ARCH RITESH H THAKUR B-1, Ganga Vihar Apt, V.N. Purav Marg, Near Trimurti Society, Sion (Chunabhatti), Mumbai-400022. Date: 12/02/2025 To, M/s Shree Dham Developer, 1201, Universal Majestic, 12th floor Opp- RBK International School, off. Ghatkopar – Mankhurd Link Road, Chembur, Mumbai, 400043. Subject: Certificate of Percentage of Completion of Construction Work of 90 NIRVAANA situated on the Plot bearing C.N. No/CTS No. /Survey no. / Final Plot no. 186(pt) demarcated by its boundaries 19°08'92.1" to the 72°91'60.9" the East of Division Kokan, village Ghatkopar, taluka Kurla, District Mumbai Suburban PIN 400075 measuring 806.17 sq.mts. area being developed by M/s Shree Dham Developers, for period up to December 31st, 2024. Sir, I, Ar. Ritesh Thakur have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the ‘90 Nirvaana’ situated on the plot bearing C.N. No/CTS No. /Survey no. / Final Plot no 186(pt) Division Kokan, village Ghatkopar, taluka Kurla, District Mumbai Suburban PIN 400075 measuring 806.17 sq.mts. area being developed by M/s Shree Dham Developers. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800052215 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table TABLE - A Building - 90 NIRVAANA Sr.No Tasks /Activity Percentage of work done 1. Excavation 95 % 2 1 number of Basement(s) and Plinth 100 % 3 Number of Podiums NA 4 1Stilt Floor 40 % 5 17 number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings withinFlats/ 0 Premises, Doors and Windows to each of the Flat/ Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 5% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster,elevation, 0 completion of terraces with waterproofing of the Building/ Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC,Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. TABLE – B Building - 90 NIRVAANA Internal & External Development Works in Respect ofthe entire Registered Phase Sr. Common areas and Proposed Percentage Details No Facilities, Amenities (Yes/No) of Work done 1. Internal Roads & Footpaths No 0 NA 2. Water Supply Yes 0 As per norms 3. Sewerage (chamber, lines, Yes 0 0 Septic Tank , STP) 4. Storm Water Drains Yes 0 0 5. Landscaping & Tree Planting No 0 NA 6. Street Lighting No 0 NA 7. Community Buildings No 0 NA 8. Treatment and disposal of sewage No 0 NA and selvage water 9. Solid Waste management & Disposal No 0 NA 10. Water conservation, Rain Yes 0 As per water harvesting norms 11. Energy management No 0 NA 12. Fire protection and fire Yes 0 As per safety requirements norms 13. Others (Option to Add more) No 0 NA Yours Faithfully, Ritesh Digitally by Ritesh signed Hemant Hemant Date: Thakur Thakur 2025.02.13 15:43:08 +05'30' Ar. Ritesh H Thakur Agreed and Accepted By: Vardhman Digitally signed by Vardhman Ganpatlal Ganpatlal Singhvi Date: 2025.02.14 Singhvi 12:52:06 +05'30' Name : M/s Shree Dham Developers Date :