tr E NtrRETE ENGINEERS/PROJEtrT MANAGEMENT trENtrEPTEi trONSULTANTS 233, NEw lsLAMpuRA, BAR| EoMpouND, BHrwANor, DtsrRrcr THANE - 4213fl2 E-MAr L: concreteconcepts@rediffmail.com Job No.467 Date: 16 June 2026 Annexure - C FORM-2A [see MahaRERA order no.S of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (Certificate No. 2 for the year ending 2021-2022) To, M/s. Landmark Heights Pvt. Ltd. Shop No.6, B-17, SaiVaishali CHS. Ltd., Vaishali Nagar, Jogeshwari (W), Mumbai -400102 Subject: Certificate of Approximate of Completion of Construction work of of Project [Maha RERA Registration Number P51800024289 situated on the Plot bearing C.T.S. No. 169,169/1 to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai- 400060 and demarcated by its boundaries by 13.00 mt. Road tothe North, C.T.S. No. 166tothe South, C.T.S. No. 168 to the East & C.T.S. No. 170 & 171 to the West of Village Majas, taluka Andheri, District Mumbai PIN -400 060 admeasuring 2490.49 sq. mts. Area being developed by M/s. Landmark Heights Private Limited. I, the undersigned FAZAL M. MOMIN, site licensed supervisor of above project request you for a Architect Certificate. The work completed on site is as below, Table A Percentage ol work done Sr. No Tasks /Activity 1 Excavation 100% 2 Zero number of Basement(s) and One number of Plinth' 10004 3 NIL Number of Podiums N.A 4 Stilt Floor N.A 5 5 numbers of Slabs of Super Structure 20 o/o -- 6 Internal walls, Internal Plaster within flats/Premises, Flooring 7.00% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0.00 % Staircases, Lifts wells and Lobbies at each Floor level connect. Staircase and Lifts, Overhead and Underground Water Tanks 8 6.00% z^,. t External plumbing and external plaster, Elevation, Completior terraces with waterprooling of the Building 9 0.00% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Are electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plint protection, paving of areas appurtenant to the Building, 10 Compound Wall and all other requirements as may be require< 0,00 o/o Obtain Occupation / Completion Certificate. TABLE-B Intern4l & Externa-l Development Works in Respect of the entire Re stered Phase Percentage of Sr. No Common areas Proposed Work done and Facilities, Amenities (Yes/ No) Details 1 Internal Roads & Footpaths No Oo/" NA 2 Water Supply Yes ov" Sewarage Yes Oo/o (chamber lines, Septic Tank , S 4 Storm Water Drains Yes OYo 5 Landscaping & Tree Planting Yes 0,,/o 6 Street Lighting No ov" NA 7 CommunitSr Buildings No Oo/o NA Treatment and disposal of sewz 8 No OYo NA and sullage water Solid Waste management & 9 Yes Oo/" Disposal Water conservation, Rain water 10. Yes OYo harvesting 11. Enerry management No Oo/" NA Fire protection and fire safety t2. reeuirements Yes ooh Electrical meter room, sub- 13. Yes Oo/o station, receiving station t4. Others (Option to Add more) No 2 o t : (I z o !l JH a Thanking You i Yours Faithfully, For, CONGRETE CONGEPTS DiqitallY signed by Fazal Fazal Mushtaqu€ m,lsntaque uomin MOmin Date:2026.06.16 l2:'l 5:46 +05'30' FA.ZAL M. MOMIN ------ Licence No. M/388/SS-II For Landmark Helghts Pvt. Ltd 3 ____ I 4