trtrNtrRETE ENGINEERS/PREJECT MANAGEMENT trENtrEPTS trONSULTANTS 233, NEw lsLAMpuRA, BARI CoMPouND, BHrwANDr, DrsrRteT THANE - 4213Cl2. E-MAr Lr concreteconcepts@rediffmail.com Job No.467 Date: 16 June 2026 Annexure - C FORM-2A [see MahaRERA order no.S of 2O1Bj ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (Certificate No.6 (Certificate No.5 for year ending the year for the ending 2025-2026) 2024-2025) To, M/s. Landmark Heights Pvt. Ltd. Shop No.6, B-17, SaiVaishaliCHS. Ltd., Vaishali Nagar, Jogeshwari (W), Mumbai -400102 Subject: Certificate of Approximate of Completion of Construction work of of Project [Maha RERA Registration Number P51800024289 situated on the Plot bearing C.T.S. No. 169,169/1 to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai- 400060 and demarcated by its boundaries by 13.00 mt. Road to the North, C.T.S. No. 166 to the South, C.T.S. No. 168 to the East & C.T.S. No. 170 & 171 to the West of Village Majas, taluka Andheri, District Mumbai PIN - 400 060 admeasuring2490.49 sq. mts. Area being developed by M/s. Landmark Heights Private Limited. I, the undersigned FAZAL M. MOMIN, site licensed supervisor of above project request you for a Architect Certifrcate. The work completed on site is as below, Table A Percentage work done Sr. No Tasks /Activity 1 Excavation 100% 2 Zero number of Basement(s) and One number of plintkr_ ___+av6 J NIL Number of Podiums N.A. 4 Stilt Floor N.A 5 5 numbers of Slabs of Super Structure 20% 6 Internal walls, Internal Plaster within flats/premises, 7.00o/o Doors and Windows to each of the Flat/premises 7 Sani tary Fittings within the Flat/premises, Electrical Fittings within the Flat/ Premises 0.00 % Staircases, Lifts Wells and Lobbies at each Floor level connectt Staircase and Lifts, Overhead and Underground Water Tanks 8 6.00% External plumbing and external plaster, Elevation, Completior terraces with waterproohng of the Building 9 0.00% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical httings to Common Arr electro, mechanical equipment, compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plint protection, paving of a-reas appurtenant to the Building, 10 Compound Wall and all other requirements as may be requirer 0.00 o/o Obtain Occupation /Completion Certificate. TABLE-B Intemal & External Development Works in Respect of the en Registered Phase Percentage o Sr. Nc Common areas Proposed Work done (Yes/No) Details and Facilities, Amenities 1 Internal Roads & Footpaths No ov. NA 2 Water Supply Yes ov. Sewarage 3 Yes OYo (chamber lines, Septic Tank , sTP) 4 Storm Water Drains Yes Oo/o 5 Landscaping & Tree Planting Yes ov" 6 Street Lighting No Oo/o NA Community Buildings No o% NA Treatment and disposal of 8. sewage No Oo/" NA Solid Waste management & 9 Yes ook Disposal Water conservation, Rain wal 10. Yes ooh harvesting 11. Enerry management No ooh NA Fire protection and fire safetl 72. Yes OYo requirements Electrical meter room, sub- Yes ov. station, receiving station t4 Others (Option to Add more) No Thanking You Yours Faithfully, For, CONCRETE CONCEPTS Fazal Digil.lly ligned by Faz.t Mushtaque Momin 12:3353+05'30' FAZAL M. MOMIN Licence No. M/388/SS-II Fqr Lendmark Helghte pvt. Ltd JL(..{ -= orsct*/