1103, OPEL SQUARE, S. G. BURVE MARG, OPP. MIDC THANE, WAGLE ESTATE, THANE (WEST) – 400 604. Land line - 022 2081 3369 email : ss_associates1@yahoo.co.in FORM 1 ARCHITECT’S CERTIFICATE (As on 31ST December 2024) Date: 31/12/2024 To Shraddha Prime Projects Limited, Ground Floor + 1st Floor, Manisha Heights Commercial Building, Vaishali Nagar, Mulund West, Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction Work of Composite Building of “SHRADDHA PALACIOUS” having MahaRERA Registration Number ‘P51800052241’ of plot located at CTS No 396, 396/1 to 59 of Village Kanjur, Bhandup (W), Taluka Kurla, Mumbai Suburban District, Mumbai – 400078, Maharashtra. being developed by M/s Shraddha Prime Projects Limited. Sir I Mrs. Sheetal Nikhare of M/s S. S. Associates have undertaken assignment of Architect of certifying percentage of completion of construction work of project known as “SHRADDHA PALACIOUS” having MahaRERA Registration Number ‘P51800052241’ of plot located at CTS No 396, 396/1 to 59 of Village Kanjur, Bhandup (W), Taluka Kurla, Mumbai Suburban District, Mumbai – 400078, Maharashtra. being developed by M/s Shraddha Prime Projects Limited. Based on the Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid real estate project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/wing of the real estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 1103, OPEL SQUARE, S. G. BURVE MARG, OPP. MIDC THANE, WAGLE ESTATE, THANE (WEST) – 400 604. Land line - 022 2081 3369 email : ss_associates1@yahoo.co.in TABLE A REHAB BUILDING (WING – A) Sr. % of Work Tasks / Activity No Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 0% 3. 0 Number of Podiums 0% 4. Stilt Floor 100% 5. Plinth 100% 6. 23 Number of Slabs of Super Structure (22 Habitable Floors) 100% Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors and 7. 100% Windows to each of the Flat / Premises Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 8. 100% Flat / Premises Staircases, Lifts Wells and Lobbies at Each Floor Level connecting 9. 100% staircases and lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of 10. 100% terraces with waterproofing of the Building / Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of Environment / CRZ NOC, Finishing 11. 100% to Entrance Lobby, Plinth Protection, Paving of Areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. 1103, OPEL SQUARE, S. G. BURVE MARG, OPP. MIDC THANE, WAGLE ESTATE, THANE (WEST) – 400 604. Land line - 022 2081 3369 email : ss_associates1@yahoo.co.in REHAB BUILDING (WING – B) Sr. % of Work Tasks / Activity No Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 0% 3. 0 Number of Podiums 0% 4. Stilt Floor 0% 5. Plinth 100% 1/19 6. 19 Number of Slabs of Super Structure (18 Habitable Floors) 5.26 % Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors and 7. 0% Windows to each of the Flat / Premises Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 8. 0% Flat / Premises Staircases, Lifts Wells and Lobbies at Each Floor Level connecting 9. 0% staircases and lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of 10. 0% terraces with waterproofing of the Building / Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of Environment / CRZ 11. NOC, Finishing to Entrance Lobby, Plinth Protection, Paving of Areas 0% appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. 1103, OPEL SQUARE, S. G. BURVE MARG, OPP. MIDC THANE, WAGLE ESTATE, THANE (WEST) – 400 604. Land line - 022 2081 3369 email : ss_associates1@yahoo.co.in SALE WING-A “SHRADDHA PALACIOUS” Sr. % of Work Tasks / Activity No Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 100% 3. 6 Numbers of Part Podiums 0% 4. Stilt Floor 0% 5. Plinth 100 % 29 Number of Slabs of Super Structure (22 Habitable Floors) above 1/22 6. Podium 4.55 % Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors 7. 