BRIHANMUMBAI MUNICIPAL CORPORATION ANNEXURE 20 & 22 OCCUPATION CUM BUILDING COMPLETION CERTIFICATE UNDER REG. 11(6) OF DCPR 2034 AND FULL OCCUPATION UNDER REG. 11(7) /11(8) OF DCPR 2034 [P-7666/2021/(541D AND OTHER)/R/N WARD/EKSAR (S) R/N/OCC/1/NEW of 16 March 2026] To, Shri Tarun R Dave GR. FLOOR, HARDIK, 120' LINK ROAD, KANDARPADA, DAHISAR (WEST), MUMBAI - 400068. Dear Applicant, The Full development work of Resi+comm building comprising of Ground (pt.) for Cultural Activities + Stilt (pt.) for Mechanized Pit type Stack Parking + 1st (pt.) for Fitness Center and 1st (pt.) for Mechanized Parking + 2nd to 15th upper floors for Residential use on plot bearing CTS No. 541D, 540C, 544 of village EKSAR (S) R/N at Holy Cross Road, I.C. Colony, Borivali (West), Mumbai - 400103 is completed under the supervision of Shri. Divyesh H. Parekh , Licensed Surveyor , Lic. No. P/444/LS , Shri. Rupesh Ramchandra Chowdhary , Structural Engineer, Lic. No. STR/C/40 and Shri. Mr. ASGARI FAKHRUDDIN GINWALA , Site supervisor, Lic.No. Sup/Grade I:840010435 and as per development completion certificate submitted by Licensed Surveyor and as per completion certificate issued by Chief Fire Officer u/no. P-7666/2021/(541D And Other)/ R/N Ward/ EKSAR (S) R/N-CFO/1/New dated 21 February 2026 . The same may be occupied and completion certificates submitted as sighted above are hereby accepted. Copy To : 1. Asstt. Commissioner, R/N Ward 2. A.A. & C. , R/N Ward 3. EE (V), Western Suburb II 4. M.I. , R/N Ward 5. A.E.W.W. , R/N Ward 6. Licensed Surveyor, Divyesh H. Parekh, 1105, Solitaire Business Center, GulMohar Road, Borivali (W), Mumbai - 92. For information please Digitally signed by SANTOSH HARISHCHANDRA SANKHE Date: 16 Mar 2026 14:35:31 Organization :Brihanmumbai Municipal Corporation Designation :Executive Engineer Authority_Sign Yours faithfully Executive Engineer (Building Proposal) Brihanmumbai Municipal Corporation R/N Ward P-7666/2021/(541D AND Page 1 of 2 On 16-Mar-2026 OTHER)/R/N WARD/EKSAR (S) R/N/OCC/1/NEW P-7666/2021/(541D AND Page 2 of 2 On 16-Mar-2026 OTHER)/R/N WARD/EKSAR (S) R/N/OCC/1/NEW CAR PARKING STATEMENT P-7666 /2021/(541D AND OTHER)/R/N WARD /EKSAR (S) R/N RERA CARPET AREA STATEMENT AS PER DCPR - 2034 5.65 01 37.28 01/02 (O.C.C. PLAN) COMMERCIAL (CULTURAL ACTIVITIES) NOS. OF CARS PER PARKING 02 .20 18 12.10 RERA CARPET AREA IN SQ.MT. 30 .80 FLATS FLATS REQD. 03 04 1.4 FLOOR RERA CARPET 9 TOTAL NO. UPTO TO 45.00 SQ.MT 3.25 1 AREA IN SQ. MT. 13.00 1/4 7.7 4.03 8.05 05 PROFORMA -I GROUND FLOOR 9.77 SQ.MT. 1.00 NOS. 45.00 SQ.MT. TO 60.00 SQ.MT NIL 1/2 NIL P.C.C. Coping 8.76 45 I AREA STATEMENT SQ.MT. TOTAL 1.00 NOS. 07 5. 0.23m thick 60.00 SQ.MT. TO 90.00 SQ.MT 14.00 1/1 14.00 PLOT AREA DIAGRAM 2. 67 06 Brick Wall 1 AREA OF PLOT 513.00 SCALE 1:500 (a) AREA OF RESERVATION IN PLOT --------- 2.40mt 90.00 SQ.MT. ABOVE NIL 2/1 NIL 0.10m thick (b) AREA OF ROAD SET BACK --------- RERA CARPET AREA STATEMENT P.C.C. Coping TOTAL 27.00 17.25 (c) AREA OF D.P ROAD --------- (FOR PARKING PURPOSE ONLY) THIS DRAWING ACCEPTED AS FULL COMPLETION PLANS AS ACCOMPANIMENT 5% FOR VISITORS RESI. = 0.86 NOS. PLOT AREA CALCULATIONS Ground Level 2 DEDUCTIONS FOR - 1.00 OF ACCEPTANCE OF B.C.C. BY THIS OFFICE LETTER ISSUED (A) FOR RESERVATION/ROAD AREA TO BE HANDED OVER TO MCGM (100%) SAY = 1.00 NOS. RERA CARPET TOTAL NO. ADDITIONS:- UNDER NO. P-7666 /2021/(541D AND OTHER)/R/N WARD /EKSAR (S) R/N (a) ROAD SET-BACK/WIDENING AREA (REGULATION NO. 16) --------- FLOOR FLAT NOS. CULTURAL ACTIVITIES AREA = 11.14 SQ.MT (b) AREA IN SQ.MT. OF FLATS 1.00 01 37.28 X 5.65 X 0.50 X 1 NO = 105.31 SQ.MT. PROPOSED D.P ROAD AREA (REGULATION NO. 16) --------- FOR COMMERCIAL 1 PARKING / 150.00 SQ.MT. SIGNED ON EVEN DATE. EARTH Filling (c) (i) RESERVATION AREA (PLOT) TO BE HANDED OVER (REGULATION NO. 17) --------- 1ST FLOOR FITNESS CENTER 02 37.28 X 12.10 X 0.50 X 1 NO = 225.54 SQ.MT. 10% FOR VISITORS COMMERCIAL 2.00 NOS. RUBBLE Masonary WATER TANK THIS PLAN IS DIGITALLY SIGNED AND ISSUED. (ii) RESERVATION AREA TO BE HANDED OVER AS PER AR (REGULATION NO. 17) 03 30.20 X 7.71 X 0.50 X 1 NO = 116.42 SQ.MT. --------- 2ND TO 6TH, 8TH 01 40.57 SQ.MT. 13 NOS. WITH SUBMERGIBLE PUMP (NOT TO BE