18.95 18.95 (P-15503/2023) /K/E Ward/FP/337/1/New 1/2 0.90 4.90 2.05 3.25 2.05 4.90 0.90 0.90 4.90 2.05 3.25 2.05 4.90 0.90 THIS PLAN IS DIGITALLY SIGNED AND ISSUED C C HENCE NO PHYSICAL SIGNATURE IS REQUIRED B B 0.90 Mt. Wide Chajja 1.15 Mt. Wide Chajja 53 THIS PLAN IS APPROVED SUBJECT TO CONDITIONS MENTIONED IN APPROVAL 55 LETTER OF THIS OFFICE (P-15503/2023) /K/E Ward/FP/337/1/New DATED 54 KITCHEN Service Slab 1.80 x 2.30 PLAN FOR APPROVAL Service Slab BED 1.20 Mt. Wide Chajja W.R. BED 4.60 x 3.05 Void 1.20 Mt. Wide Chajja W.R. Void 2.70 x 3.30 TPS VILE STACK PARKING 1/2/3/4/5 STACK PARKING 18/19/20/21/22 56 PARLE- II 1 PIT & 4 stack 1 PIT & 4 stack TOILET 1.82 x 1.50 TOILET 1.82 x 1.20 1.50 0.25 1.50 1.40 1.50 0.25 1.50 DINING 0.60 1.80 x 2.55 K/E 0.60 0.60 1.20 TOILET 1.05 TOILET 2.00 x 1.35 x 2.10 x 1.35 S.E.(B.P) K/E-S A.E.(B.P) K/E WARD E.E.(B.P) K/E - WARD 0.85 1.50 MUNICIPAL CORPORATION OF GREATER MUMBAI WS 15 1.20 0 .58 1.20 1.20 0.60 0.60 LIFT LIFT LIFT LIFT 0 .72 A 1.72 x 2.10 1.72 x 2.10 A 1.72 x 2.10 1.72 x 2.10 A A 0.7 2 VILE PARLE STACK PARKING STACK PARKING EXISTING MEMBER EXISTING MEMBER 6/7/8 15/16/17 LIVING/KITCHEN LIVING 0.42 2 stack ECC ECC 3 stack ECC ECC UP 4.05 x 3.05 UP 4.00 x 3.05 0. 75 0.3 CONTENTS OF THE SHEET 0 0. 14 rera ca=34.77 sq.mt. rera ca=36.49 sq.mt. 1.80 MT. WIDE PASSAGE 2 1.80 MT. WIDE PASSAGE 4 0.2 7 GROUND FLOOR PLAN,1ST FLOOR PLAN. 0.4 2ND FLOOR PLAN, 3RD FLOOR PLAN , 4TH FLOOR PLAN(Part). 0.45 TERRACE FLOOR PLAN. 4 0. 52 FRD 1 FRD 1 FRD 3 0.45 3Rd Floor 1.40 building Line 0 .64 0.3 8 DESCRIPTION OF PROPOSAL & PROPERTY 3.45 x 1.40 x 1.55 1.70 x DINING KITCHEN KITCHEN DINING DINING KITCHEN PROPOSED REDEVELOPMENT OF SOCIETY BLDG. KNOWN AS TIRMBAK 2.40 x 2.50 2.40 x 2.50 2.10 x 2.50 1.75 x 2.50 2.35 x 2.50 2.50 x 2.50 2.65 0 .33 SADAN CO-OP- SOC., SITUATED AT PLOT BEARING CTS NO 1042, 2.55 EXISTING MEMBER 1.90 EXISTING MEMBER EXISTING MEMBER F.P. NO. 106, TPS-II VILE PARLE, AJMAL ROAD, LIVING 1.10 1.05 1.35 3.35 x 5.05 LIVING 3.35 x 5.05 LIVING 3.35 x 5.05 VILE PARLE (EAST), MUMBAI:- 400057. x rera ca=49.16 sq.mt. 2.15 POWDER rera ca=47.04 sq.mt. rera ca=49.29 sq.mt. 1.10 Society Office ROOM 1.50 1.25 x 3.35 x 3.50 CA = 1.10x 1.05 x 1.05 1.20 x 1.05 