Annexure A ARCHITECT'S CERTIFICATE Date: 24 – 08 – 2024 To, M/s. Shri Neelkanth Developers and Builders, 104, 1st Floor, Navkar Atlantis, Road No. 03, Daulat Nagar, Borivali (East), Mumbai – 400 066. Subject: Certificate of Percentage of Completion of Construction Work of Proposed Joint Redevelopment of Society known as Kasturpark Mahavir CHSL on Plot No.18 and Society Known as Shimpoli Gurukripa CHSL on Plot No.19, Located at old FP No.324 and New FP No.275 of TPS III at Borivali Kasturpark Shimpoli road, Borivali (W), Mumbai-92. 1334 Sq. Mt. area being developed by Shri Neelkanth Developers and Builders. Sir, I /we have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of Mahavir Krupa. to be registered with MahaRERA, being developed by Shri Neelkanth Developers and Builders. Based on Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project to be registered under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Percentage Sr. Tasks / Activity of Work No. done 1 Excavation 100.00% 2 One Nos. Plinth 100.00% 3 Stilt Floor 100.00% 4 Slabs of Super Structure 30.00% Internal walls, Internal Plaster, Floorings 5 within Flats, Doors and Windows to each of 00.00% the Flat Sanitary Fittings within the Flat, Electrical 6 00.00% Fittings within the Flat Staircases, Lifts Wells and lobbies at each 7 Floor level connecting Staircases and Lifts, 00.00% Overhead and Underground Water Tanks The external plumbing and external plaster, 8 elevation, completion of terraces with 00.00% waterproofing of the building 9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/ CRZ NOC, 00.00% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to Obtain Occupation/ Completion Certificate Yours Faithfully, PRATIK RAJESH Digitally signed by PRATIK RAJESH BHAVE BHAVE Date: 2024.08.29 12:14:57 +05'30' Ar. Pratik R. Bhave (License No. CA/2012/54818) Table B Internal & External Development Works in Respect of the Entire Registered Phase Percentage Sr. Common areas and Proposed of Work Details No. Facilities, Amenities (Yes/No) Done Internal Roads & 1. No - NA Footpaths 2. Water Supply YES 00.00% As per MCGM Norms Sewerage (chamber, As per MCGM Norms 3. Yes 00.00% lines, septic tank, STP) (if applicable) 4. Storm Water Drains Yes 00.00% As per MCGM Norms As per Garden Landscaping & Tree 5. Yes 00.00% authority Norms (if Planting applicable) 6. Street Lighting No - NA 7. Community Buildings No - NA Treatment and disposal 8. of sewage and sullage No - NA water 9. Solid Waste As per MCGM Norms YES 00.00% management & Disposal (if applicable) 10. Water conservation, No - NA Rain water harvesting 11. Energy management No - NA 12. Fire protection and fire As per Chief Fire Yes 00.00% safety requirements Officer Norms 13. Electrical meter room, Yes As per Adani sub-station, receiving 00.00% Electricity Mumbai station Norms 14. Others (Option to Add No - NA more) Yours Faithfully, PRATIK RAJESH Digitally signed by PRATIK RAJESH BHAVE BHAVE Date: 2024.08.29 12:15:14 +05'30' Ar. Pratik R. Bhave (License No. CA/2012/54818)