Annexure A FORM 1 (See Regulation -3) ARCHITECT'S CERTIFICATE Date: 28.05.2024 To, M/s. Ambit Builders & Developers 201/203, Vinay Bhavya Complex, CST Road, Kalina, Santacruz (E) Mumbai - 400 098. Subject: Certificate of Percentage of Completion of Construction Work on slum plot bearing CTS. No. 2046, 2048, of Village Vileparle (E), & CTS No. 5, of Village Bandra I Ward, and F.P. No. 138 & 139, Santacruz TPS-V, Tal.-Andheri, Mumbai With S.R. Scheme under Regulation 33(11) of DCPR-2034 on non-slum plot bearing CTS. No. 2049 of Village- Vile Parle (E), Tal- Andheri F.P. No. 137, Santacruz TPS-V, Santacruz (East), Mumbai- 400055. For "Santacruz Mangalmurti & Sai Baba CHS. Ltd." having MahaRERA Registration Number : P51800052265 being developed by M/s. Ambit Builders & Developers Sir I Arun Gurav, have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction Work of Ambit having MahaRERA Registration Number : P51800052265 being developed by M/s. Ambit Builders & Developers. Following Technical Professionals appointed by the Owner/Promoters:- 1. Architects : M/s Skyline Inframart Consultants LLP. 2. Structural Consultant : Samishthi Techno Services 3. MEP Consultant : Samishthi Techno Services 4. Site Supervisor : Mr. Akram Mestry Based on Site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on 31st March 2024, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 6th Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com TABLE - A Sr Task/Activities Percentage of Work Done No A B C D Wing Wing Wing Wing 1 Excavation. 10% 10% 100% 100% 2 Basements (if any): (Minus 3 level Parking Basement) 0% 0% 100% 100% 3 Podiums (if any): NA Number 0% 0% 0% 0% 4 Plinth 0% 0% 100% 100% 5 Stilt Floor: NA Number 0% 0% 0% 0% 6 Slabs of Super Structure: 7 Floors 0% 0% 0% 0% 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 0% 0% 0% 0% 8 Sanitary Fittings within the Flat/Premises 0% 0% 0% 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks 0% 0% 0% 0% 10 External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/ Wing. 0% 0% 0% 0% 11 Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as per CFO Noc, Electrical fittings, Mechanical equipment, compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. any other activities. 0% 0% 0% 0% TABLE B Common Areas (Internal and External Development works) in respect of the Registered Phase / Project Number Sr. Common areas and facilities Proposed Percentage Details No (Yes/ No) of Actual Work Done (3) (As on date of the (1) (2) Certificate) (5) (4) 1 Internal Roads & Footpaths. No 0% NA 2 Water Supply. YES 0% As per MCGM approvals 3 Storm Water Drains. YES 0% As per MCGM norms 4 Landscaping & Tree Planting. YES 0% As per Tree NOC 6th Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com 5 Solid Waste management & YES 0% Proposed Disposal. 6 Water conservation /Rain Water YES 0% Proposed harvesting. 7 Energy Management YES 0% Proposed 8 Fire protection and fire safety YES 0% Proposed requirement. 9 Electrical meter room, sub- YES 0% Proposed station, receiving station. 10 Lounge & Refreshment Bar YES 0% Proposed 11 Observation Deck YES 0% Proposed 12 Outdoor sitting YES 0% Proposed 13 Party Lawn YES 0% Proposed 14 Pool side Deck YES 0% Proposed 15 Sky Deck YES 0% Proposed 16 Sky Lounge YES 0% Proposed 17 Spiritual Zone YES 0% Proposed 18 Yoga Deck YES 0% Proposed 19 Yoga Room / Hobby Room: YES 0% Proposed 20 Aggregate area of recreational NO 0% NA Open Space 21 Water Supply YES 0% Proposed - BMC Water connection. 22 Storm Water Drains YES 0% Proposed - SWD. 23 Solid Waste Management and YES 0% Proposed - OWC and Disposal disposal through Vendor. Yours Faithfully For M/S SKYLINE INFRAMART CONSULTANTS LLP. Arun Gurav L/S No: 840002661 Agreed and accepted by: M/S AMBIT BUILDERS & DEVELOPERS Authorized Signatory 6th Floor, Unit No. 611, Omkar The Summit Business Bay, Nr. Western Express Highway, Gundavali, Andheri (E) Tel: 022-28694474, Email: office@skylineinfra.org, Website: www.skylineinfrabuilt.com