Annexure A FORM 1 (See Regulation -3) ARCHITECT'S CERTIFICATE Date: 10.07.2025 To, Ambit Builders & Developers Office No 102 & 103, First Floor, Grande Edifice, Opp Godrej Reserve, Akurli Road, Kandivali (East), Mumbai 400 101. Subject: Certificate of Percentage of Completion of Construction Work “Ambit Vista” on slum plot bearing CTS. No. 2046, 2048, of Village Vileparle (E), & CTS No. 5, of Village Bandra I Ward, and F.P. No. 138 & 139, Santacruz TPS- V, Tal.-Andheri, Mumbai with S.R. Scheme under Regulation 33(11) of DCPR- 2034 on non-slum plot bearing CTS. No. 2049 of Village- Vile Parle (E), Tal- Andheri F.P. No. 137, Santacruz TPS-V, Santacruz (East), Mumbai- 400055. For "Santacruz Mangalmurti & Sai Baba CHS. Ltd." having MahaRERA Registration Number: P51800052265 being developed by M/s. Ambit Builders & Developers Sir I Arun Gurav, have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction Work of “Ambit Vista” having MahaRERA Registration Number: P51800052265 being developed by M/s. Ambit Builders & Developers. Following Technical Professionals appointed by the Owner/Promoters: - 1. Architects : M/s Skyline Inframart Consultants LLP. 2. Structural Consultant : Samishthi Techno Services 3. MEP Consultant : Samishthi Techno Services 4. Site Supervisor : Mr. Sachin Swaminath Ayyangar. Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on 01st April 2025 to 30st June 2025 (First Quarter of F.Y. 2025- 26), the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per Table “A” herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table “B”. 6th Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com TABLE – “A” Sr No Percentage of Work Done Task/Activities A Wing B Wing C Wing D Wing 1 Excavation. 100% 100% 100% 100% 2 Basements (if any): (Minus 3 level Parking Basement) 100% 100% 100% 100% 3 Podiums (if any): NA Number NA NA NA NA 4 Plinth 100% 100% 100% 100% 5 Stilt Floor: NA Number 0% 0% 0% 0% 6 Slabs of Super Structure: 7 Floors 28% 85.00% 100.00% 100.00% 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 0% 60.00% 75.00% 75.00% 8 Sanitary Fittings within the Flat/Premises 0% 0% 0% 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 40.00% 10.00% 85.00% 85.00% 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/ Wing. 0% 0% 10% 10% 11 Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO Noc, Electrical fittings, Mechanical equipment, compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. any other activities. 0% 0% 0% 0% 6th Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com TABLE “B” Common Areas (Internal and External Development works) in respect of the Registered Phase / Project Number Sr. Common areas and facilities Proposed Percentage of Details No (Yes/ No) Actual Work Done (As on (3) date of the Certificate) (1) (2) (4) (5) 1 Internal Roads & Footpaths. No 0% NA 2 Water Supply. YES 0% As per MCGM approvals 3 Storm Water Drains. YES 0% As per MCGM norms 4 Landscaping & Tree Planting. YES 0% As per Tree NOC 5 Solid Waste management & Disposal. YES 0% Proposed 6 Water conservation /Rain Water harvesting. YES 0% Proposed 7 Energy Management YES 0% Proposed 8 Fire protection and fire safety requirement. YES 0% Proposed 9 Electrical meter room, sub-station, receiving station. YES 0% Proposed 10 Lounge & Refreshment Bar YES 0% Proposed 11 Observation Deck YES 0% Proposed 12 Outdoor sitting YES 0% Proposed 13 Party Lawn YES 0% Proposed 14 Pool side Deck YES 0% Proposed 15 Sky Deck YES 0% Proposed 16 Sky Lounge YES 0% Proposed 17 Spiritual Zone YES 0% Proposed 18 Yoga Deck YES 0% Proposed 19 Yoga Room / Hobby Room: YES 0% Proposed 20 Aggregate area of recreational Open Space NO 0% NA 21 Water Supply YES 0% Proposed - BMC Water connection. 22 Storm Water Drains YES 0% Proposed - SWD. 23 Solid Waste Management and Disposal YES 0% Proposed - OWC and disposal through Vendor. Yours Faithfully For M/S SKYLINE INFRAMART CONSULTANTS LLP. ARUN Digitally signed by ARUN VISHRAM GURAV DN: c=IN, postalCode=400067, st=MAHARASHTRA, street=MUMBAI, l=MUMBAI, o=Personal, VISHRAM serialNumber=6a5bd8a5f3814a56f6c4adbd35f 9b5e78b1f48eb438e132392760e1c6dd30dda, pseudonym=b4908f43c2dddda2c484be1a417 0facd, 2.5.4.20=891e45117bb0159f794d5b465689148 GURAV cdf29901abfcf99abbc2fdbf95c9cdf49, email=ARUNGURAV786@GMAIL.COM, cn=ARUN VISHRAM GURAV Date: 2025.07.15 11:11:44 +05'30' Arun Gurav L/S No: 840002661 Agreed and accepted by: M/S AMBIT BUILDERS & DEVELOPERS Rajendra Digitally signed by Rajendra Prasad Prasad Sharma Date: 2025.08.29 Sharma 13:43:06 +05'30' Authorized Signatory 6th Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com