I NASA Archileciurol Consultonis (Pvt.) Ltd. ctN - u74l 40MH20l 0PTC200I 23 FORM - 1 31.12.2023 ARCHITECT CERTIFICATE To, M/s. SHREEJI REALTIES PVT" LTD. Shreeji Group, 1 Saurabh, Behind Andhra Bank, Opp. Crisl House, Chakala, Andheri Kurla Road, Andheri (East), Mumbai Sub: Certificate of Percentage of Gompletion of Construction work of GREEN ORIGIN having Maha RERA Reg. No. P51800052282 situated on the plot bearing GTS No. 18/G, demarcated by its boundaries to the North (Existing Road), to the South (CTS No. 20 B) to the East (CTS No. 17) to the West (CTS No 19/5) of Konkan Division, of Village Mulund, at Ghati Pada Road, Mulund (W), Taluka Kurla, District Mumbai Subarbs Pin- 400 080 as per area 9374.82 Sq. Mt area being developed by M/s. SHREEJI REALTIES PVT" LTD. Sir, We M/s. NASA Architectural Consultants Pvt Ltd. have undertaken assignment as Licensed Surveyor of certifying of Construction work of the Residential Building project for situated on the plot bearing CTS No. 18/G plot of Konkan Division, of Village Mulund, at Ghati Pada Road, Mulund (W), in T-Ward,Taluka Kurla, District Mumbai Subarbs Pin- 400 080. Total Built Up Area proposed admeasuring 9374.82 Sq. Mt. (ln lieu of Plot potential + 0.50 additional FSI + admissible TDR (as per road width TDR / FSI) + admissible Fungible Compensatory FSI) being developed by M/s" Shreeji Realites Pvt. Ltd" 1" Following Technical professional are appointed by Owner :- i) Mr. Sachin S. Sulkude of NASA ACPL As License Surveyor. ii) Varma Mr. Rohit Ravindra As Structural Consultants. iii) Mr" V" D" Sawant" As Plumber" iv) Mr. Madhusudan Shah" As Site Supervisor Based on the Site Inspection, with respect of the building of the aforesaid Real Estate Project, We certify that as on the date of this certificate, the Percentage of work done of the Building of the Real Estate Project under Maha RERA i as per Table-A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detail in Table-B. o ARCHITECTS o ENGINEERS o LANDSCAPE DESIGNERS o CONTRACTORS GALA NO" GD-3, GROUND FLOOR, KARMA STAMBH lND. ESTATE, L.B,S. MARG, VIKHROLI (W). Mumboi:083. TEL:- 25783009, E-MAlt:- noso-ocpl@yohoo.com & nosoocpl@gmoil.com \IASA Arch:tecturol Consulionts (Pvi.) Ltd. ctN - uz4l 40MH20l 0PTc200l 23 TABLE - A Proposed redevetopment of Residential Building comprising ofWingA&B consisting of Lower Ground floor + Upper Ground floor + 1st to 4th podium floor + 5th to 21th upper floor. Sr. Tasks / Activity Percentage of No. Work 1 Excavation 100% 2 Lower Ground and Upper Ground due topography of site) 65% 3 Podium (Upper Ground due topography of site) 20% 4 Stilt Floor 0.00% 5 20 Nos. of Slabs of SuPer Structure 0.00 % 6 lnternal Walls, lnternal Plaster, Flooring within Flats I 0.00% Premises, Doors and Windows to each of the Flats / Premises completed. 7 Sanitary fittings within the Flats / Premises, Electrical Fittings 0.00% within the Flats / Premises 8 Staircase / Lift Wells and Lobbies as each floor level 0.00% connecting Staircase & Lifts, Will be Overhead & underground Water Tanks completed before O.C.C. I The external plumbing's and external plaster, elevation, 0.00% completion of Terrace with Water Proofing of the Building upto th 18 floor. 10 Installation of LiftsMater Pumps/Fire Fighting Fittings and 0.00% equipment as per CFO's NOC, Electrical Fittings to common areas, electro, Mechanical Equipment, Compliance to condones of EnvironmenUCM NOC, Finishing to Entrance Lobby / Plinth protection, paving of areas appurtant to Building, compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 11 Overall Percentage of Completion of the work done for the 0.00% entire Building. o ARCIIITEeTS o FNGINEERS o LANDSeAPE DESIGNERS o CONTRACTORS GALA NO" GD-3, GROUND FLOOR, KARMA STAMBH IND. ESTATE, L.B"S" MARG, VIKHROLI (W). MUMbOi- 083. TEL:- 25783009, E-MAlt:- noso-ocpl@yohoo.com & nosoocpl@gmoil'com I{ASA Architecturol Consultonls (Pvt.) Ltd ctN - u74l 40MH20l 0PTC200I 23 TABLE - B Sr" Common Areas & Facilities, Proposed Percentage Details No. Aminites (Yes/No) of Comoletion 1 Internal roads and Footpaths No 2 Water Supplv Yes 0.00% 3 Sewerage (Chamber, Lines, Yes 0.00% Septic Tank) 4 Strom Water Drain Yes 0.00% 5 Landscaoinq & Tree Plantinq Yes 0.00% Sr. No. 6 Street Liqhtinq No 3,4,5,9,10,12,13 7 CommuniW buildinqs No will be 8 Treatment and Disposal of No completed Sewaqe and sullaqe Water before asking for 9 Solid Waste Management & Yes 0.00% OGC from BMC. Disposal 10 Water Conservation. Rain Yes 0.00% Water Harvestino 11 Enerov Manaoement No 12 Fire Protection & Fire Sefty Yes 0.00% Reouirement 13 Electrical Meter Panel , Sub- Yes 0.00% Station, Receivinq Station 14 Other (option to add more) Yours faithfully For NASA Architectural Consultants Pvt. Ltd. Dgilatry ngned by sULKUDE sACHIN SULKU DE 5HNruI SACHIN pnalcde4089, n=Mahra5htra, *rbf Nul.'#5c461H836s54061re SHIVAJI d4,