Annexure A FORM 1 (See Regulation -3) ARCHITECT'S CERTIFICATE Date: 06.05.2024 To, M/s. Ambit Builders & Developers 201/203, Vinay Bhavya Complex, CST Road, Kalina, Santacruz (E) Mumbai - 400 098. Subject: Certificate of Percentage of Completion of Construction Work October to December 2023 “Ambit Vista” on slum plot bearing CTS. No. 2046, 2048, of Village Vileparle (E), & CTS No. 5, of Village Bandra I Ward , and F.P. No. 138 & 139, Santacruz TPS-V, Tal.-Andheri, Mumbai With S.R. Scheme under Regulation 33(11) of DCPR-2034 on non-slum plot bearing CTS. No. 2049 of Village- Vile Parle (E), Tal- Andheri F.P. No. 137, Santacruz TPS-V, Santacruz (East), Mumbai- 400055. For "Santacruz Mangalmurti & Sai Baba CHS. Ltd." having MahaRERA Registration Number: P51800052265 being developed by M/s. Ambit Builders & Developers Sir, I Arun Gurav, have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction Work of “Ambit Vista” having MahaRERA Registration Number: P51800052265 being developed by M/s. Ambit Builders & Developers. Following Technical Professionals appointed by the Owner/Promoters:- 1. Architects : M/s Skyline Inframart Consultants LLP. 2. Structural Consultant : Samishthi Techno Services 3. MEP Consultant : Samishthi Techno Services 4. Site Supervisor : Mr. Akram Mestry Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE – A Sr Task/Activities Percentage of Work Done No A Wing B Wing C Wing D Wing 1 Excavation. 0% 0% 100% 100% 2 Basements (if any): (Minus 3 level Parking 0% 0% 50% 50% Basement) 3 Podiums (if any): NA Number NA NA NA NA 4 Plinth 0% 0% 0% 0% 5 Stilt Floor: NA Number 0% 0% 0% 0% 6 Slabs of Super Structure: 7 Floors 0% 0% 0% 0% 7 Internal walls, Internal Plaster, Floorings, 0% 0% 0% 0% Doors and Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0% 0% 0% 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground 0% 0% 0% 0% Water Tanks 10 External plumbing and external plaster, elevation, completion of terraces with 0% 0% 0% 0% waterproofing of the Building/ Wing. 11 Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO Noc, Electrical fittings, Mechanical equipment, compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s. plinth protection, paving 0% 0% 0% 0% of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. any other activities. TABLE B Common Areas (Internal and External Development works) in respect of the Registered Phase / Project Number Sr. Common areas and facilities Propose Percentage of Details No d (Yes/ Actual Work No) Done (As on date of the (3) Certificate) (1) (2) (4) (5) 1 Internal Roads & Footpaths. No 0% NA 2 Water Supply. YES 0% As per MCGM approvals 3 Storm Water Drains. YES 0% As per MCGM norms 4 Landscaping & Tree Planting. YES 0% As per Tree NOC 5 Solid Waste management & Disposal. YES 0% Proposed 6 Water conservation /Rain Water YES 0% Proposed harvesting. 7 Energy Management YES 0% Proposed 8 Fire protection and fire safety YES 0% Proposed requirement. 9 Electrical meter room, sub-station, YES 0% Proposed receiving station. 10 Lounge & Refreshment Bar YES 0% Proposed 11 Observation Deck YES 0% Proposed 12 Outdoor sitting YES 0% Proposed 13 Party Lawn YES 0% Proposed 14 Pool side Deck YES 0% Proposed 15 Sky Deck YES 0% Proposed 16 Sky Lounge YES 0% Proposed 17 Spiritual Zone YES 0% Proposed 18 Yoga Deck YES 0% Proposed 19 Yoga Room / Hobby Room: YES 0% Proposed 20 Aggregate area of recreational Open NO 0% NA Space 21 Water Supply YES 0% Proposed - BMC Water connection. 22 Storm Water Drains YES 0% Proposed - SWD. 23 Solid Waste Management and YES 0% Proposed - OWC and Disposal disposal through Vendor. Yours Faithfully For M/S SKYLINE INFRAMART CONSULTANTS LLP. ARUN Digitally signed by ARUN VISHRAM GURAV VISHRAM Date: 2024.05.06 13:24:34 GURAV +05'30' Arun Gurav L/S No: 840002661 Agreed and Accepted by: M/S AMBIT BUILDERS & DEVELOPERS Digitally signed by Rajendra Rajendra Prasad Sharma Prasad Sharma Date: 2024.05.06 14:37:45 +05'30' Authorized Signatory Date-________________