FORM I Fitness Center 20.00 SQ.MT. (M.V.) 4.25 x 3.30 proposed =26.09 sq.mt. PARTICULARS BED:-01 BED BED permissible =13.56 sq.mt. 4.40 x 3.30 4.25 x 3.30 3.25 x 3.30 Municipal Garden/Park excess area counted TOILET TOILET TOILET TOILET TOILET A AREA STATEMENT SQ.MT. in fsi =12.53 sq.mt. 1.35 1.20 1.35 1.10 1.10 Dispensary/ 112 x x x x x 110 Health Post 1. AREA OF PLOT ( AS PER P.R. Card ) 501.70 sq.mt. 2.10 2.10 2.10 2.10 2.10 1A. AREA OF PLOT ( AS PER T.P.Remarks ) 486.62 sq.mt. 1.20 Mt. Wide Chajja 1.20 Mt. Wide Chajja 2. DEDUCTIONS FOR Void Void Void Void 0.90 Mt. Wide Chajja 0.90 Mt. Wide Chajja 0.90 Mt. Wide Chajja 0.90 Mt. Wide Chajja (a) ROAD SET BACK AREA ------- Service Slab Service Slab Service Slab Service Slab (b) PROPOSED ROAD ------- 6.05 6.85 6.05 6.05 6.85 6.05 18.95 18.95 N BLOCK PLAN (c) ANY RESERVATION TOTAL [ 2(a)+(b)+(c)] 486.62 sq.mt. C C 1ST FLOOR PLAN B 2ND FLOOR PLAN B 3. BALANCE AREA OF PLOT (1 - 2) SCALE:-1:100 Scale 1:500 Land Bearing F.P.No(s) 106 of TPS VILE PARLE No.II TPS Scheme in K/E Ward (a) 15% RECREATIONAL OPEN SPACE ------- SCALE:-1:100 18.95 0.90 4.90 2.05 3.25 2.05 4.90 0.90 (b) 10% AMENITY SPACE ------- 4. NET PLOT AREA 486.62 sq.mt. C 5. F.S.I. PERMISSIBLE ONE B 0.90 Mt. Wide Chajja 1.15 Mt. Wide Chajja 6. TOTAL AREA (4x5) BASE FSI 486.62 sq.mt. 4Th Floor 7. ADDITIONS FOR F.S.I PURPOSE (REG. 30 TABLE 12- DCPR-2034) ------- building Line (a) FOR SET-BACK (200%) [ DCR 32(1) ] ------- r.c.c. coping KITCHEN (b) FOR D.P. ROAD/ RESERVATION ------- Service Slab 1.80 x 2.30 BED:-03 Service Slab BED (c) OTHER FSI [DCR 33]: 1.20 Mt. Wide Chajja 2.70 x 3.30 AS PER REG. 33(7)(B) INCENTIVE FSI 15% OF EXIST. TENANT REHB. BUA] 4.60 x 3.05 Void W.R. Void EXIST.11 Nos. of Members = 10.00 SQ.MT X 11 Nos. ) 110.00 sq.mt. 9.00 (d) EXTERNAL TDR [REG.32] PERMISSIBLE (0.50) ------- 9.00 MT WIDE RL TOILET TOILET I SLUM TDR (MIN. 20% + MAX. 50%) ( i.e 50 % x 243.31 ) ------- 1.82 x 1.50 1.82 x 1.20 II RESERVATION TDR / ADD.FSI (Min 50% to Max 80%) ------- 1.40 1.50 0.25 1.50 DINING 0.60 0.60 1.20 0.60 1.80 x 2.55 (e) GOVT. FSI ------- TOILET TOILET 2.00 x 1.35 2.10 x 1.35 ground lvl. TOTAL [7] 110.00 sq.mt. 1.30 1.20 LIFT LIFT 0.60 0.60 8. PERMISSIBLE FLOOR AREA [6+7] 596.62 