PRIYANK BHATT AFTCHITEG-TS FORM I ARCHITECT'S CERTIFICATE Date: - 3l/05/2026 To M/ s. Landmark Heights Private Limited Shop No. 06, Said Vaishali CHSL, Vaishali Nagar, Jogeshwari West, Mumbai-4O0 102. Subject: Certificate of Percentage of Completion of construction work of Building Q.,f nroiect [Maha RERA Resistration nuniber-P518000242891 situated on the Plot bearing C.T.S. No. 169,169/ I to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai- 400060 and demarcated by its boundaries by 13.00 mt. Road to the North, C.T.S. No. 166 to the South, C.T.S. No. 168 to the East & C.T.S. No. l70 & 17l to the West of Village Majas, taluka Andheri, District Mumbai PIN - 400 060 admeasuring249O.49 sq. mts. Area being developed by iW s. Landmark Heights Private Limited. Sir, I Mr. Priyank Bhatt have undertaken assignment as Architect of certifoing Percentage of Completion of Construction Work of the "Vraj Bhumi Heights" of the Project, situated on the plot bearing C.T.S. No. 169,169/ | to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai - 400060 admeasuring 2490.49 sq. mts. Area being developec;I by [IWs. Landmark Heights'Private Limited] l. Following Technical Professionals are appointed by the Promoter: - (D MT. PRIYANK BHATT Architect (iD MT. FURKHAN PETTIWALA Structural Consultant (iii) Mr. FAZAL M. MOMIN Site Supervisor Based on Site Inspection, with respect to the building of the aforesaid Real Estate Project, I certiff that as on the date of this certificate, the Percentage of Work the building of the Real Estate Project to be registered num 289 under MahaRERA is as per. table A herein below- The percen of the work executed with respect to each of the activity of the entire phase is detailed in Table B. :r t 'r'l pbO10416@gmail.com 2021A- Shiv Prisha CHSL, Junction of Gulmohar Road +91-22-26255400 priyangTS@gmail.com & Juhu Lane, JVPD Scheme, Vile Parle (W), Mumbai-400049. PRIYANK BHATT ARCHI-TEGTS Table A Sr. No Tasks /Activity Percentage of work done (As of 30.O9.2022) 1 Excavation 100% 2 Zero number of Basement(s) and One number of Plinth' 100% 3 NIL Number of Podiums N.A. 4 Stilt Floor N.A. 5 Four numbers of Slabs of Super Structure 8% lntemal walls, Internal Plaster within flats/Premises, 6 Floorings, Doors and Windows to each of the Flat/Premises 0o/o 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings jYo within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level B connecting Staircase and Lifts, Overhead and Underground 0% Water Tanks External plumbing and external_ plaster, Elevation, 9 Completion of terraces with waterproofing of the 0% building Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRz NOC, Finishing to entrance 10 0o/o lobby/ s, plinth protection, paving of areas appurtenant to the Building, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. GH .o L 3 ,- ,e ------- I 2 pbO10416@gmail.com 2O2lA- Shiv Prisha CHSL, Junction of Gulmohar Road +91-22-26255400 priyangTS@gmail.com & Juhu Lane, JVPD Scheme, Vile Parle (W), Mumbai-400049. PRIYANK BHATT TABLE-B A]