DEDUCTED FOR COMPUTATION OF FSI I.E. SR.NO.5 BELOW) 04 18.80 X 1.49 X 0.50 X 1 NO = 14.00 SQ.MT. 0.15m thick THIS DRAWING SHALL BE READ IN CONJUNCTION WITH BUILDING COMPLETION TO 15TH FLOOR TOTAL PARKING REQUIRED 21.25 SAY- 21.00 NOS. P.C.C. Bedding 600 Ø MANHOLE TOTAL AREA UNDER ROAD / RESERVATION --------- 02 60.37 SQ.MT. 13 NOS. WATER LVL. CERTIFICATE UNDER THE PROVISION OF REG.11 ( 6 ) AND FULL OCCUPATION 05 8.05 X 4.03 X 0.50 X 1 NO = 16.22 SQ.MT. .15 (B) FOR AMENITY AREA TO BE HANDED OVER TO MCGM REFUGE FLOOR & TOTAL PARKING PROPOSED 21.00 NOS. SECTION THROUGH CERTIFICATE UNDER THE PROVISION OF REG.11 ( 7 ) OF DCPR 2034 ISSUED (a) AREA OF AMENITY PLOT AS PER DCR 14(A) --------- 7TH FLOOR 01 06 8.76 X 5.45 X 0.50 X 1 NO = 23.87 SQ.MT. STILT LVL. SOCIETY OFFICE .30 .30 (b) AREA OF AMENITY PLOT AS PER DCR 14(B) --------- (REFUGE FLOOR) BIG CAR PARKING = 16.00 NOS. UNDER NO. P-7666 /2021/(541D AND OTHER)/R/N WARD /EKSAR (S) R/N /OCC/1/NEW 02 60.37 SQ.MT. 1 NOS. SMALL CAR PARKING = 5.00 NOS. 07 8.76 X 2.67 X 0.50 X 1 NO = 11.69 SQ.MT. COMPOUND WALL (d) AREA OF AMENITY PLOT AS PER DCR 35 --------- TOTAL = 513.05 SQ.MT. SCALE 1:50 1.90 1.65 SIGNED ON EVEN DATE TOTAL NOS OF FLAT 27.00 NOS. TOTAL CAR PARKING = 21.00 NOS. TOTAL AMENITY AREA --------- U.G. TANK SAY = 513.00 SQ.MT. (C) DEDUCTIONS FOR EXISTING BUA TO BE RETAINED IF ANY / LAND COMPONENT OF EXISTING --------- BUA/EXISTING BUA AS PER REGULATION UNDER WHICH THE DEVELOPMENT WAS ALLOWED 3 TOTAL DEDUCTIONS: [2(A) + 2(B) + (C)] --------- 21.30 21.30 SECTION THROUGH U.G.TANK 4 BALANCE AREA OF PLOT (FOR CALCULATING REQUIRED LOS) [1-3] 513.00 3.20 4.25 2.45 1.20 10.20 3.20 4.25 2.45 1.20 10.20 A X A SCALE = 1:100 5 PLOT AREA UNDER DEVELOPMENT [SR. NO. 4 + 2 (A) (C) (II)] 513.00 0.50 MT WIDE CHAJJA 0.50 MT WIDE CHAJJA 0.50 MT WIDE CHAJJA 0.50 MT WIDE CHAJJA SITE U/R BUILT UP AREA SUMMARY 6 ZONAL (BASIC) FSI (0.50 OR 0.75 OR 1 OR 1.33) ONE 0.50 0.85 VOID CHAJJA BELOW CHAJJA BELOW CHAJJA BELOW 0.50 0.85 VOID CHAJJA BELOW (a) VOID 0.85 MT WIDE CHAJJA VOID CHAJJA BELOW GR. TO 15TH UPPER FLOORS. 7 PERMISSIBLE BUILT UP AREA AS PER ZONAL (BASIC) FSI (5 X 6) 513.00 CONSORT 4.50 MT. HEIGHT PARAPET BUILDING B.U.A. OF STAIRCASE (b) PERMISSIBLE BUILT UP AREA AS PER REGULATION 30 (C) (PROTECTED DEVELOPMENT) NIL TOTAL BUILDING HEIGHT = 50.30 MT. VEER HANUMAN NAGER ROAD TOILET 0.60 M. WIDE PATH WAY TOTAL B.U.A EXCESS B B 1.50 MT. HEIGHT B WALL 60% OPENABLE B LIFT & LIFT LOBBY 1.50 MT. HEIGHT 0.60 M. WIDE PATH WAY FLOOR TOILET AREA (E) PERMISSIBLE BUILT UP AREA (7A OR 7B ABOVE, WHICHEVER IS MORE) 513.00 KITCHEN KITCHEN RESIDENTIAL RESIDENTIAL (D) 8 2.30 X 1.25 ADDITIONAL BUA AS PER REGULATION 30(A)(3)(A) 0.15 CORNICE @ BEAM BOTTOM EKTA DAS --------- 0.15 CORNICE @ BEAM BOTTOM M- BED ROOM 2.15 X 2.75 2.15 X 2.75 M- BED ROOM NORTH DARSHAN VIVEK GROUND FLOOR 11.14 SQ.MT. NIL NIL 3.90 2.15 X 1.20 3.90 PARAPET WALL BUILDING 4.25 13.40 M. WIDE EXISTING R O A D BUILDING (a) ADDITIONAL BUA FOR 2 (A)(C)(I) & 2(B) ABOVE WITHIN THE CAP OF "ADMISSIBLE TDR" PARAPET WALL 4.25 2.90 X 3.60 3.00 X 3.95 NEW LINK ROAD -------- 4.50 MT. WIDE GATE REMOVABLE BOLLARD 6.00 MT. WIDE GATE CHAIN LINK GATE ENTRY / EXIT W.CABIN C.T.S. NO. 541 D 1.75 X 1.55 3.08 3.42 3.33 3.04 3.07 3.57 3.03 AS PER TABLE NO. 12 ON BALANCE PLOT. 4.52 4.53 4.54 4.61 4.63 4.67 GOLDERS GOLDERS 25.51 SQ.MT. 5.57 0.30 MT WIDE CHAJJA TERRACE GARDEN OPEN TO SKY BUILDING LINE ABOVE JESSAMINE LIVING LIVING BUILDING LINE ABOVE C.T.S. NO. 540 C 21.30 6.05 C OPEN PLOT 1ST FLOOR 4.70 5.20 1.20 2.45 7.75 GREEN GREEN 41.87 SQ.MT. NIL 8.17 0.60 M. WIDE PATH WAY A B BUILDING 1.20 M.S. STEPS S (FITNESS CENTER) X B B ABOVE 15TH FLOOR (b) 13 BUILDING -A BUILDING -B ADDITIONAL BUA FOR 2 (A)(A) & 2(A)(B) ABOVE TO BE UTILIZED OVER AND ABOVE THE 5.54 01 + 0.30 MT. LEVEL. 1.15 X 2.90 X 5.45 3.05 X 5.85 B B R.S. 05 09 01 + 0.30 MT. LEVEL. 