sq.mt. 1.72 x 2.10 1.72 x 2.10 A A 9. TOTAL BUILT UP AREA (EXISTING + PROPOSED) rubble packing p.c.c bed (A) EXISTING BUILT UP AREA ------- EXISTING MEMBER 4Th Floor building Line ------- LIVING (B) PROPOSED BUILT UP AREA BED:-02 section thg. comp. wall ECC ECC UP 4.00 x 3.05 3.30 x 3.05 rera ca=36.49 sq.mt. (a) RESIDENTIAL BUILT UP AREA 502.90 sq.mt. 1.80 MT. WIDE PASSAGE 3 SCALE 1:25 (b) NON - RESIDENTIAL BUILT UP AREA ------- TOTAL BUILT-UP PROPOSED (9) 502.90 sq.mt. 0.45 10. F.S.I. CONSUMED ON NET HOLDING (9/4) 1.03% FRD 1 FRD 2 EXIT GATE B DETAILS OF FUNGIBLE FSI AVAILED AS PER DCR 31(3) gate 1. PERMISSIBLE FUNGIBLE B.U.A. VIDE DCR 3.52 31 (3) FOR PURELY RESIDENTIAL = OR < (502.90 X 0.35 ) 176.02 sq.mt. KITCHEN DINING DINING KITCHEN 2.70 x 2.50 2.05 x 2.50 2.35 x 2.50 2.35 x 2.50 2. FUNGIBLE B.U.A. COMPONENT PROPOSED VIDE DCR 31 (3) FOR PURELY RESIDENTIAL = OR < ( 499.87 X 0.35 ) 174.85 sq.mt. 1.00 EXISTING MEMBER EXISTING MEMBER 1.05 LIVING LIVING ground lvl. 3. FUNGIBLE B.U.A. COMPONENT PROPOSED VIDE DCR 3.35 x 5.05 3.35 x 5.05 31 (3) FOR PURELY NON-RESIDENTIAL = OR < ( 9b X 0.35 ) ------- MIN 3.50 MT WIDE ONE WAY DRIVEWAY 1.50 rera ca=86.08 sq.mt. rera ca=49.29 sq.mt. 1.10 1.25 Chajja line above Chajja line above x 4. TOTAL FUNGIBLE B.U.A. VIDE DCR 31 (3) = ( B.2 + B.3 ) 174.85 sq.mt. x 1.20 x 1.05 1.05 677.75 sq.mt. 5. TOTAL GROSS BUILT -UP AREA PROPOSED ( 9 + B) B 5.35 C Building Line Above u.g. water tank C TENEMENT STATEMENT Building Line Above BED:-01 BED 4.66 4.25 x 3.30 3.25 x 3.30 (I) PROPOSED AREA (ITEM B-4 ABOVE) 677.75 sq.mt. 4.73 TOILET 1.35 TOILET 1.10 TOILET 1.10 SECTION THROUGH U.G. TANK x x x (II) LESS DEDUCTION FOR NON-RESI. AREA (shops etc.) ------- 4.07 2.10 2.10 2.10 SCALE 1:100 Electric (III) AREA AVAILABLE FOR TENEMENTS (i - ii) 677.75 sq.mt. Pump Room Meter 3.83 0.90 Room 1.20 Mt. Wide Chajja 1.75 x1.65 1.35 x1.65 (IV) TENEMENTS PERMISSIBLE ( 450 / HECTOR ) 30.50 0.90 3.76 Void Void (V) TENEMENTS PROPOSED 09.00 STACK PARKING STACK PARKING 0.90 Mt. Wide Chajja 0.90 Mt. Wide Chajja 1/2/3/4/5 21/22/23/24/25 Service Slab 4Th Floor Service Slab 1 PIT & 4 stack servant 1 PIT & 4 stack building Line (VI) TENEMENTS EXISTING toilet 1.07x 6.05 6.85 6.05 TOTAL TENEMENTS ON