Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:17-01-2026 To, OM CONSTRUCTION MUMBAI SUBURBAN, MAHARASHTRA, 400068 Subject : Certificate of percentage of Work of completion of construction work of MARUTI RESIDENCY having MahaRERA Registration Number P51800052504 (Only Applicable after project Registartion) being developed by OM CONSTRUCTION Sir, I/We DIVYESH PAREKH have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of MARUTI RESIDENCY having MahaRERA Registration Number P51800052504 (Only Applicable after project Registration, being developed by OM CONSTRUCTION ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: MARUTI RESIDENCY/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises 8 Sanitary Fitting within the Flat/Premises 90.00 Page 1 of 3 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 9 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 100.00 waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 95.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 2 of 3 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 50.00 TO BE PROVIDED 3 Sewerage (Chamber, Lines, Septic Tank , STP) No 0.00 NA 4 Storm Water Drains Yes 100.00 TO BE PROVIDED 5 Landscaping & Tree Planting No 0.00 NA 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage Water No 0.00 NA 9 Solid Waste Management And Disposal Yes 50.00 TO BE PROVIDED 10 Water conservation /Rain water harvesting Yes 100.00 TO BE PROVIDED 11 Energy managemcnt No 0.00 NA 12 Fire protection and fire safety requirements Yes 95.00 TO BE PROVIDED 13 Electrical meter room, sub-station, receiving station No 0.00 NA 14 Aggregate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Yours Faithfully DIVYESH PAREKH Signature & Name (IN BLOCK LETTERS) of L.S/ Architect ( License No: P/444/LS) Date of Certificate: Agreed and accepted by: Signature of Promoter Name: OM CONSTRUCTION Date:17-01-2026 Page 3 of 3