Ref : YA/P58/RERA/L-02/23 Date: 03.11.2023 ANNEXURE A FORM 1 ARCHITECT'S CERTIFICATE To, M/s. Garodia Nagar Mahavir Dham CHS LTD, CTS 195/47, Plot no. 48-51, Garodia Nagar, Ghatkopar (E), Mumbai – 400 077 Sub : Certificate of percentage of completion of construction work of building known as “Mahavirdham” situated at plot no. 48 to 51 bearing CTS No. 195/47 of Village Ghatkopar, at Garodia Nagar Layout, Ghatkopar (East), Mumbai -400077. Admeasuring 1839.20 sq.mts area being developed by promoter M/s. Garodia Nagar Mahavir Dham CHS LTD. Sir, I, Shri. Yash Rajesh Agarwal, have undertaken assignment as Architect. Certifying Percentage of Completion of Construction work of building situated at plot no. 48 to 51 bearing CTS No. 195/47 of Village Ghatkopar, at Garodia Nagar Layout, Ghatkopar (East), Mumbai -400077., admeasuring 1839.20 sq.mts area being developed by promoter M/s. Garodia Nagar Mahavir Dham CHS LTD. Following technical professionals are appointed by Promoter: 1. Shri. Yash Rajesh Agarwal as Architect 2 Shri. Kirtikumar H Shah as Structural Consultant 3 Shri. Abhishek Savenkar as MEP Consultant 4 Shri. Navanath Aiwale as site Engineer. Based on Site Inspection, with respect to the building of the aforesaid Real Estate Project, I certify that as on the date of this certificate. The Percentage of the work done of the building of the Real Estate Project as registered vide number P51800052562 under Maharera is as per table ’A’ herein below. The Percentage of the work executed with respect to each of the activity of the entire Phase is detailed in Table ’B’. Table A: % OF WORK SR. NO. TASK/ACTIVITY DONE 1 Excavation 100% 2 1 number of Basement 100% 3 3 number of Podiums 100% 4 1 Plinth/ Stilt Floors /Ground floor 100% 5 19 number of Slabs of Super Structure 60% Internal walls, Internal Plaster, 6 10% Floorings, Doors and Windows within Flats/ Premises Sanitary Fittings within the Flat/ Premises 7 0% Electrical Fittings within the Flat/Premises Staircase, lifts, wells and lobbies at each 8 Floor level connecting Staircase and lifts overhead 0% and Underground water Tanks. The external plumbing and external 9 plaster elevation completion of terraces with 0% waterproofing of the Building/Wing Installation of lifts., water pumps, Fire Fighting fittings and Equipment as per CFO NOC Electrical fittings to common areas electro, Mechanical equipment, Compliance to conditions of 10 environment/ CRZ NOC Finishing to entrance lobby/ s 0% plinth protection paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to obtain Occupation/Completion certificate. Table B: Internal & External Development Works in Respect of the entire Registered Phase Sr. COMMON AREAS AND PROPOSED PERCENTAGE OF DETAILS No. FACILITIES, AMENITIES (YES/NO) WORK DONE 1 Internal Roads & Foothpaths No 0% 2 Water Supply Yes 0% 3 Sewerage (chamber, lines) Yes 0% 4 Storm Water Drains Yes 0% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting Yes 0% 7 Community Buildings No 0% Treatment and disposal of 0% 8 No sewage and sullage water Solid Waste management & 0% 9 No Disposal Water conservation, Rain 0% 10 Yes water harvesting 11 Energy management No 0% Page 2 of 3