THE PLOT 1.50 1.50 0.25 1.50 18.95 C D PARKING STATEMENT U.G.Tank 3RD FLOOR PLAN B (I) PARKING REQUIRED BY REGULATIONS FOR 7.45 Nos. SCALE:-1:100 CAR ------- LIFT LIFT 13.30 SCOOTER / MOTOR CYCLE ------- A 1.72 x 2.10 1.72 x 2.10 A 0.90 4.90 2.05 3.25 2.20 OUTSIDERS (VISITORS) ------- C C (II) COVERED GARAGES PERMISSIBLE ------- 3.89 STACK PARKING STACK PARKING 3.94 6/7/8 18/19/20 B CHAJJA BELOW B 1.15 Mt. Wide Chajja CHAJJA BELOW (III) COVERED GARAGES PROVIDED ------- 2 stack UP 3 stack CAR ------- 1.80 MT. WIDE PASSAGE SCOOTER / MOTOR CYCLE ------- 5Th Floor building Line OUTSIDERS (VISITORS) ------- 2.31 (IV) TOTAL PARKING PROVIDED (As per Concession Approved dt. 29.03.2023) 25.00 Nos. 2.88 Service Slab Service Slab OHT Service Slab BED:-03 1.20 Mt. Wide Chajja capacity 25,000 liter 1.20 Mt. Wide Chajja Void D TRANSPORT VEHICLES PARKING ------- 4.60 x 3.05 Void Void Void W.R. W.R. (I) SPACE FOR TRANSPORT VEHICLES PARKING REQUIRED BY REGULATION ------- (II) TOTAL NO.OF TRANSPORT VEHICLES PARKING SPACE PROVIDED ------- TOILET 1.82 x 1.50 STACK PARKING STACK PARKING CERTIFICATE OF AREA 9/10/11 ENTRANCE 15/16/17 1 PIT & 2 stack LOBBY STACK PARKING 1 PIT & 2 stack 1.40 1.50 0.25 1.50 1.50 0.25 1.50 4.45 x 4.70 12/13/14 0.60 1.20 0.60 TOILET CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE ON 1 PIT & 2 stack 2.00 x 1.35 28.02.2023 AND THAT THE DIMENSIONS OF THE SIDES,ETC. OF THE 1.30 1.20 1.80 2.86 LIFT 0.60 0.60 PLOT STATED ON THE PLAN ARE AS MEASURED ON SITE AND THE AREA 2.86 1.80 LIFT A 1.72 x 2.10 1.72 x 2.10 A A LIFT SHAFT LIFT SHAFT A SO WORKED OUT IS OUT IS ON SITE AND THE AREA SO WORKED OUT IS 486.62 SQUARE METRES AND TALLIES WITH THE AREA STATED IN THE 4.66 4.69 DOCUMENT OF OWNERSHIP/TOWN PLANNING SCHEME RECORDS. existing structure BED:-02 ECC ECC to be demolished UP UP 3.30 x 3.05 1.80 MT. WIDE PASSAGE Building Line Above Building Line Above SIGNATURE OF LICENSED ARCHITECT Building Line Above MIN 3.22 MT WIDE ONE WAY DRIVEWAY PART TERRACE OPEN TO SKY @ 4th floor PART TERRACE OPEN TO SKY @ 5th floor PART TERRACE OPEN TO SKY @ 4th floor FRD 1 FRD Chajja line above NAME OF OWNERS Chajja line above Chajja line above 1.20 Mt. 1.20 Mt. Wide Chajja Wide Chajja MR. OMPRAKASH JAKHOTIA