REN N EPT ENGINEERS/PRO]ECT MANAGEMENT CONSULTANTS 233, New Islampura, Bari Compound, Bhiwandi, District Thane - 421,302. E-mai I : concreteconcepts@rediffmail.com Job No.467 Date: 16 June 2026 Annexure - C FORM.2A [see MahaRERA order no.5 of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certifi cate) (Certificate No. 01 for the year ending 2020-2021) To, M/s. Landmark Heights Pvt. Ltd. Shop No.6, B-17, Sai Vaishali CHS. Ltd., Vaishali Nagar, Jogeshwari (V9, Mumbai -4OO1O2 Subject: Certificate of Approximate of Completion of Construction work of of Project [Maha RERA Registration Number P51800024289 situated on the Plot bearing C.T.S. No. 169,169/1 to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai - 400060 and demarcated by its boundaries by 13.00 mt. Road to the North, C.T.S. No. 1q6 to the South, C.T.S. No. 168 to the East & C.T.S. No. 170 & 171 to the West of Village Majas, taluka Andheri, District Mumbai PIN -400 060 admeasuring 2490.49 sq. mts. Area being developed by M/s. Landmark Heights Private Limited. I, the undersigned FAZAL M. MOMIN, site licensed supervisor of above project request you for a Architect Certificate. The work completed on site is as below, Table A Percentage work done Sr. No Tasks /Activity 1 Excavation 100% 2 Zero number of Basement(s) and One number of Plinth' 700% 3 NIL Number of Podiums N.A. 4 Stilt Floor N.A. 5 5 numbers of Slabs of Super Structure 20% 6 Internal walls, Internal Plaster within flats/Premises, Flooring 7.00% Doors and Windows to each of the Flat/premises 7 Sanitary Fi ttings within the Flat/Premises, Electrical Fittings within the Flat Premises 0.00 % 1 6.O0% Staircases, Lifts Wells and Lobbies at each Floor level conne I Staircase and Lifts, Overhead and Underground Water Talks External plumbing and externa-I plaster, Elevation, Completion terraces with waterproofing of the Building 9 0.oo% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical littings to Common Are electro, mechanica-l equipment, complialce to conditions of environment/ CRZ NOC, Finishing to entrance lobby/s, plint protection, paving of areas appurtenant to the Building, 10 Compound Wall and all other requirements as may be require 0.00 % Obtain Occupation / Completion Certificate. TABLE-B Internal & External Development Works in Respect of the entire Reqistered Phase Percentage of Sr. No Common areas Proposed Work done Detai'ls and Facilities, Amenities (Yes/No) 1 Internal Roads & Footpaths No o% NA 2 Water Supply Yes OYo Sewarage Yes OYo (chamber lines, Septic Tank , S 4 Storm Water Drains Yes ook 5. Landscaping & Tree Planting Yes o% 6 Street Lighting No Oo/o NA 7 Community Buildings No o% NA Treatment and disposal of sewa 8 No OYo NA and sullage water Solid Waste management & 9 Yes Oo/o Disposal Water conservation, Rain water 10. Yes o% harvesting 11. Enerry management No Oo/o NA Fire protection and lire safetY t2. Yes Oo/o requirements + 2 o ,- o 3 o, "! o H c e \\ Electrical meter room, sub- 13. Yes O'Yo station, receiving station t4. Others (Option to Add more) No + For Landmark L' o l3 t\ Thanking You Yours Faithfully, For, CONCRETE CONCEPTS Fazal Mushtaque *,h.0*'*-. Momin orh2m(0(r6 I t12610l +05'lO FAZAL M. MOMIN Licence No. M/388/SS-II 4