Annexure A FORM 1 [See regulation 3] ARCHITECT CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Accounts) Date :- 28.01.2025 To, Mr. Devashish Raval, Office No. 9, Saroj Apartments, 5 V.P. Road, Vile Parle (West), Mumbai – 400056. Subject: Certificate of percentage of Completion of Construction Work of Himanshu Mandar having MaharRera Registration Number P5180052268 (Only Applicable after project registration) Being developed by Mr Devashish Raval Sir, I Umesh Pravinchandra Bhatt have undertaken assignment as Architect of percentage of Completion of construction work of Himanshu Mandar Having MahaRera Registration Number P5180052268, Being developed By Mr. Devashish Raval. Based On site Inspection, with respect to layout / each of the building/Wing of the aforesaid real estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/Wing of the Real estate project under MahaRera is as per Table A herein Below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Telefax:2861 5444 / 2801 1921 / 2801 4816 * E-mail: archumeshbhatt@gmail.com TABLE-A Building to be prepared separately for each Building of the project Sr no Task and activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 100% 2 Basement (if any) N.A 3 Podiums (if any) N.A 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of super Structure (1st to 10th) 100% 7 Internal walls, 95% Internal plaster, 90% floorings, 90% Doors and windows within Flats/Premises 90% 8 Sanitary Fittings within the Flat/Premises 90% 9 Staircases, 100% Lifts Wells 100% and Lobbies at each Floor level 90% Overhead and 0% underground water tanks. 100% 10 External plumbing 85% and external plaster, 85% elevation, 90% completion of terraces with waterproofing of the 0% Building/Wing, 11 Installation of lifts, 90% water pumps, 100% Fire Fighting Fittings and Equipment as per CFO 90% NOC, 90% Electrical fittings mechanical equipment, 100% Finishing to entrance lobby/s, 100% plinth protection, 100% paving of areas appurtenant to Building/Wing, 100% Compound Wall and 85% all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities. TABLE B Common areas (internal and external road development works) in respect of the registered phase / project number Sr Common areas and Facilities Proposed Percentage of Details no (YES/NO) Actual Work Done 1 Internal Roads & Footpaths No NA 2 Water Supply Yes 85% MCGM 3 Sewerage (Chamber, Yes 100% MCGM lines, Septic tank, STP) 4 Storm Water Drains Yes 100% MCGM 5 Landscaping & Tree Planting Yes 100% MCGM 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of No NA sewage and sullage water. 9 Solid Waste management & Yes 85% MCGM Disposal 10 Water conservation / Rain Yes 100% MCGM water harvesting 11 Energy management No NA 12 Fire protection and Fire Yes 85% MCGM Safety Requirements 13 Electrical motor room, sub- Yes 100% MCGM station, receiving station. 14 Others (Option to Add more) Yours Faithfully, UMESH Digitally signed by UMESH PRAVINCHANDRA PRAVINCHAN BHATT Date: 2025.01.28 17:17:00 DRA BHATT +05'30' Architect Umesh Bhatt (License No.CA/87/10412) Agreed and Accepted by DEVASHISH Digitally signed by DEVASHISH PRADEEP RAVAL PRADEEP RAVAL Date: 2025.01.28 18:32:18 +05'30' Name: Devashish Raval Date: 28.01.2025