SECRETARY OF KITCHEN DINING VILE PARLE TRIMBAK SADAN CO-OP. HOUSING SOCIETY LTD watchman 2.85 x 2.50 2.05 x 2.50 0.90 x1.20 PROVISION FOR FUTURE ROAD WIDENING B PROVISION FOR FUTURE WIDENING NAME ADDRESS OF DEVELOPER NORTH 1.65 5.34 C 6.62 1.00 EXISTING MEMBER 7.05 LIVING MR. OMPRAKASH JAKHOTIA sliding gate W. g a t e sliding gate sliding gate 3.35 x 5.40 rera ca=87.31 sq.mt. ENTRY & EXIT GATE ENTRY & EXIT GATE ENTRY & EXIT GATE 1.50 402, TRIMBAK SADAN CHS x AJMAL ROAD, VILE PARLE (E), 1.05 MUMBAI:- 400057. 6.10 MT. BED:-01 4.25 x 3.30 TOILET JOB NO. DRG. NO. SCALE DATE DRN. BY. AJMAL ROAD 1.35 x 2.10 1.100 10-04-2023 SALIM CHAROLIYA 1.20 Mt. Wide Chajja CHAJJA BELOW CHAJJA BELOW Void Void Void NAME ADDRESS OF ARCHITECT ARCHITECT SIGNATURE 0.90 Mt. Wide Chajja CHAJJA BELOW CHAJJA BELOW Void GROUND FLOOR PLAN Service Slab Service Slab Service Slab SCALE:-1:100 6.05 3.50 3.75 ARCH DIMENSIONS 13.30 TERRACE FLOOR PLAN ARCHITECT (SHOAIB Z. SHAIKH) C SCALE:-1:100 C 4TH FLOOR PLAN(Part) B B G-1, YELLOW - ROSE , 4 , SCALE:-1:100 PALI VILLAGE , BANDRA (W), MUMBAI - 50. P-15503/2023)/K/E Ward/FP/337/1/New 2/2 3.89 FORM-II DCPR 2034 carpet area statement CONTENTS OF THE SHEET 18.95 13.30 1 PARKING AREA STATEMENT floor NO. rera 1ST TO 4TH FLOOR BUILT UP AREA DIAGRAM AND CALCULATION. 0.90 4.90 2.05 5.30 4.90 0.90 0.90 4.90 2.05 3.48 1.97 carpet area PLOT AREA DIAGRAM & CALCULATION. S.E.(B.P) K/E-S A.E.(B.P) K/E WARD E.E.(B.P) K/E - WARD 0.25 10 0.25 9 CARPET AREA PARKING NO OF FLATS PARKING AREA 1st flr 1 49.16 sq.mt. PARKING AREA STATEMENT. NAME OF OWNERS IN SQ.MT. REQUIRED. REQUIRED B.U. AREA SUMMARY. 13 SOCIETY OFFICE AREA CALCULATION. MR. OMPRAKASH JAKHOTIA SECRETARY OF 2.20 2.20 9 8 .3 1 47.04 sq.mt. FITNESS CENTER AREA CALCULATION. 2.50 8 2.50 7 6 UP TO 45.00 0.25/1 03 NOS. x 0.25 0.75 Nos. VILE PARLE TRIMBAK SADAN CO-OP. HOUSING SOCIETY LTD 3.60 1 7 3.60 3.60 1 6 3.85 45.00 to 60.00 0.50/1 04 NOS. x 0.50 2.00 Nos. 2 34.89 sq.mt. DESCRIPTION OF PROPOSAL & PROPERTY NAME ADDRESS OF DEVELOPER NORTH 20.26 2nd flr PROPOSED REDEVELOPMENT OF SOCIETY BLDG. KNOWN AS TIRMBAK 3 BETWEN 60 TO 90 1/1 02 NOS. x 1 2.00 Nos. 3 49.29 sq.mt. MR. OMPRAKASH JAKHOTIA 80 SADAN CO-OP- SOC., SITUATED AT PLOT BEARING CTS NO 1042, 2 0. ABOVE 90 2/1 NIL NIL F.P. NO. 106, TPS-II VILE PARLE, AJMAL ROAD, 402, TRIMBAK SADAN CHS 2.30 1.50 2.30 3 4 36.59 sq.mt. VILE PARLE (EAST), MUMBAI:- 400057. AJMAL ROAD, VILE PARLE (E), TOTAL 4.75 Nos. MUMBAI:- 400057. 