Annexure A FORM 1 (See Regulation -3) ARCHITECT'S CERTIFICATE Date: 16.10.2025 To, Ambit Builders & Developers Office No 102 & 103, First Floor, Grande Edifice, Opp Godrej Reserve, Akurli Road, Kandivali (East), Mumbai 400 101. Subject: Certificate of Percentage of Completion of Construction Work “Ambit Vista” on slum plot bearing CTS. No. 2046, 2048, of Village Vileparle (E), & CTS No. 5, of Village Bandra I Ward, and F.P. No. 138 & 139, Santacruz TPS-V, Tal.-Andheri, Mumbai with S.R. Scheme under Regulation 33(11) of DCPR-2034 on non-slum plot bearing CTS. No. 2049 of Village- Vile Parle (E), Tal- Andheri F.P. No. 137, Santacruz TPS-V, Santacruz (East), Mumbai- 400055. For "Santacruz Mangalmurti & Sai Baba CHS. Ltd." having MahaRERA Registration Number: P51800052265 being developed by M/s. Ambit Builders & Developers Sir I Arun Gurav have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction Work of “Ambit Vista” having MahaRERA Registration Number: P51800052265 being developed by M/s. Ambit Builders & Developers. Following Technical Professionals appointed by the Owner/Promoters: - 1. Architects : M/s Skyline Inframart Consultants LLP. 2. Structural Consultant : Samishthi Techno Services 3. MEP Consultant : Samishthi Techno Services 4. Site Supervisor : Mr. Sachin Swaminath Ayyangar. Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on 01st July 2025 to 30st September 2025 (Second Quarter of F.Y. 2025-26), the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table “A” herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table “B”. TABLE – “A” Sr Percentage of Work Done No Task/Activities A Wing B Wing C Wing D Wing 1 Excavation. 100% 100% 100% 100% 2 Basements (if any): (Minus 3 level Parking 100% 100% 100% 100% th 6 Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com Basement) 3 Podiums (if any): NA Number NA NA NA NA 4 Plinth 100% 100% 100% 100% 5 Stilt Floor: NA Number 0% 0% 0% 0% 6 Slabs of Super Structure: 7 Floors 43% 100% 100% 100% 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within 0% 15% 75% 75% Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 0% 0% 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground 15% 60% 90% 90% Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0% 0% 10% 10% waterproofing of the Building/ Wing. 11 Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO Noc, Electrical fittings, Mechanical equipment, compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s. plinth protection, 0% 0% 0% 0% paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. any other activities. TABLE “B” Common Areas (Internal and External Development works) in respect of the Registered Phase / Project Number Percentage of Details Sr. Common areas and facilities Proposed Actual Work Done No (Yes/ No) (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths. No 0% NA As per MCGM 2 Water Supply. YES 0% approvals As per MCGM 3 Storm Water Drains. YES 0% norms 4 Landscaping & Tree Planting. YES 0% As per Tree NOC 5 Solid Waste management & YES 0% Proposed th 6 Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com Disposal. Water conservation /Rain Water 6 YES 0% Proposed harvesting. 7 Energy Management YES 0% Proposed Fire protection and fire safety 8 YES 0% Proposed requirement. Electrical meter room, sub-station, 9 YES 0% Proposed receiving station. 10 Lounge & Refreshment Bar YES 0% Proposed 11 Observation Deck YES 0% Proposed 12 Outdoor sitting YES 0% Proposed 13 Party Lawn YES 0% Proposed 14 Pool side Deck YES 0% Proposed 15 Sky Deck YES 0% Proposed 16 Sky Lounge YES 0% Proposed 17 Spiritual Zone YES 0% Proposed 18 Yoga Deck YES 0% Proposed 19 Yoga Room / Hobby Room: YES 0% Proposed Aggregate area of recreational 20 NO 0% NA Open Space Proposed - BMC 21 Water Supply YES 0% Water connection. 22 Storm Water Drains YES 0% Proposed - SWD. Proposed - OWC Solid Waste Management and 23 YES 0% and disposal Disposal through Vendor. Yours Faithfully For M/S SKYLINE INFRAMART CONSULTANTS LLP. Digitally signed by ARUN ARUN VISHRAM GURAV DN: cn=ARUN VISHRAM GURAV c=IN l=MUMBAI o=Personal VISHRAM e=ARUNGURAV786@GMAIL.COM Reason: I am the author of this document GURAV Location: Date: 2025-10-17 14:30+05:30 Arun Gurav L/S No: 840002661 Agreed and accepted by: M/S AMBIT BUILDERS & DEVELOPERS Authorized Signatory th 6 Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com