14 TERRACE GARDEN OPEN TO SKY CULTURAL ACTIVITIES 02 ELE. METER ELE. METER T 4 STACK PARKING EA SPACE SPACE 4 STACK PARKING 06 10 15 THE SLAB OF THE U.G. TANK SHALL 2.45 4.25 X 2.30 S U.G. TANK FOR FIRE FIGHTING, 1.45 4 STACK PARKING 03 2.73 2 PIT 2 STACK 1.00 1.45 RERA C.A. 9.77 SQ.MT. 04 07 11 16 13.40 M. WIDE EXISTING ROAD HOLY CROSS ROAD (FREE OF F.S.I.) --------- DINING ABOVE 15TH FLOOR 1.5 1.35 LIFT - 1 F.D. LIFT - 2 08 12 DOMESTIC PURPOSE & FLUSHING 6.52 WA PERMISSIBLE FSI AS PER COLUMN NO. 7 OF TABLE 12 OF REGULATION 30(A) AND TO THE PLOT BOUNDARY AS PER C.T.S. PLAN R.C.C. WALL 1.95 X 1.80 1.00 MT 1.80 X 1.80 Y W.R.WIDE NISCHITA 4 S. TOI. CHJJA IVE PURPOSE 0.35 1.40 2.02 X 1.20 LIFT -1 LIFT -2 BE DESIGNED TO BEAR VEHICULAR LOAD + 1.10 MT. LEVEL. DR MHATRE 2ND FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL + 1.10 MT. LEVEL. AY 8.40 AKSHITA LIFT -1 LIFT -2 AKSHITA LOBBY 8.22 RERA C.A. 6.56 F.D. 9 ENTRANCE LOBBY 1.7 5.90 X 1.50 TW OW BUILDING MENTIONED IN TABLE 12 A OF REGULATION 32 (200% OR 250%) F.D. 1.8 2.90 X 1.70 E.C. 1.95 X 1.80 1.80 X 1.80 RERA C.A. 2.65 0 FIRE MAN 4 STACK PARKING 6.07 OF 48 MT. & POINT LOAD OF 10KG/CM2 AVENUE AVENUE HOTEL I.C. COLONY ROAD EVACUATION UP TOILET 40.57 SQ.MT. 1.00 MT 1.95 X 1.80 1.00 MT 1.80 X 1.80 W ES 1.5 0 1.50 2.00 1.50 LIFT 1.50 X 1.40 17 18 19 20 B 3.30 6.22 BUILDING -A BUILDING -B 9.85 3.40 X 1.40 WIDE 60.37 SQ.MT. T 1.5 CHAJJA FIRE CUTOFF 3RD FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL (c) ADDITIONAL BUA IN CASE OF 2(A)(C)(II) AS PER REGULATION 17 (1) NOTE 20 (VII) & (VIII) 9.85 0 1.95 1.50 WIDE 1.5 LOBBY W.R. 5 DE 1.60 X 1.50 TOILET 9.41 CHAJJA VOID WI W.R. + 0.15 MT. LEVEL. C --------- T 0.45 2.02 X 1.20 M S CHAJJA 5 VOID 2.57 9.85 0.1 0.25 MT WIDE CHAJJA 0.35 1.40 2.12 PL 2.15 2.25 0.84 2.21 1 7.15 3.85 2.15 0.70 1.8 1.73 1.77 EKTA VIVEK 0.35 1.40 PH OT 1.72 21.30 21 YS BO A 2.30 X 1.25 IC U AL ND THE HDFC BUILDING AS PER AR POLICY ON REMAINING PLOT. PO AR SS Y A C.T.S. NO. 544 THE PHILIP 4TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL F.R.D 0.30 MT WIDE F.R.D ES S SI PE ROCK GARDEN GOVINDA TOWER --------- ON R SOUTH BANK TOTAL ADDITIONAL BUA ON M.S. LADDER EGGS F.R.D 01 PLOT BOUNDARY 1.50 0.60 0.85 1.35 M.S. PLAT FORM SI T AS PER C.T.S. PLAN BUILDING BUILDING LOBBY 02 1.50 0.60 0.85 1.35 E VOID S.S. LOBBY SP AC LAND 5TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL 0.30 MT WIDE EF 9.85 OR CHAJJA VOID S.S. PU MP F.R.D 5.80 X 1.50 5.80 X 1.50 N 9 ADDITIONAL / INCENTIVE BUA WITHIN THE CAP OF "ADMISSIBLE TDR" AS PER TABLE 12 CHAJJA BLOCK PLAN HOTEL HOTEL THE I.C. BANJARA --------- 0.50 MT WIDE CHAJJA 0.90X0.45 UP F.R.D E.C. 6TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL 0.70 MT WIDE CHAJJA 0.15 CORNICE @ BEAM BOTTOM F.R.D E.C. E ON BALANCE PLOT BANJARA BANJARA GARAGE DHABA 0.15 CORNICE @ BEAM BOTTOM CHAJJA BELOW SCALE = 1: 500 0.30 MT WIDE CHAJJA (a) CHAJJA BELOW W IN LIEU OF COST OF CONSTRUCTION OF AMENITY BUILDINGS AS PER REGULATION 30(A)(3)(B) --------- F.R.D FIRE MAN FIRE MAN S 7TH FLOOR EVACUATION LIFT 66.00 SQ.MT. 43.13 SQ.MT. 0.25 SQ.MT (b) 15% OF SR. NO. 7B ABOVE OR 10 SQMTS PER REHAB TENEMENT AS PER REG. 33(7)(A) --------- UP BED ROOM EVACUATION MACHINE (REFUGE FLOOR) 3.30 3.30 LIFT LIFT ROOM LOCATION PLAN N (c) 50% OF OF REHAB COMPONENT AS PER REG. 33 (7)(B) OR ------- 3.75 1.50 X 1.40 3.65 X 3.00 1.35 X 1.35 V 3.75 1.50 X 1.40 2.00 1.50 1.50 2.00 1.50 8TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL SCALE -1:4000 E TOTAL ADDITIONAL BUA / INCENTIVE AREA --------- FIRE CUTOFF 4.55 W DP SHEET NO. - WS 68 10 F.R.D UP BUA DUE TO "ADDITIONAL FSI ON PAYMENT OF PREMIUM" AS PER TABLE NO. 12 OF FIRE CUTOFF 9TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL F.R.D DN 1.50 LOBBY S 256.50 DN 1.50 LOBBY 1.60 X 1.50 REGULATION NO 30(A) [SR.NO.5 X 50%] (513.00 SQ.MT. X 50%) 2.45 1.60 X 1.50 0.15 0.40 10TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL 0.25 MT WIDE CHAJJA 0.15 CORNICE @ BEAM BOTTOM 0.40 A 11 BUA DUE TO ADMISSIBLE "TDR" AS PER TABLE NO 12 OF REGULATION NO 30(A) & 32 0.25 MT WIDE CHAJJA 11TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL (BY RESTRICTING AREA UTILISED IN SR. NO. 8(A) & 9 ABOVE) (513.00 * 0.70 = 359.10) 0.15 CORNICE @ BEAM BOTTOM i) GEN. T.D.R. : 001033 = 280.13 SQ.MT. 359.10 2.15 2.25 3.05 7.15 3.80 2.20 0.70 12TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL A 2.15 2.25 3.05 A 7.15 3.80 2.20 0.70 0.15 ii)SLUM T.D.R. : SRA/1427/ REHAB/ FINAL 78.97 SQ.MT. 21.30 21.30 BUILT UP AREA DIAGRAM 13TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL 12 PERMISSIBLE BUILT UP AREA [7+8+9+10+11] 1128.60 PROPOSED BUILT UP AREA 14TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL 2ND TO 6TH, 8TH TO 15TH FLOOR PLAN TERRACE FLOOR PLAN (GROUND FLOOR) SCALE 1:100 13 PROPOSED RESID. AREA = 1120.35 1128.60 15TH FLOOR 111.20 SQ.MT. 40.41 SQ.MT. NIL PROPOSED COMM. AREA = 8.25 SCALE - 1:100 SCALE- 1:100 14 TDR GENERATED IF ANY AS PER REGULATION 30 (A) AND 32 FOR UNUTILIZED BUA ON PLOT --------- BUILT UP AREA CALCULATION TOTAL 1522.74 SQ.MT. 610.33 SQ.MT. 0.25 SQ.MT 15 FUNGIBLE COMPENSATORY AREA AS PER REGULATION NO 31(3) TOTAL BUILT UP AREA = (1522.74 + 0.25 = 1522.99 SQ.MT.) (a) (i) PERM. FUNGIBLE COMPENSATORY AREA FOR REHAB COMP. W/O CHARGING PREMIUM (RES.) GROUND FLOOR RESID. REHAB. COMPONENT = NIL 21.30 TOTAL AREA OF STAIRCASE & LIFT LOBBY = 610.33 SQ.MT. COMM. REHAB. COMPONENT = NIL 21.30 3.20 1.20 3.20 2.30 1.20 10.20 A 4.55 X 2.45 X 1 NO = 11.14 SQ.MT. (ii) FUNGIBLE COMPENSATORY AREA AVAILED FOR REHAB COMP. W/O CHARGING PREMIUM (RES.) 9.90 A 1.20 2.15 8.05 A X TOTAL BUILT UP AREA = 11.14 SQ.MT. X RESID. REHAB. COMPONENT = NIL C 0.50 MT WIDE CHAJJA 0.50 MT WIDE CHAJJA 0.50 0.50 MT WIDE CHAJJA COMM. REHAB. COMPONENT = NIL 0.85 0.50 MT WIDE CHAJJA VOID VOID TIE BEAM 1.00 MT. PERMISSIBLE AREA 38.22 SQ.MT. (b) (i) PERMISSIBLE FUNGIBLE COMPENSATORY AREA BY CHARGING PREMIUM. B 1.20 MT. HIGH PROPOSED AREA 38.47 SQ.MT. TOILET PERMISSIBLE AREA 30.46 SQ.MT. RESID. COMPONENT = 392.12 B BELOW FLOOR LEVEL B B PARAPET WALL 0.25 SQ.MT. COUNTED IN F.S.I. B 395.01 TOILET B B W.B. PROPOSED AREA 30.46 SQ.MT. COMM. SALE. COMPONENT = 2.89 14 KITCHEN 2.30 X 2.75 (ii) FUNGIBLE COMPENSATORY AREA AVAILED ON PAYMENT OF PREMIUM 2.30 X 1.25 9.85 0.15 CORNICE @ BEAM BOTTOM 05 09 2.15 X 2.75 M- BED ROOM 14.60 0 RESID. COMPONENT = 391.50 2.15 X 1.20 R.C.C.WALL 15 REFUGE AREA 4.25 3.00 X 3.95 4.10 394.39 COMM. COMPONENT = 2.89 0.15 CORNICE @ BEAM BOTTOM 4 STACK PARKING 4 STACK PARKING 1.35X1.28 06 10 2.90 X 3.60 2.90 X 3.85 1.15 1.45 3.25 2.45 16 0.03 2.72 16 TOTAL BUA PROPOSED INCLUDING FCA [13 + 15(A)(II) + 15(B)+(II)] 1522.99 1.45 4 STACK PARKING 4.25 X 2.15 1.57 03 1.20 FITNESS CENTER 07 11 1.50X0.85 LIVING X 01 0.15 CORNICE @ BEAM BOTTOM 17 FSI CONSUMED ON NET PLOT [13/5] 2.20 3.05 X 4.33 R.C.C.WALL BUILT UP AREA CALCULATION DINING 3.05 X 5.85 02 3.35 LIFT -1 LIFT -2 LIFT -1 LIFT -2 (II) OTHER REQUIREMENTS 08 12 F.D. F.D. 2.20 1.35X0.90 RERA C.A. 2.30 W.C. 1.95 X 1.80 1.00 MT 1.80 X 1.80 SOCIETY OFFICE 1.50X1.20 1.95 X 1.80 1.00 MT 1.80 X 1.80 (1ST FLOOR) REQUIREMENT OF RECREATIONAL O.S. IN LAYOUT/PLOT AS PER REG. 27 --------- 0.85 1.35 3.90 1.35 3.40 X 1.40 1.90 WIDE 3.42 X 1.05 WIDE 60.37 SQ.MT. 1.75 1.00 X W.R. CHAJJA W.R. CHAJJA TOILET L1 L2 VOID A 14.60 X 8.40 X 1 NO = 122.64 SQ.MT. TENEMENT STATEMENT --------- 9.85 7.01 SQ.MT. F.R.D. 0.40 1.40 0.35 1.40 1.20 04 2.30 X 1.25 2.15 F.R.D. 1.17 X (i) PROPOSED BUA (13 (a) ABOVE) 1522.99 F.R.D F.R.D. 1.50 0.60 LOBBY 3.55 TOTAL ADDITION = 122.64 SQ.MT. A 8.40 02 8.32 LOBBY 1.15 A 5.25 VOID 0.85 (ii) LESS DEDUCTION OF NON - RESIDENTIAL AREA (SHOP ETC.) 11.14 VOID S.S. 5.75 X 1.50 7.45 X 1.50 0.70 2.25 0.70 1.30 2.00 DEDUCTIONS (iii) AREA AVAILABLE FOR TENEMENTS [(i) minus (ii)] 1511.85 8.40 0.85 0.50 MT WIDE CHAJJA F.R.D E.C. F.R.D E.C. 0.90X0.45 09 A LL1 0.50 MT WIDE CHAJJA 0.15 CORNICE @ BEAM BOTTOM 4 STACK PARKING (iv) TENEMENTS PERMISSIBLE (DENSITY OF TENEMENTS/HECTARE) 68.00 Nos. 0.50 MT WIDE CHAJJA 1:5 SLOPPING 1.05 0 4.10 X 0.03 X 1 NO = 0.12 SQ.MT. FIRE MAN FIRE MAN TERRACE (v) TOTAL NO. OF TENEMENTS PROPOSED ON THE PLOT 27.00 Nos. EVACUATION EVACUATION 5.30 UP UP ST5 01 1.15 X 1.57 X 1 NO = 1.81 SQ.MT. 0.65 3.25 3.30 5.95 LIFT 17 18 19 20 B LIFT BED ROOM PARKING STATEMENT 08 3.75 1.50 X 1.40 1.50 X 1.40 1.50 2.00 1.50 1.50 2.00 1.50 3.65 X 3.00 2.55 ST1 4.95 ST6 02 1.45 X 3.35 X 1 NO = 4.85 SQ.MT. (i) PARKING REQUIRED BY REGULATION FOR: 07 03 3.25 X 1.45 X 1 NO = 4.72 SQ.MT. 3.75 CAR 3.30 FIRE CUTOFF FIRE CUTOFF 1.95 1.50 F.R.D 1.50 F.R.D SCOOTER/MOTOR CYCLE 21.00 Nos. DN DN LOBBY LOBBY ST2 1.60 X 1.50 1.60 X 1.50 5.40 04 1.05 X 3.55 X 1 NO = 3.73 SQ.MT. OUTSIDERS (VISITORS ) 0.15 0.40 C 0.45 0.15 CORNICE @ BEAM BOTTOM ST3 0. 