CASA ARC ARCHITECTS Aditya Kutir, 1st Floor, 4th Road, Khar (W), Mumbai-400 052. Ph: 35136661 Email : casaarch@gmail.com Ref.No.894 23 May 2024 To, M/s. Seasons Avenues Properties 701 Seasons Avenue, Linking Road, Near Ramkrishna Math, Khar (West), Mumbai-400052. Sub.: Certificate of Percentage of Completion of Construction work of the Project "Trimurti " Maha RERA Registration No.P51800052227 situated on the Plot bearing C.T.S. No.411/A, 411/B, 419 of Village Bandra G, at junction of 15th Road, North Avenue Road and Sarojini Road, Santacruz (W), Mumbai, demarcated by its boundaries by 12.20 M. wide North Avenue Road on North, C.T.S. Nos.418 & 412 on South, 12.20 M. wide 15th Road on West and 12.20 M. wide Sarojini Road on East, District Mumbai Suburban, Division Konkan, Maharashtra, admeasuring 2325.80 sq.mts. plot area being developed by M/s. Seasons Avenues Properties. Sir, We CASA ARC have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Project "TRIMURTI" situated on the plot bearing C.T.S. No. 411/A, 411/B, 419 of Village Bandra G, at junction of 15 th Road, North Avenue Road and Sarojini Road, Santacruz (West), Mumbai, admeasuring 2325.80 sq.mts. plot area being developed by M/s. Seasons Avenues Properties. 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri Sheru A. Raza as Architect. (ii) Shri Gautham U. Chande as a Structural Consultant. (iii) Shri Chandrakant V. Mhatre as a Site Supervisor. Based on Site Inspection, with respect of the aforesaid Real Estate Project, we certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project vide number P51800052227 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire project is detailed in Table B. Table A Building / Wing Number (to be prepared separately for each Building/Wing of the Project Sr. No. Tasks/Activity Percentage of work done 1 Excavation 100% 2 2 Nos. of Basements 100% 3 1 number of Podium 90% 4 Stilt Floor at ground level 90% 5 17 number of Slabs of Super Structure 100% 6 Internal walls, Internal Plaster, Floorings within 75% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 40% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 50% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 40% completion of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings 20% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Table-B Internal & External Development Works in Respect of the entire Registered Phase S. No. Common Areas and Facilities, Proposal Percentage Details Amenities (Yes/No) of Work Done 1. Internal Roads & Foot paths No. 0% N.A. 2. Water Supply Yes 0% By MCGM 3. Sewerage (chamber, lines, Septic Yes 0% N.A. Tank , STP) 4. Storm Water Drains Yes 0% N.A. 5. Landscaping & Tree Planting Yes 0% As per approval 6. Street Lighting No 0% N.A. 7. Community Buildings No 0% N.A. 8. Treatment and disposal of sewage No 0% N.A. and sullage water 9. Solid Waste Management & Yes. 0% N.A. Disposal 10. Water conservation, Rain water Yes 0% As per the harvesting. design 11. Energy management No 0% N.A. 12. Fire protection and fire safety Yes 40% As per CFO requirements NOC 13. Electrical meter room, sub-station, Yes 0% As per Adani receiving station Electricity NOC 14. STP No 0% N.A. Yours Faithfully Digitally signed by SHERU ABBAS RAZA SHERU DN: c=IN, postalCode=400063, st=MAHARASHTRA, street=905, CHANDAK PALOMA, VISHWESHWAR NAGAR, BEHIND UDIPI RESTAURANT, l=MUMBAI, o=Personal, serialNumber=c93d86610d803c5ef3314b01cf40a3559864001f068 88a58a93cbf89e6b1fedf, ABBAS RAZA pseudonym=f269ad97c4654997a093401e0a7cc03d, 2.5.4.20=7324b1ee9097084737fe03b6d6fada75d44c16d75b0e33d 8864008ed84864765, email=DILSHERU@GMAIL.COM, cn=SHERU ABBAS RAZA Date: 2024.05.23 16:08:56 +05'30' Sheru A. Raza Architect (Reg.No.CA/99/25350) Agreed & Accepted by M/S. Seasons Avenues Properties (Mr. Kalpesh Patel) Date :23-05-2024