I{ASA Architecturol Consultonls (pvi.) Ltd. ctN - u74 I 40MH20l }Pr C2cot 23 FORM - 1 16.10.2023 ARCHITECT CERTIFICATE To, M/s. SHREEJI REALTIES PW. LTD. Shreeji Group, 1 Saurabh, Behind Andhra Bank, Opp. Crisl House, Chakala, Andheri Kurla Road, Andheri (East), Mumbai Sub: Certificate of Percentage of Completion of Construction work of GREEN ORIGIN having Maha RERA Reg" No. P51800052282 situated on the plot bearing GTS No. 18/G, demarcated by its boundaries to the North (Existing Road), to the South (CTS No. 20 B) to the East (CTS No. 17) to the West (CTS No 19/5) of Konkan Division, of Village Mulund, at Ghati Pada Road, Mulund (W), Taluka Kurla, District Mumbai Subarbs Pin- 400 080 as per area 9374.82 Sq. Mt area being devetoped by M/s. SHREEJI REALTIES PVT. LTD. Sir, We M/s. NASA Architectural Gonsultants Pvt Ltd. have undertaken assignment as Licensed Surveyor of certifying of Construction work of the Residential Building project forsituated on the plot bearing CTS No. 18/C plot of Konkan Division, of Village Mulund, at Ghati Pada Road, Mulund (W), in T-Ward,Taluka Kurla, District Mumbai Subarbs pin- 400 080" Total Built Up Area proposed admeasuring 9374.82 Sq. Mt. (ln lieu of plot potential + 0.50 additional FSI + admissible TDR (as per road width TDR / FSI) + admissible Fungible Compensatory FSI) being developed by M/s. Shreeji Realites Pvt. Ltd. 1" Following Technical professional are appointed by Owner :- i) Mr. Sachin S" Sulkude of NASA ACPL As License Surveyor. ii) Mr" Rohit Ravindra Varma As Structural Consultants. iii) Mr. V. D. Sawant. As Plumber. iv) Mr. Madhusudan Shah" As Site Supervisor Based on the Site Inspection, with respect of the building of the aforesaid Real Estate Project, We certify that as on the date of this certificate, the Percentage of work done of the Building of the Real Estate Project under Maha RERA i as per Table-A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detail in Table-B. o ARCHITECTS o ENGINEERS o LANDSCAPE DESIGNERS o CONTRACTORS GALA NO' GD-3;'GROUND FLOOR, KARMASTAMBH lND. ESTATE, L.B.S. MARG; VIKHROLI (W), Mumboi- 083. TEL:- 25783009, E-MAIL:: noso:ocpl@yohoo.com & nosoocpl@gmoil.com N Archileciurol Consultonts (Pvi.) Ltd. ctN - u74l 40MH20l 0PTC200I 23 TABLE - A Proposed redevelopment of Residential Building Comprising of Wing A & B consisting of Lower Ground floor + Upper Ground floor + 1st to 4th podium floor + 5th to 21th upper floor. Sr. Tasks / Activity Percentage of No" Work 1 Excavation 100% 2 Lower Ground and Upper Ground due topography of site) 30% 3 Podium (Upper Ground due topography of site) 0.00% 4 Stilt Floor 0.00% 5 20 Nos. of Slabs of Super Structure 0.00 % 6 Internal Walls, lnternal Plaster, Flooring within Flats I 0.00% Premises, Doors and Windows to each of the Flats / Premises completed. 7 Sanitary fittings within the Flats / Premises, Electrical Fittings 0.00% within the Flats / Premises 8 Staircase / Lift Wells and Lobbies as each floor level 0.00% connecting Staircase & Lifts, Will be Overhead & underground Water Tanks completed before O.C.C. I The external plumbing's and external plaster, elevation, 0.00% completion of Terrace with Water Proofing of the Building upto th 18 floor. 10 Installation of LiftsMater Pumps/Fire Fighting Fittings and 0.00% equipment as per CFO's NOC, Electrical Fittings to common areas, electro, Mechanical Equipment, Compliance to condones of EnvironmenVCM NOC, Finishing to Entrance Lobby / Plinth protection, paving of areas appurtant to Building, compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 11 Overall Percentage of Completion of the work done for the 0.00% entire Building. o ARCFIITECTS o ENGINEERS o L,ANDSCAPE DESIGNERS o CONTRACTORS GALA NO. GD-3, GROUND FLOOR. KARMA STAMBH lND. ESTATF, L.B.S. VIKHROLI (W). Mumboi- 083. TEL:- 25783009, E-MAIL:- noso_,ocpl@yc hoo.com & ^,4ARG, nosoocpl@gmoil.com NASA Architecturol Consultonls (Pvi.) Lid" clN - u74l 40MH20t oPI C2m1 23 TABLE - B Sr. Common Areas & Facilities, Proposed Percentage Details No. Aminites (Yes/No) of Gompletion 1 Internal roads and Footpaths No 2 Water Supplv Yes 0.00% 3 Sewerage (Chamber, Lines, Yes 0.00% Septic Tank) 4 Strom Water Drain Yes 0.00% 5 Landscapinq & Tree Plantinq Yes 0.00% Sr. No. 6 Street Liqhtinq No 3,4,5,9,10,12,',,3 7 Community buildinqs No will be 8 Treatment and Disposal of No completed Sewaqe and sullaqe Water before asking for I Solid Waste Management & Yes 0.00% OCC from BMC" Disoosal 10 Water Conservation, Rain Yes 0.00% Water Harvestino 11 Enerqv Manaoement No 12 Fire Protection & Fire Sefty Yes 0.00% Reouirement 13 Electrical Meter Panel , Sub- Yes 0.00% Station, Receivinq Station 14 Other (option to add more) Yours faithfully For NASA Architectural Gonsultants Pvt. Ltd. ugirdtignd by SUIKUDE$CHIN 5HV&l SULKUDE SACHIN e9.