05 1.75 X 0.12 X 1 NO = 0.21 SQ.MT. (ii) COVERED GARAGE PERMISSIBLE --------- 1.20 1.20 85 0.25 MT WIDE CHAJJA 0.25 MT WIDE CHAJJA 1. 70 0.47 ST4 0.15 CORNICE @ BEAM BOTTOM 0.15 CORNICE @ BEAM BOTTOM 05 1.75 06 1.20 X 0.50 X 0.50 = 0.30 SQ.MT. (iii) COVERED GARAGE PROPOSED --------- 4.20 2.15 2.25 3.05 7.15 3.85 2.15 0.70 2.15 2.25 3.05 7.15 3.80 2.20 0.70 06 0.10 0.12 A A 07 5.30 X 3.75 X 1 NO = 19.87 SQ.MT. CAR 21.30 SCOOTER/MOTOR CYCLE --------- 21.30 08 2.15 X 5.95 X 1 NO = 12.79 SQ.MT. OUTSIDERS (VISITORS ) 1ST FLOOR BUILT UP AREA DIAGRAM 09 2.25 X 0.85 X 1 NO = 1.91 SQ.MT. 1ST FLOOR PLAN 7TH REFUGE FLOOR PLAN TOTAL DEDUCTION = 50.31 SQ.MT. B (iv) TOTAL PARKING PROVIDED 21.00 Nos. SCALE 1:100 TRANSPORT VEHICLES PARKING SCALE- 1:100 SCALE - 1:100 (i) SPACES FOR TRANSPORT VEHICLES PARKING REQUIRED BY REGULATION --------- (ii) TOTAL NO. OF TRANSPORT VEHICLES PARKING SPACES PROVIDED --------- 21.30 STAIRCASE & LIFT AREA CALCULATION 0.35 01 1.20 (1ST FLOOR) 4.25 NORTH L1 2.30 X 1.75 X 1 NO = 4.02 SQ.MT. 3.05 11 L2 2.20 X 1.90 X 1 NO = 4.18 SQ.MT. CONTENTS OF THE SHEET 13.40 M. WIDE EXISTING R O A D LL1 5.25 X 1.30 X 1 NO = 6.82 SQ.MT. GROUND TO 15TH FLOOR PLAN, LOCATION PLAN, BLOCK PLAN, PLOT AREA DIAGRAM ST1 5.40 X 2.55 X 1 NO = 13.77 SQ.MT. & CALCULATION, BUILT UP AREA SUMMERY, CAR PARING STATEMENT, COMPOUND 4.50 MT. WIDE GATE 6.00 MT. WIDE GATE 2.30 2.05 ST2 1.70 X 0.85 X 0.50 = 0.72 SQ.MT. WALL DETAILS & SECTION, GROUND TO 2ND TO 6TH, 8TH TO 15TH FLOOR BUILT UP REMOVABLE BOLLARD ENTRY / EXIT AREA DIAGRAM & CALCULATION 1.75 CHAIN LINK GATE W.CABIN 12 C.T.S. NO. 541 D 1.75 X 1.55 ST3 1.70 X 0.47 X 0.50 = 0.40 SQ.MT. 3.08 3.07 3.03 3.05 3.05 0.70 CERTIFICATE OF AREA 3.04 L1 1.45 3.33 L2 3.42 ST4 4.20 X 1.20 X 1 NO = 5.04 SQ.MT. 3.57 9.85 A 1.40 10 4.52 4.53 4.54 4.61 4.63 4.67 5.57 BUILDING LINE ABOVE 0.30 MT WIDE CHAJJA ST5 0.70 X 4.95 X 1 NO = 3.46 SQ.MT. CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE ON 27-06-2021 AND THAT THE BUILDING LINE ABOVE 1.30 3.15 DIMENSIONS OF THE SIDES ETC. OF THE PLOT STATED ON THE PLAN ARE AS MEASURED ON THE SITE 21.30 C.T.S. NO. 540 C LL1 ST6 1.05 X 3.30 X 1 NO = 3.46 SQ.MT. 6.05 4.70 C 5.20 1.20 2.45 7.75 0.35 09 AND THAT THE AREA SO WORKED OUT IS 513.00 SQ.MTS. ( FIVE HUNDRED AND THIRTEEN POINT ZERO 8.17 0.50 5.95 LL2 TOTAL STAIRCASE & LIFT AREA = 41.87 SQ.MT. C SQ.MT. )WHICH TALLIES WITH THE AREA STATEDIN THE DOCUMENTS OF A B OWNERSHIP AND T.P.RECORDS. DIVYESH Date: 5.95 2026.02.25 M.S. STEPS S 7.00 TOTAL DEDUCTION (B + C) = 92.18 SQ.MT. D HARESH 14:50:18 B B 02 03 PAREKH +05'30' 13 5.54 4.60 2.05 GROSS BUILT UP AREA [A - D] = 30.46 SQ.MT. E 3.30 01 ST1 + 0.30 MT. LEVEL. B R.S. 01 + 0.30 MT. LEVEL. 05 09 14 B 3.75 04 08 SIGNATURE OF ARCHITECT / L.S. 02 ELE. METER ELE. METER ST ST2 CULTURAL ACTIVITIES 4 STACK PARKING SPACE SPACE 1.60 DESCRIPTION OF PROPOSAL & PROPERTY 4 STACK PARKING 06 10 15 ST6 THE SLAB OF THE U.G. TANK SHALL 2.90 2.45 4.25 X 2.30 EA ST3 4.20 U.G. TANK FOR FIRE FIGHTING, 4 STACK PARKING 03 2.73 2 PIT 2 STACK 0. 0.15 1.20 1.20 RERA C.A. 0.47 85 ST5 PROPOSED DEVELOPMENT ON PLOT BEARING C.T.S. NO. 540C, 541D AND 544 OF FITNESS CENTER AREA STATEMENT 1. 07 11 16 2.15 2.25 70 ST4 9.77 SQ.MT. 04 3.05 05 1.20 0.40 07 0.55 VILLAGE EKSAR AT HOLY CROSS ROAD, I.C. COLONY, BORIVALI (W), MUMBAI 0.15 06 DOMESTIC PURPOSE & FLUSHING LIFT - 1 LIFT - 2 08 12 TOTAL PROPOSED AREA = 1522.99 SQ.MT. IN R/N WARD. F.D. 6.52 0.50 1. 1.35 Y PLOT BOUNDARY AS PER C.T.S. PLAN R.C.C. WALL 1.95 X 1.80 1.00 MT 1.80 X 1.80 WA 1.60 6.70 54 S. TOI. WIDE W.R.CHJJA IVE = 1522.99 x 2% = 30.46 SQ.MT. NAME OF OWNER PURPOSE 0.35 1.40 2.02 X 1.20 BE DESIGNED TO BEAR VEHICULAR LOAD DR FITNESS CENTER AREA PERMISSIBLE = 30.46 SQ.MT. SHRI. TARUN R. DAVE + 1.10 MT. LEVEL. + 1.10 MT. LEVEL. WA BUILT UP AREA DIAGRAM FITNESS CENTER AREA PROPOSED = 30.46 SQ.MT. TARUN 8.40 LOBBY Date: 2026.02.25 8.22 79 6.56 GROUND FLOOR, HARDIK, 120 LINK ROAD RASIKBHAI ENTRANCE LOBBY 5.90 X 1.50 Y DAVE 14:52:08 +05'30' 1. (2ND TO 6TH, 8TH TO 15TH FLOOR) SCALE 1:100 KANDARPADA, DAHISAR (W), MUMBAI - 400 068 80 2.90 X 1.70 E.C. TW O 2.65 1. 