PRIYANK BHATT AR.GHITEGTS I FORM I ARCHITECT'S CERTIF'ICATE Date: - 3l/05/2026 To M/ s. Landmark Heights Private Limited Shop No. 06, Said Vaishali CHSL, Vaishali Nagar, Jogeshwari West, Mumbai-400 102. Subject: Certificate of Percentage of Completion of construction work of Building 8.f nroject [Maha RERA Registration nuniber-P51800024289] situated on the Plot bearing C.T.S. No. 169,169/ 1 to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai- 400060 and demarcated by its boundaries by 13.00 mt. Road to the North, C.T.S. No. 166 to the South, C.T.S. No. 168 to the East & C.T.S. No. l70 & 17l to the West of Village Majas, taluka Andheri, District Mumbai PIN - 400 060 admeasuring2490.49 sq. mts. Area being developed by M/ s. Landmark Heights Private Limited. Sir, I Mr. Priyank Bhatt have undertaken assignment as Architect of certifoing Percentage of Completion of Construction Work of the ,Vraj Bhumi Heights" of the Project, situated on the plot bearing C.T.S. No. 169,169/ I to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai - 400060 admeasuring 2490.49 sq. mts. Area being developec;I by [M/s. Landmark Heights'Private Limited] 1. Following Technical Professionals are appointed by the promoter: - (i) MT. PRIYANK BHATT Architect (ii) MT. FURKHAN PETTIWALA Structural Consultant (iii) Mr. FAZAL M. MOMIN Site Supervisor Based on Site Inspection, with respect to the building of the aforesaid Real Estate Project, I certiSr that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project to be registered number P5180002 42gg under MahaRERA is as per- table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. I pbO10416@gmait.com 2O2lA- Shiv Prisha CHSL, Junction of Gulmohar +91-22-26255400 Road priyangTS@gmail.com & Juhu Lane, JVpD Scheme, Vile parle (W), Mumbai_400049. PRIYANK BHATT AFTGHITECTS I Table A Sr. No Tasks /Activity Percentage of work done (As of 30.06.2023) I Excavation lOOo/o 2 Zero number of Basement(s) and One number of Plinth' 100o/o 3 NIL Number of Podiums N.A. 4 Stilt Floor N.A. 5 Nine numbers of Slabs of Super Structure 160/o Internal walls, Internal Plaster within flats/ Premises, 6 Floorings, Doors and Windows to each of the Flat/Premises o% 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings o% within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 8 connecting Staircase and Lifts, Overhead and Underground 0o/o Water Tanks External plumbing and external_ plaster, Elevation, I Completion of terraces with waterproofing of the 0o/o building Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to 10 conditions of environment/CRz NOC, Finishing to entrance lobby/ s, plinth protection, paving of areas appurtenant to the 0o/o Building, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. t{ E 't < * o For Landmark He lghts Lrd 'CIJ^u^ 2 pbO10416@9mait.com 2O2lA- Shiv prisha CHSL, Junction +91-22-26255400 of Gulmohar Road priyangTS@gmail.com & Juhu Lane, JVpD Scheme, Vile parte (W), Mumbai_400049. PRIYANK BHATT TABLE.B AFT.GHITEGTS I fnternal & External Develonment Works in Resnect of the entire Resistered phase Sr. Common areas Proposed Percentage Details No and Facilities, Amenities (Yes/No) of Work done (As of 31.o3.2022) 1 Internal Roads & Footpaths No 0% NA 2. Water Supply Yes 0? J Sewarage (chamber lines, Septic Tank, STP) Yes 0% 4. Storm Water Drains Yes .tlt 5 Landscaping & Tree Planting Yes 0? 6 Street Lighting No 0? NA 7 Community Buildings No 0% NA 8 Treatment and disposal of sewage No NA and sullage water 0z 9 Solid Waste management & Yes 0% Disposal 10. Water conservation, Rain water Yes 0% harvesting ll Energy management No 0% NA 12. Fire protection and fire safety Yes requirements 0? 13. Electrical meter room, Yes sub-station, receiving station 0? t4. Others (Option to Add more) No The above Certificate is issued as per the approved concessions / plans for building under reference as per DCPR 2034 & is correct to the best of my knowledge as per the details provided by our client. Thanking You. + Yours Faithfully, ,-' o ,D o Forlandmark Helghts pvt. L td Ar. ank Bha tt (Lie.No. CA/2003/3 e23) 3 pbO10416@9mait.com +e1-22-262ss4oo 2021A- Shiv prisha CHSL, Junction LI priyangTS@gmail.com of Gulmohar Road & Juhu Lane, JVpD Scheme, Vite parle (W), Mumbai_400049.