Annexure A FORM 1 ARCHITECT'S CERTIFICATE Date: 25/11/2024 To, Ajrnera Realty & Infra India Ltd 2nd floor, Citi mall, link road, Andheri-west, Murnbai- 400058 Subject: Certificate of Percentage of Completion of Construction Work of Ajmera Greenfinity A-B wing having MahaRERA Registration Number P51800052226 being developed by Ajmera Realty & Infra India Ltd. Sir, IIWe Sandeep S Shah have undertaken assignment as ArchitectlLicensed Surveyor of certifying Percentage of Completion of Construction Work of Ajmera Greenfinity A-B wing having MahaRERA Registration Number P51800052226, being developed by Ajmera Realty & Infra India Ltd. Based on Site Inspection, with respect to Layout/each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activities of the entire phase is detailed in Table B. TABLE-A Ajrnera Greenfinity Sr. Tasks/Activity Percentage of Actual Work No. (2) done (1) (As on date of the Certificate) (3) 1. Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 28% 7. Internal walls, Internal Plaster, Floorings, Doors 0% and Windows within F1atslPremises 8. Sanitary Fittings within the FlatJPremises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor 30% level Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing. 11. Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Area (Internal and External Development Works) in respect of the Registered PhaselProject Number Sr.No. Commonareas and Facilities Proposed Percentageof Details (Yes/No) ActualWorkDone (As on date of the Certificate) (1) (2) (3) (4) _(~ 1. Internal Roads & Footpaths Yes 0% 2. Water supply Yes 0% 3. Sewerage (Chamber, lines, Yes 50% Septic Tank, STP) 4. Storm Water Drains Yes 30% 5. Landscaping & Tree Planting Yes 0% 6. Street Lighting Yes 0% 7. Community Buildings NA 0% 8. Treatment and disposal of sewage Yes 0% and sullage water. 9. Solid Waste management & Yes 0% Disposal 10. Water conservationlRainwater Yes 0% harvesting. 11. Energy management NA 0% 12. Fire protection and fire safety Yes 0% requirements. t 13. Electrical meter room, sub-station, Yes 0% receiving station. 14. Others (Option to Add more). 0% Yours faithfully,