4 STACK PARKING 6.07 NAME OF R.C.C. CONSULTANT OF 48 MT. & POINT LOAD OF 10KG/CM2 FIRE MAN EVACUATION UP 19 20 B 3.30 LIFT 17 18 W 50 1.50 2.00 1.50 1.50 X 1.40 6.22 BUILT UP AREA CALCULATION M/S. UNISTEPS CONSULTING PVT.LTD. (STR/C/40) ES 1. ROW HOUSE -04, DHEERAJSAVERA OPP. T 50 FIRE CUTOFF (2ND TO 6TH, 8TH TO 15TH FLOOR) SIDDHARTH NAGAR, BORIVALI (E), MUMBAI- 400 066 1.95 CHAJJA 1. 1.50 1.55 LOBBY 1.60 X 1.50 STAIRCASE & LIFT AREA CALCULATION DGN. BY PR@N@Y JOB No. E ID W + 0.15 MT. LEVEL. 9.41 A 21.30 X 9.85 X 1 NO = 209.80 SQ.MT. N C M T 0. 0.45 S TOTAL ADDITION = 209.80 SQ.MT. A (2ND TO 6TH, 8TH TO 15TH FLOOR) DRAWN PR@N@Y OFFICE FILE NO. 29 2.57 15 0.25 MT WIDE CHAJJA E 2.12 PL 2.15 2.25 0.84 2.21 81 7.15 3.85 2.15 0.70 CHECKED BY DIVYESH SHEET NO. 01/02 1.73 1.77 PH OT L1 2.30 X 3.05 X 1 NO = 7.02 SQ.MT. W 1.72 1. 21.30 21 YS BO A DEDUCTIONS S DATE 25-02-2026 SCALE 1:100 IC U L2 2.05 X 3.05 X 1 NO = 6.26 SQ.MT. AL ND 01 4.25 X 0.35 X 1 NO = 1.49 SQ.MT. PO AR LL1 1.30 X 1.45 X 1 NO = 1.89 SQ.MT. C.T.S. NO. 544 SS Y A 02 2.15 X 5.95 X 1 NO = 12.79 SQ.MT. LL2 5.95 X 0.50 X 1 NO = 2.98 SQ.MT. DHAVA Digitally signed by DHAVAL SHIRISH JADHAV DN: c=IN, postalCode=400615, JAGANN Digitally signed SANTOSH Digitally by SANTOSH signed ES S 03 2.25 X 4.60 X 1 NO = 10.36 SQ.MT. st=MAHARASHTRA, street=303 by JAGANNATH HARISHC HARISHCHAND CEDAR, MAHAVIR KALPAVRIKSHA, SI PE L KASARVADAWLI ,OFF GHODBUNDER ON R 04 3.05 X 3.75 X 1 NO = 11.45 SQ.MT. ST1 7.00 X 2.05 X 1 NO = 14.35 SQ.MT. ROAD, ,THANE,KASARVADAWLI ,40061 5, l=THANE, o=Personal, ATH SHRIRAM RA SANKHE SOUTH serialNumber=89ccba5c4c647226a7b GAVHANE HANDRA Date: b229ddad54699508e1576bfa3ae9656 ON PLOT BOUNDARY ST2 0.85 X 1.70 X 0.50 = 0.73 SQ.MT. SHIRISH 2ae7db46416a86, pseudonym=cb9cc3f8726142ea845fdf c6dad437d0, SHRIRAM Date: 05 0.50 X 1.20 X 0.50 = 0.30 SQ.MT. SANKHE 2026.03.16 2.5.4.20=153a9664fb50528a96e58272 SI TE AS PER C.T.S. PLAN ST3 0.47 X 1.70 X 0.50 = 0.40 SQ.MT. JADHAV 7f876efbc213a6cccee95e1618efcc87b f9ce24b, email=DHAVAL.MCGM@GMAIL.COM, GAVHAN 2026.03.12 14:18:55 +05'30' 06 1.60 X 0.15 X 1 NO = 0.24 SQ.MT. cn=DHAVAL SHIRISH JADHAV 21:54:29 SP ST4 4.20 X 1.20 X 1 NO = 5.04 SQ.MT. Date: 2026.03.06 19:06:36 +05'30' E +05'30' AC 07 6.70 X 0.55 X 1 NO = 3.69 SQ.MT. EF N OR ST5 1.60 X 1.05 X 1 NO = 1.68 SQ.MT. S.E.B.P. (R7) A.E.B.P. (RII) E.E.B.P.(RII) PU 08 2.90 X 3.30 X 1 NO = 9.58 SQ.MT. GROUND FLOOR PLAN M P 09 3.15 X 0.35 X 1 NO = 1.11 SQ.MT. ST6 0.15 X 0.40 X 1 NO = 0.06 SQ.MT. E SIGNATURE NAME & ADDRESS OF ARCHITECT/L.S. SCALE - 1:100 W 10 0.70 X 1.40 X 1 NO = 0.98 SQ.MT. TOTAL STAIRCASE & LIFT AREA = 40.41 SQ.MT. C S 11 1.20 X 3.05 X 1 NO = 3.66 SQ.MT. TOTAL DEDUCTION (B + C) = 98.60 SQ.MT. D 12 1.45 X 1.75 X 1 NO = 2.54 SQ.MT. GROSS BUILT UP AREA [A - D] = 111.20 SQ.MT. E DIVYESH Date: DIVYESH PAREKH HARESH 2026.02.25 14:50:31 TOTAL DEDUCTION = 58.19 SQ.MT. B PAREKH +05'30' P/444/LS LICENSED SURVEYOR 1105, Solitaire Business Center, Gulmohar Road, Borivali (W), Mumbai - 92. divsparekh@gmail.com RERA CARPET AREA CALCULATION 1:5 SLOPPING TERRACE 1ST FLOOR 4.25 P-7666 /2021/(541D AND OTHER)/R/N WARD /EKSAR (S) R/N FITNESS CENTER + 4.65 MT. GROUND FLOOR (CULTURAL ACTIVITIES) 02/02 01 2.30 01 4.25 X 2.30 X 1 NO = 9.77 SQ.MT. (O.C.C. PLAN) TOTAL RERA CARPET AREA = 9.77 SQ.MT. 1.20 MT HIGH 4.50 MT. HEIGHT PARAPET MS RAILING THIS DRAWING ACCEPTED AS FULL COMPLETION PLANS AS ACCOMPANIMENT 3.55 3.00 GROUND FLOOR RERA CARPET AREA DIAGRAM OF ACCEPTANCE OF B.C.C. BY THIS OFFICE LETTER ISSUED WALL 60% OPENABLE 4.65 4.65 4.05 (CULTURAL ACTIVITIES) (SCALE - 1:100) UNDER NO. P-7666 /2021/(541D AND OTHER)/R/N WARD /EKSAR (S) R/N GROUND FLOOR LIFT 1.70 1.70 2.15 OVER HEAD + 1.10 MT. ENTRANCE LOBBY MACHINE 4.50 MT. HEIGHT PARAPET SIGNED ON EVEN DATE. WATER TANK ROOM 9.15 WALL 60% OPENABLE 1.90 GROUND FLOOR THIS PLAN IS DIGITALLY SIGNED AND ISSUED. 1.10 4.50 + 0.15 MT. 4.50 1.50 1.50 THIS DRAWING SHALL BE READ IN CONJUNCTION WITH BUILDING COMPLETION GROUND LVL. GROUND LVL. CERTIFICATE UNDER THE PROVISION OF REG.11 ( 6 ) AND FULL OCCUPATION ± 0.00 MT. LEVEL. ± 0.00 MT. LEVEL. 