1.35 2 1.35 2 1 86.05 sq.mt. 10% VISITORS FOR 3rd flr RESIDENTIAL USER 10% of 4.75 0.48 Nos. 8 2 49.29 sq.mt. 1.00 1.00 .6 MUNICIPAL CORPORATION OF GREATER MUMBAI JOB NO. DRG. NO. SCALE DATE DRN. BY. 15 total 5.23 Nos. 6 4.55 3 36.59 sq.mt. 1.100 10-04-2023 SALIM CHAROLIYA 4.45 say 5.00 Nos. 25.00 Nos. 4th flr 1 87.28 sq.mt. THIS PLAN IS DIGITALLY SIGNED AND ISSUED NAME ADDRESS OF ARCHITECT ARCHITECT SIGNATURE TOTAL PARKING PROVIDED. 14.40 14.40 14.40 14.40 as per concession approved by Hon'ble M.C. HENCE NO PHYSICAL SIGNATURE IS REQUIRED for full FSI consumption dt. 29.03.2022 ARCH DIMENSIONS 5.85 3 5.85 3 (BIG CAR - 06nos + SMALL CAR - 19nos) PLAN FOR APPROVAL ARCHITECT (SHOAIB Z. SHAIKH) 1.05 G-1, YELLOW - ROSE , 4 , PLOT AREA DIAGRAM THIS PLAN IS APPROVED SUBJECT TO CONDITIONS MENTIONED IN APPROVAL PALI VILLAGE , BANDRA (W), 5 2.65 Scale :-1:500 LETTER OF THIS OFFICE (P-15503/2023) /K/E Ward/FP/337/1/New DATED MUMBAI - 50. SOCIETY OFFICE AREA CALCULATION Plot Area Calculation 5 6.10 DJ 0.15 x 0.90 = 0.14 sq.mt Add:- 1) 1.40 x 1.55 = 2.17 sq.mt 1) 0.50 x 3.89 x 20.26 = 39.41 sq.mt 3.60 3.60 3.60 LIFT SHAFT 3.85 2) 3.35 x 3.50 = 11.73 sq.mt 2) 0.50 x 13.36 x 30.80 = 205.74 sq.mt 5.35 3) 1.35 x 2.15 = 2.90 sq.mt 5.35 0.90 4 3) 0.50 x 15.68 x 30.80 = 241.47 sq.mt 0.55 4 6.05 6.85 6.05 6.05 3.50 3.75 DJ 0.75 x 0.15 = 0.11 sq.mt 18.95 13.30 total plot area = 486.62 sq.mt TOILET 1.35 x 2.10 = 2.84 sq.mt BUILT-UP AREA DIAGRAM BUILT-UP AREA DIAGRAM plot area as per P R Card = 501.70 sq.mt part terrace open to sky @ 4th floor part terrace open to sky 1.50 @ 4th floor (3RD FLOOR)SCALE:-1:100 (4TH FLOOR(Part)) SCALE:-1:100 TOTAL = 19.89 sq.mt plot area as T.P.Remarks = 486.62 sq.mt 4th Flr. WELL 582.00 sq.yds. i.e. 0.60 19.65 18.95 Built Up Area Calculation 3.00 3.00 0.90 4.90 2.05 5.30 4.90 0.90 (2Nd Floor) LIFT Built Up Area Calculation 0.25 11 A 18.95 x 14.40 = 272.88 sq.mt 3rd Flr. (3Rd Floor) toilet Passage DINING LIVING 3rd Flr. 0.60 2.20 10 2.50 9 total = 272.88 sq.mt