FORM-1 ARCHITECT'S CERTIFICATE Date: 13/10/2025 To, Shri. Bhupesh J Govani Director of Shubhjivan Builders Private Limited CA to Owner, 302 Goyal Shopping Arcade, S.V. Road. Borivali (W), Mumbai.400092 Subject: Certificate of percentage of com pletion of Construction work of “SIANNA HEIGHTS” a Standalone Buil ding of the SINGLE Phase Hav ing Rera Registration Num ber P51800052192 situated on the Land bearing CTS. NO. 913/A&B, 914/A&B, 915/A&B, 917 demarcated by its boundaries (l atitude an d l ongitude of t he end points) 19.25054,72.84913 to the North 19.25013,72.84901 to the South 19.25032,72.84926 to the East 19.25042,72.84888 to the West of T.P.S.III, Village Eksar, Borivali (W), Mumbai. Adm easuring about 2265.20 Sq. Mtrs. Area being dev eloped by Shri. Bhupesh J Govani Director of Shubhjivan Builders Private Limited CA to Owner Sir, We Arch. Sarita S. Manjunath of M /S. Ashok Gandhi consultants LLP hav e undertaken assignm ent as Licensed Architect of certifying Percentage of Com pletion of Constructi on Work of the Project “ SIANNA HEIGHTS ” situated on the Land bearing CTS.NO. 913/A&B, 914/A&B, 915/A&B, 917 dem arcated by its boundaries (l atitude an d longitude of the end points) 19.25054,72.84913 to the North 19.25013,72.84901 to the South 19.25032,72.84926 to the East 19.25042,72.84888 to the West of Village Eksar, I.C. Colony, Borivali(W), Mumbai, adm easuring about 2265.20 Sq. Mtrs. Area being dev el oped by Shri. Bhupesh J Govani Director of Shubhjivan Builders Private Limited CA to Owner Foll owing technical professional s as inform ed are appointed by Owner/Prom oter: - i. Arch. Sarita S. M anjunath of M/S. Ashok Gandhi Consultants LLP as Licensed Arch itect ii. Shri Kaiv ant C. Shah. Consultants as Structural Consul tant iii. M/s. / Shri / Smt. -- N. A, -- MEP Consultant iv . Shri M angesh S. Deorukhakar as Site Superv isor on site. 1 Based on Site Inspection, with respect to the Buil ding of the aforesaid Real Estate Project, I certify that as on 13/10/2025 of this certificate, the percentage of work done for the buil ding of the Real Estate Project to be registered v al id Rera registration Num ber P51800052192 appl ied for as “ SIANNA HEIGHTS ” under Maha RER A is as per 'Table A' herein bel ow. The percentage of the work executed with respect to each of the activ ity of the e ntire phase is detail ed in the 'Table B'. Table A Building – (Project / Building Name) Sr. Task/Activity Percentage of No. work done 1. Excav ation 100 % 2. Pl inth 100 % 3. 3 Nos of Num ber of Podium s 100 % 4. Stil t on Ground Fl oor 100 % 5. 23 Num ber of Slabs of Super structure 100 % incl uding podium sl abs and terrace 6. Internal Walls, Internal Plaster, Fl ooring within Fl ats / Prem ises, Doors and Window 100% to each of the Fl at / Prem ises 7. Sanitary Fitting within the Flat/Prem ises, 100% El ectrical Fitting within the Flat/Prem ises 8. Staircase, Lifts Well s and Lobbies at each Fl oor l evel connecting staircases and Lifts, 100% ov erhead and underground water tanks 9. The External Pl umbing and external walls external plaster, elevation, com plet ion of 100% terraces with waterproofing of the Buil ding/wing, 10. Installation of Lifts, water pum ps, Fire fighting f itting and Equipm ent as per CFO 100% NOC, El ectrical fitting to common areas, el ectro, M echanical Equipm ent, com pl iance to conditions of env ironm ent /CRZ NOC, Fin ish ing to entrance Lobby/s Pl inth Protection, pav ing of areas appurtenant to Buil ding/Wing Com pound Wall and all other requirem ent as m ay be required to obtain Occupation/Com pletion certificate. Note: Percentage of work done st ated is as per approv ed am ended pl an dated 18/03/2024 2 TABLE – B Internal & External Develop ment work in respect of the entire Registered Phase Percent S. Common areas and Proposed age of Details No. Facilities, Amenities (Yes/No) Work done Internal Roads and 0% 1. NO Footpaths 2. Water Suppl y YES 0% FROM MCGM Sewerage 0% 3. (cham ber, l ines, YES septic Tank, STP) 4. Storm Water Drains YES 100% AS PER REM ARKS Landscaping and 100% 5. YES AS PER REM ARKS Tree Planting 6. Street Lighting NO 0% 7. Comm unity Buil dings NO 0% Treatment and 0% 8. disposal of sewage NO and sullage water Sol id Waste 100% 9. management & YES Disposal Water conserv ation, 100% 10. Rain water YES AS PER REM ARKS harv esting 11. Energy M anagement NO 0% Fire protection and 100% AS PER CFO 12. fire safety YES REM ARKS requirem ents El ectrical meter 100% 13. room , sub-station, YES receiv ing station Others (option to 0% 14. add m ore) Note: Percentage of work done stated is as per approv ed am ended plan dated 18/03/2024 Yours Sincerel y, SARITA SATISH Digitally signed by SARITA SATISH MANJUNATH MANJUNATH Date: 2025.10.13 14:16:06 +05'30' For, SARITA S. MANJUNATH, ASHOK GANDHI CONSULTANT LLP 3