2.40 2.40 1.90 1.50 MT. HEIGHT 1.50 MT. HEIGHT 1.50 CERTIFICATE UNDER THE PROVISION OF REG.11 ( 7 ) OF DCPR 2034 ISSUED 1.30 1.30 TERRACE FLOOR TERRACE FLOOR PARAPET WALL PARAPET WALL LOBBY + 50.30 MT. + 50.30 MT. TERRACE GARDEN UNDER NO. P-7666 /2021/(541D AND OTHER)/R/N WARD /EKSAR (S) R/N /OCC/1/NEW TERRACE GARDEN TERRACE GARDEN 4.20 4.50 SIGNED ON EVEN DATE 1.90 3.00 3.00 0.75 02 0.35 07 2.15 0.35 15TH FLOOR 15TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM 4.95 KITCHEN LOBBY + 47.30 MT. + 47.30 MT. 2.90 SECTION THROUGH CANOPY "C-C" 0.60 06 2.40 3.60 01 SCALE 1:100 3.00 3.00 4.45 2.30 4.60 03 04 LIFT SHAFT 21.30 2.15 3.20 1.22 3.18 13.70 14TH FLOOR 14TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM 0.35 01 0.35 13 KITCHEN 02 0.70 R4 LOBBY + 44.30 MT. + 44.30 MT. 2.15 1.05 1.20 2.75 2.25 R3 05 R2 R6 3.05 14 3.05 1.00 3.90 R1 3.75 3.00 3.00 3.05 3.40 4.60 R5 2.30 KITCHEN 13TH FLOOR 13TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM LOBBY + 41.30 MT. + 41.30 MT. 2ND TO 7TH, 9TH TO 15TH FLOOR CARPET AREA DIAGRAM 2.05 0.60 0.60 2.30 2.25 1.75 15 (FLAT NO. 01 ) (SCALE - 1:100) 1.55 1.50 3.05 L1 1.45 3.05 0.70 1.20 MT HIGH 10.20 3.00 3.00 SC1 1.65 A L2 MS RAILING SC2 2.35 1.45 1.40 12 1.30 RERA CARPET AREA CALCULATION 1.15 LL2 LL1 12TH FLOOR 12TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM 0.35 11 KITCHEN LOBBY + 38.30 MT. + 38.30 MT. 2ND TO 7TH, 9TH TO 15TH FLOOR (FLAT NO. 01) 7.60 3.15 0.30 0.50 LL3 01 2.15 X 3.60 X 1 NO = 7.74 SQ.MT. 5.95 1.65 7.00 03 27.00 02 0.75 X 0.35 X 1 NO = 0.26 SQ.MT. 27.00 4.60 ST1 2.05 3.30 04 3.75 10 3.00 3.00 03 2.25 X 4.60 X 1 NO = 10.35 SQ.MT. 05 3.25 06 ST2 04 2.90 X 4.45 X 1 NO = 12.90 SQ.MT. 1.60 ST6 KITCHEN 11TH FLOOR 11TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM ST3 4.20 0.15 2.90 LOBBY + 35.30 MT. + 35.30 MT. 05 3.05 X 1.00 X 1 NO = 3.05 SQ.MT. 1.05 85 LIFT SHAFT 1.20 0.47 1. 70 0. ST5 ST4 0.55 2.15 2.25 1.40 07 0.40 06 2.30 X 2.40 X 1 NO = 5.52 SQ.MT. 0. 50 1.20 0.15 6.70 09 08 1.75 07 2.15 X 0.35 X 1 NO = 0.75 SQ.MT. 3.00 3.00 TOTAL RERA CARPET AREA = 40.57 SQ.MT. BUILT UP AREA DIAGRAM (7TH FLOOR) SCALE 1:100 KITCHEN 10TH FLOOR 10TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM LOBBY + 32.30 MT. + 32.30 MT. BUILT UP AREA CALCULATION 0.60 9.90 (7TH REFUGE FLOOR) 2.75 01 3.00 3.00 1.20 MT HIGH A 21.30 X 10.20 X 1 NO = 217.26 SQ.MT. MS RAILING TOTAL ADDITION = 217.26 SQ.MT. A 9TH FLOOR 9TH FLOOR 0.70 KITCHEN M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM LOBBY +29.30 MT. +29.30 MT. 0.30 1.05 3.40 DEDUCTIONS 1.20 07 01 3.20 X 0.35 X 1 NO = 1.12 SQ.MT. 2.10 3.00 56.05 06 02 2.60 02 1.22 X 0.70 X 1 NO = 0.85 SQ.MT. 04 3.25 03 2.15 X 5.95 X 1 NO = 12.79 SQ.MT. 3.00 2.45 8TH FLOOR 1.45 04 2.25 X 4.60 X 1 NO = 10.35 SQ.MT. 8TH FLOOR KITCHEN M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM 03 LOBBY + 26.30 MT. + 26.30 MT. 05 1.40 X 3.75 X 1 NO = 5.25 SQ.MT. 1.20 06 1.65 X 3.25 X 1 NO = 5.37 SQ.MT. 50.30 50.30 3.00 LIFT SHAFT 07 1.20 X 0.50 X 0.50 = 0.30 SQ.MT. 3.00 05 3.00 08 1.75 X 0.15 X 1 NO = 0.27 SQ.MT. 09 6.70 X 0.55 X 1 NO = 3.69 SQ.MT. 1.20 MT. HIGH 7TH FLOOR 7TH FLOOR 1.20 MT. HIGH 1.20 1.20 PARAPET WALL (REFUGE FLOOR) (REFUGE FLOOR) PARAPET WALL TOI. REFUGE AREA KITCHEN LIVING TOI. M- BED ROOM 3.65 10 2.90 X 3.30 X 1 NO = 9.57 SQ.MT. LOBBY + 23.30 MT. + 23.30 MT. REFUGE AREA 11 3.15 X 0.35 X 1 NO = 1.11 SQ.MT. 0.60 12 0.70 X 1.40 X 1 NO = 0.98 SQ.MT. 2ND TO 15TH FLOOR RERA CARPET AREA DIAGRAM 13 13.70 X 0.35 X 1 NO = 4.80 SQ.MT. (FLAT NO. 02) (SCALE- 1:100) 14 1.20 X 3.05 X 1 NO = 3.66 SQ.MT. 0.50 3.00 3.00 TOI. 15 1.45 X 1.75 X 1 NO = 2.54 SQ.MT. 6TH FLOOR 6TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM TOTAL DEDUCTION = 62.65 SQ.MT. B LOBBY KITCHEN + 20.30 MT. + 20.30 MT. RERA CARPET AREA CALCULATION 5TH FLR. 0.60 2ND TO 15TH FLOOR (FLAT NO. 02) STAIRCASE & LIFT AREA CALCULATION 1 9.90 X 2.75 X 1 NO = 27.22 SQ.MT. 3.00 3.00 2 1.05 X 2.10 X 1 NO = 2.20 SQ.MT. (7TH REFUGE FLOOR) 3.00 TOI. 3 1.20 X 1.45 X 1 NO = 1.74 SQ.MT. L1 2.30 X 3.05 X 1 NO = 7.02 SQ.MT. 5TH FLOOR 5TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM KITCHEN 4 3.40 X 3.25 X 1 NO = 11.05 SQ.MT. LOBBY + 17.30 MT. + 17.30 MT. L2 2.05 X 3.05 X 1 NO = 6.26 SQ.MT. 4TH FLR. 5 3.65 X 3.00 X 1 NO = 10.95 SQ.MT. 0.60 LL1 1.30 X 1.45 X 1 NO = 1.89 SQ.MT. 6 2.45 X 2.60 X 1 NO = 6.37 SQ.MT. VOID LL2 1.65 X 1.15 X 1 NO = 1.90 SQ.MT. 1.20 MT HIGH 