A 18.95 x 14.40 = 272.88 sq.mt 3.60 1 8 3.60 Less:- 272.88 sq.mt 3.00 3.00 total = 1) 0.90 x 3.60 = 3.24 sq.mt Less:- B.U. AREA SUMMARY 17.30 2nd Flr. 2) 2.30 x 1.35 = 3.11 sq.mt 1) 0.90 x 3.60 = 3.24 sq.mt PROPOSED PROPOSED toilet Passage DINING LIVING 2nd Flr. 2.30 1.50 TOTAL 0.60 FLOORS BUILT UP AREA FUNGIBLE AREA BUILT UP AREA 1.35 25 2 3) 1.45 x 3.35 = 4.86 sq.mt 2) 2.30 x 1.35 = 3.11 sq.mt RESIDENTIAL RESIDENTIAL 35% FITNESS CENTER AREA CALCULATION 3.00 1.45 4) 1.90 x 2.50 = 4.75 sq.mt 3) 1.00 x 5.85 = 5.85 sq.mt (A) (C) ( A +C) A TOTAL PROPOSED BUILT UP AREA = 677.75 sq.mt. 3.00 14.30 7 4.55 5) 6.85 x 0.90 = 6.17 sq.mt 4) 6.85 x 0.90 = 6.17 sq.mt GRD FLOOR --- --- --- B PERMISSIBLE FITNESS CENTER AS PER RULE = 13.56 sq.mt. 24 1ST FLOOR 76.80 sq.mt. 26.88 sq.mt. 103.68 sq.mt ( 677.75 sq.mt. x 2 % ) 1st Flr. DINING 14.40 Passage LIVING 1st Flr. 3 6) 1.05 x 2.65 = 2.78 sq.mt 5) 1.05 x 2.65 = 2.78 sq.mt C PERMISSIBLE FITNESS CENTER = 13.56 sq.mt. 14.40 2ND FLOOR 162.16 sq.mt. 56.75 sq.mt. 218.91 sq.mt 3.35 7) 1.50 x 4.55 = 6.83 sq.mt 6) 1.50 x 4.55 = 6.83 sq.mt 3RD FLOOR 164.94 sq.mt. 57.73 sq.mt. 222.67 sq.mt D proposed fitness center on 1ST floor = 26.09 sq.mt. 23 14 1.05 8) 0.90 x 3.60 = 3.24 sq.mt 7) 0.90 x 3.60 = 3.24 sq.mt 4TH FLOOR 99.00 sq.mt. 33.49 sq.mt. 132.49 sq.mt E excess fitness center on 1ST floor = 12.53 sq.mt. 1.90 (26.09sq.mt. -13.56 sq.mt.) TOTAL 502.90 sq.mt. 174.85 sq.mt. 677.75 sq.mt. 5.15 5.15 9) 5.30 x 2.50 = 13.25 sq.mt 8) 5.30 x 2.50 = 13.25 sq.mt 2.50 4 6 2.65 10) 2.05 x 2.20 = 4.51 sq.mt 9) 2.05 x 2.20 = 4.51 sq.mt 22 13 11) 4.90 x 0.25 = 1.23 sq.mt 10) 4.90 x 0.25 = 1.23 sq.mt Gr. Lvl. entrance Gr. Lvl. Total = 53.97 sq.mt lobby Total = 50.21 sq.mt 0.15 0.15 Net B.U.A Of(2nd Floor) 3.60 3.60 (272.88 sq.mt - 53.97 sq.mt) 218.91 sq.mt Net B.U.A Of(3Rd Floor) 222.67 sq.mt SECTION C-C 21 lift pit 12 (272.88 sq.mt - 50.21 sq.mt) SCALE:-1:100 2.25 0.90 5 car pit Built Up Area Calculation 6.05 6.85 6.05 free board 18.95 (1St Floor) 1.20 Built Up Area Calculation 2.20 O H T LIFT SHAFT LIFT SHAFT BUILT-UP AREA DIAGRAM A 18.95 x 14.15 = 268.14 sq.mt [4TH FLOOR(Part)] (2ND FLOOR)SCALE:-1:100 268.14 sq.mt 0.75 3.85 total = A 13.30 x 14.40 = 191.52 sq.mt Chajja 2.35 2.35 