tr E NG ENGINEERS/PROJEtrT RETE MANAGEMENT trEN EPTEi trDNSULTANTS 233, NEw I E-MAr L: concreteconcepts@rediffmail.com Job No.467 Date: 16 June 2026 Annexure - C FORM-2A [see MahaRERA order no.S of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (Certificate No. 3 for the year ending 2022-2029) To, M/s. Landmark Heights Pvt. Ltd. Shop No.6, B-17, SaiVaishaliCHS. Ltd., Vaishali Nagar, Jogeshwari (W), Mumbai -400102 Subject: Certificate of Approximate of Completion of Construction work of of Project [Maha RERA Registration Number P51800024289 situated on the Plot bearing C.T.S. No. 169,169/1 to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai- 400060 and demarcated by its boundaries by 13.00 mt. Road to the North, c.T.s. No. 166 to the south, c.T.s. No. 168 to the East & c.T.s. No. 1 70 & 121 to the West of Village Majas, taluka Andheri, District Mumbai PIN 4OO 060 - admeasuring2490.49 sq. mts. Area being developed by M/s. Landmark Heights Private Limited. I, the undersigned FAZAL M. MOMIN, site licensed supervisor of above project request you for a Architect Certificate. The work completed on site is as below, Table A Percentage work done Sr. No Tasks /Activity 1 Excavation 100% 2 Zero number of Basement(s) and One number of plinth- 100% 3 NIL Number of Podiums N.A. 4 Stilt Floor N,A. 5 5 numbers of Slabs of Super Structure 20 o/o 6 Internal walls, Internal plaster within flats/premises, Doors and Windows to each of the Flat/premises 7.00% 7 Sani tary Fittings within the Flat/ Premises, Electrical Fi ttings within the Flat Premises 0.00 % I o Staircases, Lifts Wells and Lobbies at each Floor level connect: Staircase and Lifts, Overhead and Underground Water Tanks 6.00% 8 Extemal plumbing and external plaster, Elevation, Completior terraces with waterproofing of the Building 0 00% 9 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical flttings to Common Ard electro, mechanical equipment, compliance to conditions of environment/CRz NOC, Finishing to entrance lobby/s, plint protection, paving of areas appurtenant to the Building, 10 Compound Wall and al1 other requirements as may be requiret 0.00 % Obtain Occupation /Completion Certihcate. TABLE B Internal & External Development Works in Respect of the entire Registered Phase Percentage of Sr. No Common areas Proposed Work done Details and Facilities, Amenities (Yes/No) 1 Internal Roads & FootPaths No ov" NA 2 Water Supply Yes Oo/o Sewarage Yes Oo/o [chamber lines, Septic Tank , S 4 Storm Water Drains Yes O%o 5 Landscaping & Tree Planting Yes Oo/o 6 Street Lighting No OYo NA 7 Community Buildings No Oo/o NA Treatment and disPosal of sew No ooh NA 8 and sullage water Solid Waste management & 9 Yes OYo Disposal Water conservation, Rain water 10 Yes OVo harvesting No Oo/o NA 11 Enerry management Fire protection and fire safety Yes Oo/o 12. requirements Electrical meter room, su b- Yes OYo 13 station, receiving station ?o l4 Others (Option to Add more) No ) + .C Thanking You Yours Faithfully, For, CONCRETE CONCEPTS Digitally signed by Fazal Fazal Momin Momin l6 1 2:1 6:36 +05'30' FAZAL M. MOMIN Licence No. M/388/ SS-II For Llnrtmark Hetghts pvr. Ltd uD/L-t^tl;-^b1- Dtrec$