0% and Windows to each of the Flat / Premises Sanitary Fittings within the Flat / Premises, Electrical Fittings within 8. 0% the Flat / Premises Staircases, Lifts Wells and Lobbies at Each Floor Level connecting 9. 1.13 % staircases and lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of 10. 0% terraces with waterproofing of the Building / Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 11. Environment / CRZ NOC, Finishing to Entrance Lobby, Plinth 0% Protection, Paving of Areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. 1103, OPEL SQUARE, S. G. BURVE MARG, OPP. MIDC THANE, WAGLE ESTATE, THANE (WEST) – 400 604. Land line - 022 2081 3369 email : ss_associates1@yahoo.co.in SALE WING – B “SHRADDHA PALACIOUS” Sr. % of Work Tasks / Activity No Done 1. Excavation 100% 2. No Basement Only 1 Number of Plinth 100% 3. 6 Numbers of Part Podiums 0% 4. Stilt Floor 0% 5. Plinth 100 % 29 Number of Slabs of Super Structure (22 Habitable Floors) above 1/22 6. Podium 9.09 % Internal Walls, Internal Plaster, Flooring with Flat / Premises, Doors 7. 0% and Windows to each of the Flat / Premises Sanitary Fittings within the Flat / Premises, Electrical Fittings within 8. 0% the Flat / Premises Staircases, Lifts Wells and Lobbies at Each Floor Level connecting 9. 2.27 % staircases and lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of 10. 0% terraces with waterproofing of the Building / Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of Environment / CRZ 11. NOC, Finishing to Entrance Lobby, Plinth Protection, Paving of Areas 0% appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Any other activities. The percentage of work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of work done with respect to each of the Building / Wing is detailed in Table B. 1103, OPEL SQUARE, S. G. BURVE MARG, OPP. MIDC THANE, WAGLE ESTATE, THANE (WEST) – 400 604. Land line - 022 2081 3369 email : ss_associates1@yahoo.co.in TABLE B Internal & External Development Works in Respect of the entire Registered Phase Percentage Sr. Common Areas and Proposed of Work Details No Facilities, Amenities (Yes / No) Done 1. Internal Roads & Footpaths Yes 0% Yes DEVELOPER NOC From MCGM & 2. Water Supply Yes 0% Built by Developer Sewerage (Chamber Lines, 3. Yes 0% Chamber Lines Septic Tank, STP) NOC From MCGM & 4. Storm Water Drains Yes 0% Built by Developer NOC From MCGM & 5. Landscape & Tree Planting Yes 0% Built by Developer 6. Street Lighting No NA NA 7. Community Buildings No NA NA Treatment and Disposal of 8. No 0% NA sewage and sullage water Solid Waste Management & Provision made by 9. Yes 0% Disposal Developer Rain Water Water Conservation, Rain 10. Yes 0% Harvesting to be built Water Harvesting by Developer 11. Energy Management Yes 0% Provided by Developer Fire Protection & Fire Safety NOC From MCGM & 12. Yes 0% Requirements Built by Developer 1103, OPEL SQUARE, S. G. BURVE MARG, OPP. MIDC THANE, WAGLE ESTATE, THANE (WEST) – 400 604. Land line - 022 2081 3369 email : ss_associates1@yahoo.co.in Electric Meter Room Electrical Meter Room, Sub- 13. Yes 0% Only / Sub-station if station, receiving station required Thanking You, Yours Faithfully, SHEETAL Digitally signed by SHEETAL KALPESH RATHOD DN: c=IN, o=null, ou=null, postalCode=400606, l=Thane, st=Maharashtra, street=Maharashtra,IN, KALPESH 2.5.4.20=ee12b7e3ca3c1f0565b785bbcb7 231cf4ec4af2ff3500b41652e44126646319 a, serialNumber=c5488e37060ac2a3d049b7 10d7e28863a46bb04cfea7da74421dbd4f RATHOD 2b1b9afb, email=kalpeshrathod_associates@rediffm ail.com, cn=SHEETAL KALPESH RATHOD Date: 2025.01.20 13:41:27 +05'30' SHEETAL NIKHARE FOR S. S. ASSOCIATES (CA/2003/31138) Agreed and accepted by Signature of Promoter Name: Sudhir Mehta (Partner of M/s Shraddha Prime Projects Limited) Date: 31-12-2024