5.35 1.50 TERRACE OPEN TO SKY Less:- total = 191.52 sq.mt 0.90 1.20 terrace Flr. TERRACE 3.00 2.55 3.25 2.05 3.50 1.95 5.65 1) 2.55 x 10.55 = 26.90 sq.mt Less:- 0.60 1.50 2) 6.85 x 0.90 = 6.17 sq.mt 1) 0.90 x 3.60 = 3.24 sq.mt TERRACE OPEN TO SKY BED:-02 passage 4THFLR 4th Flr. 3.00 3.00 Chajja 2.25 3) 1.10 x 2.65 = 2.92 sq.mt 2) 2.30 x 1.35 = 3.11 sq.mt 0.60 WELL WELL 6 0.60 0.60 Chajja 3.75 7 3.60 5 4) 5.65 x 7.90 = 44.64 sq.mt 3) 1.00 x 5.85 = 5.85 sq.mt 0.90 1.20 1.20 4th Flr. LIVING 4THFLR Chajja 5) 1.95 x 3.60 = 7.02 sq.mt 4) 3.50 x 0.55 = 1.93 sq.mt 3.00 3.00 0.60 LIFT LIFT 1.20 6) 3.50 x 2.25 = 7.88 sq.mt 5) 3.75 x 6.10 = 22.88 sq.mt 7.90 8 4 7.90 BED:-02 passage 3RD FLR LIVING 3rd Flr. 3.00 3.00 Chajja 0.60 7) 2.05 x 3.75 = 7.69 sq.mt 6) 1.97 x 3.85 = 7.58 sq.mt 0.60 0.60 Chajja 1.20 8) 3.25 x 7.90 = 25.68 sq.mt 0.90 10.55 1 7) 3.48 x 2.50 = 8.70 sq.mt 1.20 3rd Flr. LIVING 3RD FLR 14.30 19.65 Chajja 3.00 3.00 0.60 S-1 1.55 x 1.55 = 2.40 sq.mt 8) 2.05 x 2.20 = 4.51 sq.mt 1.20 17.30 Society S-2 19.65 17.30 19.65 3.35 x 3.80 = 12.73 sq.mt 3.00 3.00 Office 9) 4.90 x 0.25 = 1.23 sq.mt 14.15 14.15 LIVING/KITCHEN 2ND FLR LIVING 2nd Flr. Chajja 0.60 S-3 1.65 x 4.70 = 7.76 sq.mt Total = 59.03 sq.mt 0.90 1.20 1.85 3.45 1.55 1.10 F-1 3.45 x 1.55 = 5.35 sq.mt 2nd Flr. LIVING 2ND FLR Net B.U.A Of[4TH FLOOR(Part)] Chajja 132.49 sq.mt 3.00 3.00 1.55 1.55 0.60 F-1 S-1 (191.52 sq.mt - 59.03 sq.mt) Fitness F-2 1.85 x 2.65 = 4.90 sq.mt 2.65 F-2 3 2.65 Center 8 20 1.20 1.65 3.35 F-3 4.40 x 3.60 = 15.84 sq.mt 1ST FLR 1st Flr. 3.00 3.00 Chajja 0.60 Total = 177.88 sq.mt 1.20 Fitness Society Office Society Office Center 1ST FLR 3.80 2.55 1st Flr. S-2 1St Floor B.U.A 7 19 (A) 91.15 sq.mt 4.70 S-3 (268.14 sq.mt+ 0.89 sq.mt. - 177.88 sq.mt ) Fitness Center 3.60 F-3 3.60 Excess fitness center area counted in fsi (B) 12.53 sq.mt 5.15 2.55 Total B.U.A Of(1St Floor) (A -B) 103.68 sq.mt 0.90 2 5.15 6 18 2.60 4.40 1.65 6.85 6.05 18.95 Gr. Lvl. Gr. Lvl. 2.60 GROUND FLR BUILT-UP AREA DIAGRAM 0.15 0.15 0.85 0.85 (1ST FLOOR) SCALE:-1:100 0.25 0.25 Gr. Lvl. Gr. Lvl. 0.25 0.25 1.00 1.00 under ground water tank LIFT PIT LIFT PIT ENTRANCE LOBBY GROUND FLR Pump Room 0.15 0.15 SECTION B-B SECTION A-A SCALE:-1:100 SCALE:-1:100