S. H. MHATRE ARCHITECTS & INTERIOR DESINGER 4 & 5, ACME SHOPPING ARCADE, GROUND FLOOR, CINESTAR COMPOUND, TRIKAMDAS ROAD, KANDIVALI-WEST, MUMBAI-400 067. Tel: 022 28083797. Mob.99670 53231 Email: sank.mhatre@gmail.com Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 26.08.25 To, NEE-RAA ENTERPRISES MUMBAI SUBURBAN, MAHARASHTRA, 400067 MahaRERA Subject:Certificate of percentage of Work of completion of construction work of MALAD WEBB having Registration Number P51800052532 (Only Applicable after project Registartion) being developed by NEE-RAA ENTERPRISES Sir, Surveyor of certifying Percentage of IWe SANKET MHATRE have undertaken assignment as Architect /Licensed Registration Number P51800052532 (Only completion of Construction Work of MALAD WEBB having MahaRERA ENTERPRISES) Applicable after project Registration,being developed by NEE-RAA Building/Wing of the aforesaid Real Estate Project I Based on Site Inspection, with respect to Layout / each of the Work done for each of the building Wing of the Real certify that as on the date of this certificate, the Percentage of below. The percentage of the work executed with respect to Estate Project under MahaRERA is as per Table A herein B. each of the activity of the entire phase is detailed in Table Table A Layout/Building/Wing Number: Malad Webb/NA Percentage of Actual Work Sr. No. Tasks/Activity Done (As on date of the Certificate) (2) (3) (1) 100.00 1 Excavation 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 100.00 Plinth, 0.00 Stilt Floor 0.00 6 Slabs of Super Structure windows within 0.00 7 |Internal walls, lnternal plaster, Floorings, Floors and Flats/Premises 0.00 Sanitary Fitting within the Flat/Premises Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 |Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0.00 |waterproofing of the Buildingwing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound WNall and all'other requirements as may be required to complete project as per specifications in agreement of |Sale. Any other activities. Table B-Common Areas (nternal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) |Internal Roads & Footpaths No 0.00 NA 1 Yes 0.00 2 |Water Supply 3 Sewerage(Chamber, Lines, Septic Tank, STP) Yes 100.00 Storm Water Drains Yes 0.00 4 No 0.00 NA 5 Landscaping & Tree Planting No 0.00 NA 6 Street Lighting No 0.00 NA 7 Community Buildings 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA Yes 100.00 0 Solid Waste Management And Disposal 10 Water conservation /Rain water harvesting Yes 0.00 N 0.00 NA 11 Energy managemcnt 12 Fire protection and fire safety requirements Yes 0.00 Yes 0.00 13 Electrical meter room, sub-station, receiving station 14 Aggregate area of recreational Open Space No 0.00 NA No 0.00 NA 15 Open Parking Yours Faithfully SANKET MHATRE Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License No: cal2010/49891) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: NEE-RAA ENTERPRISES Date: 2 0 8 . o 2 5 Page 3 of 3