PRIYANK BHATT AR.CHITEGTS FORM 1 ARCHITECT'S CERTIFICATE Date: - 3L/05/2026 To M/ s. Landmark Heights Private Limited Shop No. 06, Said Vaishali CHSL, Vaishali Nagar, Jogeshwari West, Mumbai-400 102. Subject: Certificate of Percentage of Completion of construction work of Building Qf proiect [Maha RERA Resistration nuniber-P5l8000242891 situated on the Plot bearing C.T.S. No. 169,169/ 1 to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai- 400060 and demarcated by its boundaries by 13.00 mt. Road to the North, C.T.S. No. 166 to the South, C.T.S. No. 168 to the East & C.T.S. No. 170 & 17l to the West of Village Majas, taluka Andheri, District Mumbai PIN - 400 060 admeasuring249O.49 sq. mts. Area being developed by M/ s. Landmark Heights Private Limited. Sir, I Mr. Priyank Bhatt have undertaken assignment as Architect of certifuing Percentage of Completion of Construction Work of the "Vraj Bhumi Heights" of the Project, situated on the plot bearing C.T.S. No. 169,169/ 1 to 4 of Village Majas, R.R. Thakur Road, Jogeshwari (E), Mumbai - 400060 admeasuring 2490.49 sq. mts. Area being developec;I by [M/s. Landmark Heights'Private Limited] 1. Following Technical Professionals are appointed by the Promoter: - (i) MT. PRIYANK BHATT Architect (iD MT. FURKHAN PETTIWALA Structural Consultant (iii) Mr. FAZAL M. MOMIN Site Supervisor Based on Site Inspection, with respect to the building of the aforesaid Real Estate Project, I certiff that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project to be registered number P51800024289 under MahaRERA is as per. table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. I G a t\ pbO10416@9mail.com 2O2lA- Shiv Prisha CHSL, Junction of Gulmohar Road +91-22-26255400 priyangTS@gmail.com & Juhu Lane, JVPD Scheme, Vile Parle (W), Mumbai-400049. PRIYANK BHATT AR.GHTTEGTS I Table A Sr. No Tasks /Activity Percentage of work done (As of 31.o3.2O2O) I Excavation 2Oo/o 2 Zero number of Basement(s) and One number of Plinth' o% 3 NIL Number of Podiums N.A. 4 Stilt Floor N.A, 5 Zero numbers of Slabs of Super Structure 0% Internal walls, Internal Plaster within flats/Premises, o Floorings, Doors and Windows to each of the Flat/Premises 0% 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 0o/o within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level B connecting Staircase and Lifts, Overhead and Underground 0% Water Tanks External plumbing and external_ plaster, Elevation, 9 Completion of terraces with waterproofing of the 0% building lnstallation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance l0 lobby/ s, plinth protection, paving of areas appurtenant to the 0% Building, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. N\ AR t( I * t'!. 2 pbO10416@gmail.com 2O2lA- Shiv Prisha CHSL, Junction of Gulmohar Road +91-22-26255400 priyangTS@gmail.com & Juhu Lane, JVPD Scheme, Vile Parle (W), Mumbai-400049. PRIYANK BHATT TABLE-B AFRGHITEGTS Sr. Common areas Proposed Percentage Details No and Facilities, Amenities (Yes/No) of Work done (As of 30.06.2020) 1 Internal Roads & Footpaths No 0? NA 2. Water Supply Yes 0u J Sewarage (chamber lines, Septic Tank, STP) Yes 0t .tr{ 4. Storm Water Drains Yes U5 5 Landscaping & Tree Planting Yes i9 6. Street Lighting No 0% NA 7 Buildings No 08 NA 8. Treatment and disposal of sewage No NA 0u and sullage water 9 Solid Waste management & Yes 0% Disposal 10. Water conservation, Rain water Yes 0a harvesting ll Energy management No OE NA 12. Fire protection and fire safety Yes 03 requirements 13. Electrical meter room, Yes 0% sub-station, receiving station 14. Others (Option to Add more) No The above Certificate is issued as per the approved concessions / plans for building under reference as per DCPR 2034 & is correct to the best of my knowledge as per the details provided by our client. Thanking You. For Landmark Helghts Rrt. td Yours Faithfully, (n > ,0-l- * Ar. ank Bha tt (Lie.No. CA/2003/3 923) 3 pbO10416@9mail.com 2021A- Shiv Prisha CHSL, Junction of Gulmohar Road +91-22-26255400 LI priyangTS@gmait.com & Juhu Lane, JVPD Scheme, Vile parle (W), Mumbai_400049.