vv RISHIAPT. GR. FLR.,JUNCTION OFNEHRU RD., & DIXIT RD., VILE - PARLE (E), MUMBAI - 400 057. Office No.: 90049 9E447 ASSOCIATES e-mail : vishwasjoshi50@gmail.com ARCHITECTS, INT.DESIGNERS REF: DATE:- nrrAdi[yzu2s 30.09.2025 ARCHITECT'S CERTIFICATE To, Shri. Nitin D" Vichare, Director, of M/s Devakshee Developers pvt. Ltd. 175 / 5965, Vikhroli Indrajelt Niketan CHSL Kannamwar Nagar No. 1., Vikhroli (East), Mumbai-4000g3. sub:- Certificate gf of Completion of Construction work for building of L:'|t-"",age "vakolawala cHs Ltd.,, having silver Ark Number p51:0.005?20r being a3.er_onga by shr1. [MahaRERA Registration Nitin D. vichare, Director, of M/s Devakshee Developers pvt. Ltd. Sir, I' shri' vishwas Anant Joshi of M/s v.v. & ASSOCIATES have undertaken assignment as Architect /Licensed surv?gl .f certifying percentage of Completion of Construction work of silver ark nuild ing or ;*akolawala cirs rta.,, having [MahaRERA Registration Number P5180005t220] being developed D' vichare, Director, by shri. Nitin of M/s Devakshee Developers pvt. Ltd. Based on site Inspe:fio., with respect to each of the Building/wing of the aforesaid Real Estate Project, I certify that is on the date of this certiiicate, tfre percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per Table A herein below. The"percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE.A Lay out/ Building / W ing Number Sr. Tasks / Activity Percentage of Actual No Work Done (As on the Date of the 1 Excavation 1,00% 2 Basement's an 07o J Podiums an 0% 4 Stilt Floor 1,00% 5 Slabs of Strucfure 77.77% vv RISHI APT. GR. FLR., JUNCTION OF NEHRU RD., & DIXIT RD., VILE - PARLf, (E), MUMBAI - 400 057. Office No.: 9004998447 A S S O C I AT E S e-mail : vishwas.joshiS0@gmail.com ARCHITECTS, INT.DESIGNERS REF.: DATE:- //2// 6 Internal walls, In ternal Plaster, Floorings, Doors and 20% Windows to each of the Premises 7 F within the Premises 0%o 8 Staircases, Lifts Well S and Lo bbies at each Floor level 0%o Overhead and U Water Tanks 9 External p lumbing and external plaster, elev ation, 0% com pletion of terraces wl th wa terproofing of the 10 Installation of lifts, water Pumps, Fire Fighting Fi ttings 0%o and Equi pment as per CFO NOC, Electrical fi ttings, mechanical equipment, Compliance to condi tions of envuonment CIrz NOC, Finishing to entrance lobby plinth protectiory paving of areas appurtenant s/ to Building/ Wing, Compound Wall and all other req uirements AS may be req uired to complete project AS Per specification ln agreement of Sale. A.y other Acti vities. TABLE-B Internal & External Development works in Respect of the entire Registered phase Sr. Common area and Facilities Proposed Percentage of Details No (Yes/No) Actual Work Done (As on date of the Certificate 7 Internal Roads & ths N 0Yo 2 Water Y 0% 3 Sew arage (cham ber lines, Septic 0% Tank Y 4 Storm Water Drains Y 0% 5 & Tree Y 0% 6 Street N 0% 7 Comm N 0% 8 Treatmen t and disposal of Sewage 0% and water N 9 Solid Waste management & 0% N 10 Water Conserva tron / Rain Water 0% Y VV RISHIAPT. GR. FLR.,JUNCTION OFNEHRU RD., & DIXIT RD., VILE - PARLE (E), MUMBAI - 400 057. OIIice No.: 9004998/,47 ASSOCIATES e-mail : vishwas.joshiS0@gmail.com ARCHITECTS, I NT.DESIGNERS REF. DATE //3// 17 t N 0% 72 Fire Protection and Fire safety Y 0% uirements 13 Electrical Meter room/ Sub- Y 0% station, station. 14 Others to Add more Y 0% Yours Faith-fully For V.V. & ASSSOCIATES 0 1') OSHI ( cA/76/3078 Agreed and by, v v I AESOCIATES; ARCiltTtcTs. tNT. oIStOiltF$ RBH| Afl, Ck0ull ;t 8cn Jl{. 0F IfHBLJ R0At}t DmT f*}Ao, MUMBAI vH-E pAsLE ([), Mr]i$B*t - am 057. Nitin Director, of Developers Pvt. Ltd. Date:-30.09.2025