3.00 3.00 MS RAILING 7 0.70 X 1.20 X 1 NO = 0.84 SQ.MT. LL3 7.60 X 0.50 X 1 NO = 3.80 SQ.MT. 3.00 LIFT SHAFT TOTAL RERA CARPET AREA = 60.37 SQ.MT. ST1 7.00 X 2.05 X 1 NO = 14.35 SQ.MT. TOI. 4TH FLOOR 4TH FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM KITCHEN LOBBY + 14.30 MT. + 14.30 MT. ST2 0.85 X 1.70 X 0.50 = 0.73 SQ.MT. 0.30 3RD FLR. ST3 0.47 X 1.70 X 0.50 = 0.40 SQ.MT. 0.60 ST4 4.20 X 1.20 X 1 NO = 5.04 SQ.MT. CONTENTS OF THE SHEET ST5 1.60 X 1.05 X 1 NO = 1.68 SQ.MT. 0.50 3.00 3.00 3.00 TOI. 7TH BUILT UP AREA DIAGRAM & CALCULATION, 1ST TO 15TH FLOOR CARPET AREA 23.30 ST6 0.15 X 0.40 X 1 NO = 0.06 SQ.MT. 23.30 3RD FLOOR 3RD FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM DIAGRAM & CALCULATION & SECTIONS KITCHEN TOTAL STAIRCASE & LIFT AREA = 43.13 SQ.MT. C LOBBY + 11.30 MT. + 11.30 MT. 2ND FLR. DESCRIPTION OF PROPOSAL & PROPERTY SOCIETY OFFICE AREA CALCULATION PROPOSED DEVELOPMENT ON PLOT BEARING C.T.S. NO. 540C, 541D AND 544 OF VILLAGE EKSAR AT HOLY CROSS ROAD, I.C. COLONY, BORIVALI (W), MUMBAI 7TH FLOOR (REFUGE AREA) 3.00 3.00 IN R/N WARD. SC1 2.25 X 1.50 X 1 NO = 3.37 SQ.MT. SECTION - X-X KITCHEN 2ND FLOOR 2ND FLOOR M- BED ROOM TOI. LIVING KITCHEN KITCHEN LIVING TOI. M- BED ROOM NAME OF OWNER SC2 1.55 X 2.35 X 1 NO = 3.64 SQ.MT. LOBBY + 8.30 MT. + 8.30 MT. TOTAL SOCIETY OFFICE AREA 7.01 SQ.MT. SHRI. TARUN R. DAVE = D TOILET DUCT TARUN Date: 1.00 2026.02.25 GROUND FLOOR, HARDIK, 120 LINK ROAD RASIKBHA 14:51:42 I DAVE +05'30' SCALE 1:100 KANDARPADA, DAHISAR (W), MUMBAI - 400 068 REFUGE AREA CALCULATION 2.60 3.65 TIE BEAM AT 3.65 3.65 3.50 NAME OF R.C.C. CONSULTANT 3.65 7TH FLOOR (REFUGE AREA) R1 2.15 X 3.90 X 1 NO = 8.38 SQ.MT. M/S. UNISTEPS CONSULTING PVT.LTD. (STR/C/40) MIDLANDING LEVEL CROSS BEAM AT LIFT SHAFT R2 1.05 X 3.75 X 1 NO = 3.93 SQ.MT. 1ST FLOOR 1ST FLOOR 1:5 SLOPING ROW HOUSE -04, DHEERAJSAVERA OPP. LOBBY + 4.65 MT. + 4.65 MT. FITNESS CENTER TERRACE SIDDHARTH NAGAR, BORIVALI (E), MUMBAI- 400 066 R3 2.75 X 3.40 X 1 NO = 9.35 SQ.MT. 1.80 1.00 8.00 8.30 PR@N@Y MIDLANDING LEVEL DGN. BY JOB No. R4 3.18 X 0.70 X 1 NO = 2.23 SQ.MT. 1.00 N DRAWN PR@N@Y OFFICE FILE NO. 29 R5 1.65 X 4.60 X 1 NO = 7.59 SQ.MT. E 3.00 CHECKED BY DIVYESH SHEET NO. 02/02 W 3.55 TIE BEAM AT R6 2.30 X 3.04 X 1 NO = 6.99 SQ.MT. 1.80 4.35 DATE 25-02-2026 SCALE 1:100 4.35 S TOTAL REFUGE AREA = 38.47 SQ.MT. E ELE. METER SPACE 4.65 4.20 TIE BEAM AT = F MIDLANDING LEVEL TOTAL DEDUCTION (B + C + D +E) 151.26 SQ.MT. LIFT LOBBY + 1.10 MT. LOBBY ELE. ELE. DHAVA SANTOSH Digitally by SANTOSH signed GROSS BUILT UP AREA [A - F] = 66.00 SQ.MT. G GROUND FLOOR 1.80 JAGANN Digitally signed MIDLANDING LEVEL METER METER HARISHC HARISHCHAND Digitally signed by DHAVAL SHIRISH JADHAV GROUND FLOOR CULTURAL ACTIVITIES DN: c=IN, postalCode=400615, by JAGANNATH 0.80 GROUND FLOOR L + 0.30 MT. st=MAHARASHTRA, street=303 CEDAR, MAHAVIR 1.10 1.90 ATH KALPAVRIKSHA, KASARVADAWLI ,OFF + 0.30 MT. SPACE SPACE GHODBUNDER ROAD, ,THANE,KASARVADAWLI ,400615, SHRIRAM RA SANKHE HANDRA Date: + 0.15 MT. l=THANE, o=Personal, SHRIRAM GAVHANE serialNumber=89ccba5c4c647226a7bb229ddad5 SHIRISH 4699508e1576bfa3ae96562ae7db46416a86, 0.30 0.30 pseudonym=cb9cc3f8726142ea845fdfc6dad437d Date: 2.35 0, SANKHE 2026.03.16 2.5.4.20=153a9664fb50528a96e582727f876efbc2 GAVHAN 2026.03.12 13a6cccee95e1618efcc87bf9ce24b, email=DHAVAL.MCGM@GMAIL.COM, REFUGE AREA STATEMENT 7TH FLOOR GROUND LVL. GROUND LVL. GROUND LVL. JADHAV cn=DHAVAL SHIRISH JADHAV 14:19:07 +05'30' 1.40 LIFT PIT Date: 2026.03.06 19:09:52 +05'30' 21:54:08 ± 0.00 MT. LEVEL. ± 0.00 MT. LEVEL. ± 0.00 MT. LEVEL. E +05'30' REFUGE AREA REQUIRED :- 7TH TO 15TH FLOOR AREA 1.90 2.05 SECTION = "B-B" S.E.B.P. (R7) A.E.B.P. (RII) E.E.B.P.(RII) (66.00 + 889.60) X 4% = 38.22 SQ.MT. SECTION = "A-A" 4.20 4.50 SCALE 1:100 REFUGE AREA REQUIRED ON 7TH FLOOR = 38.22 SQ.MT. SCALE 1:100 SIGNATURE NAME & ADDRESS OF ARCHITECT/L.S. 1.90 REFUGE AREA PROPOSED ON 7TH FLOOR = 38.47 SQ.MT. EXCESS AREA 38.47 - 38.22 = 0.25 SQ.MT. DIVYESH PAREKH DIVYESH Date: 2026.02.25 0.25 SQ.MT. COUNTED IN F.S.I. HARESH 14:50:42 P/444/LS LICENSED SURVEYOR PAREKH +05'30' 3.50 1105, Solitaire Business Center, Gulmohar Road, Borivali (W), Mumbai - 92. divsparekh@gmail.com