S. S. ASSOCIATES 1103, OPAL SQUARE, S.G. BARVE MARG, OPP. MIDC WAGLE ESTATE THANE (W)- 400 604 FORM 1 ARCHITECT’S CERTIFICATE ( As on 30th September 2024 ) Date: 30/09/2024 To Shraddha Prime Projects Limited, Ground Floor + 1st Floor, Manisha Heights Commercial Building, Vaishali Nagar, Mulund West, Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction Work of Composite Building of “SHRADDHA PALACIOUS” having MahaRERA Registration Number ‘P51800052241’ of plot located at CTS No 396, 396/1 to 59 of Village Kanjur, Bhandup (W), Taluka Kurla, Mumbai Suburban District, Mumbai – 400078, Maharashtra. being developed by M/s Shraddha Prime Projects Limited. Sir I Mrs. Sheetal Nikhare of M/s S. S. Associates have undertaken assignment of Architect of certifying percentage of completion of construction work of project known as “SHRADDHA PALACIOUS” having MahaRERA Registration Number ‘P51800052241’ of plot located at CTS No 396, 396/1 to 59 of Village Kanjur, Bhandup (W), Taluka Kurla, Mumbai Suburban District, Mumbai – 400078, Maharashtra. being developed by M/s Shraddha Prime Projects Limited. Based on the Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid real estate project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/wing of the real estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A REHAB BUILDING (WING – A) Sr. Tasks / Activity % of No Work Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 0% 3. 0 Number of Podiums 0% 4. Stilt Floor 100% 5. Plinth 100% 6. 23 Number of Slabs of Super Structure (22 Habitable Floors) 100% 7. Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors and 100% Windows to each of the Flat / Premises S. S. ASSOCIATES 1103, OPAL SQUARE, S.G. BARVE MARG, OPP. MIDC WAGLE ESTATE THANE (W)- 400 604 8. Sanitary Fittings within the Flat / Premises, Electrical Fittings within the Flat 100% / Premises 9. Staircases, Lifts Wells and Lobbies at Each Floor Level connecting staircases 100% and lifts, Overhead and Underground Water Tanks 10. The external plumbing and external plaster, elevation, completion of terraces 100% with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as 100% per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby, Plinth Protection, Paving of Areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. REHAB BUILDING (WING – B) Sr. Tasks / Activity % of No Work Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 0% 3. 0 Number of Podiums 0% 4. Stilt Floor 0% 5. Plinth 100% 6. 19 Number of Slabs of Super Structure (18 Habitable Floors) 0% 7. Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors and 0% Windows to each of the Flat / Premises 8. Sanitary Fittings within the Flat / Premises, Electrical Fittings within the Flat 0% / Premises 9. Staircases, Lifts Wells and Lobbies at Each Floor Level connecting staircases 0% and lifts, Overhead and Underground Water Tanks 10. The external plumbing and external plaster, elevation, completion of terraces 0% with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as 0% per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby, Plinth Protection, Paving of Areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. S. S. ASSOCIATES 1103, OPAL SQUARE, S.G. BARVE MARG, OPP. MIDC WAGLE ESTATE THANE (W)- 400 604 SALE WING-A “SHRADDHA PALACIOUS” Sr. Tasks / Activity % of No Work Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 100% 3. 6 Numbers of Part Podiums 0% 4. Stilt Floor 0% 5. Plinth 100 % 6. 29 Number of Slabs of Super Structure (22 Habitable Floors) above Podium 0% 7. Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors and 0% Windows to each of the Flat / Premises 8. Sanitary Fittings within the Flat / Premises, Electrical Fittings within the Flat 0% / Premises 9. Staircases, Lifts Wells and Lobbies at Each Floor Level connecting staircases 0% and lifts, Overhead and Underground Water Tanks 10. The external plumbing and external plaster, elevation, completion of terraces 0% with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as 0% per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby, Plinth Protection, Paving of Areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. SALE WING – B “SHRADDHA PALACIOUS” Sr. Tasks / Activity % of No Work Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 100% 3. 6 Numbers of Part Podiums 0% 4. Stilt Floor 0% 5. Plinth 100 % 6. 29 Number of Slabs of Super Structure (22 Habitable Floors) above Podium 4.55 % 7. Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors and 0% Windows to each of the Flat / Premises 8. Sanitary Fittings within the Flat / Premises, Electrical Fittings within the Flat 0% / Premises 9. Staircases, Lifts Wells and Lobbies at Each Floor Level connecting staircases 0% S. S. ASSOCIATES 1103, OPAL SQUARE, S.G. BARVE MARG, OPP. MIDC WAGLE ESTATE THANE (W)- 400 604 and lifts, Overhead and Underground Water Tanks 10. The external plumbing and external plaster, elevation, completion of terraces 0% with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as 0% per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby, Plinth Protection, Paving of Areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. The percentage of work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of work done with respect to each of the Building / Wing is detailed in Table B. TABLE B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common Areas and Proposed Percentage Details No Facilities, Amenities (Yes / No) of Work Done 1. Internal Roads & Footpaths Yes 0% Yes DEVELOPER 2. Water Supply Yes 0% NOC From MCGM & Built by Developer 3. Sewerage (Chamber Lines, Yes 0% Chamber Lines Septic Tank, STP) 4. Storm Water Drains Yes 0% NOC From MCGM & Built by Developer 5. Landscape & Tree Planting Yes 0% NOC From MCGM & Built by Developer 6. Street Lighting No NA NA 7. Community Buildings No NA NA 8. Treatment and Disposal of No 0% NA sewage and sullage water 9. Solid Waste Management & Yes 0% Provision made by Disposal Developer 10. Water Conservation, Rain Yes 0% Rain Water Harvesting to Water Harvesting be built by Developer 11. Energy Management Yes 0% Provided by Developer 12. Fire Protection & Fire Safety Yes 0% NOC From MCGM & Built Requirements by Developer 13. Electrical Meter Room, Sub- Yes 0% Electric Meter Room Only S. S. ASSOCIATES 1103, OPAL SQUARE, S.G. BARVE MARG, OPP. MIDC WAGLE ESTATE THANE (W)- 400 604 station, receiving station / Sub-station if required Thanking You, Yours Faithfully, SHEETAL Digitally signed by SHEETAL KALPESH KALPESH RATHOD Date: 2024.10.22 RATHOD 19:06:49 +05'30' SHEETAL NIKHARE FOR S. S. ASSOCIATES (CA/2003/31138) Agreed and accepted by Signature of Promoter Name: Sudhir Mehta (Partner of M/s Shraddha Prime Projects Limited) Date: 30-09-2024