTHERS IF ANY Thanking You, Yours Faithfully., GARODIAD fronrMahavirDhamC.H.S. Ltd. YASH Digitally signed by YASH RAJESH ForGarglia RAJESH AUTHORISEDSIGNATORY NWAL :2025.01.03 AGARWAL 19:29:10 +05'30' eOMMITTÉE MEMBER Yash Rajesh Agarwal (Lic. No. -CA/13/61572) Agreed and accepted by Page 4 of 4