Date: 03rd May 2023 FORM 4 ARCHITECT’S CERTIFICATE To, Shri Chirag M Shah, M/s. Disha Construction 201, Square One, Gulmohar Road, Juhu, Mumbai – 400 049. Subject: Certificate of Completion of Full Construction Work of Part Stilt for puzzle parking above Ground Level and Entrance Lobby + 1st to 11th + 12th (pt) upper floors of the project “TULIP” registered under MahaRERA vide Registration No. P51800024339 situated on the Plot bearing CTS No. 196A of Village Juhu Plot No.3/13 of JVPD MHADA Layout at North South Road NO.10, JVPD Scheme, Vile Parle (West). Mumbai demarcated by its boundaries (Latitude & Longitude of its End Points) 72 49 46.20-19 06 49.32, 72 49 46.28-19 06 49.37, 72 49 47.11-19 06 49.24, 72 49 47.10-19 06 48.65 & 72 49 46.18-19 06 48.7 of Kokan Division, Village Vile Parle (West), Taluka Andheri, District Mumbai Suburban, PIN 400049, admeasuring 522.56 sq. mts. area being developed by M/s. Disha Construction. Sir, I, Mr. Ashish R. Solanki have undertaken assignment as Architect / licensed Surveyor of certifying Full Completion of Construction Work of Part Stilt for puzzle parking above Ground Level and Entrance Lobby + 1st to 11th + 12th (pt) upper floors of the project “TULIP” registered under MahaRERA vide Registration No. P51800024339 situated on the Plot bearing CTS No. 196A of Village Juhu Plot No.3/13 of JVPD MHADA Layout at North South Road NO.10, JVPD Scheme, Vile Parle (West). Mumbai demarcated by its boundaries (Latitude & Longitude of its End Points) 72 49 46.20-19 06 49.32, 72 49 46.28-19 06 49.37, 72 49 47.11-19 06 49.24, 72 49 47.10-19 06 48.65 & 72 49 46.18-19 06 48.7 of Kokan Division, Village Vile Parle (West), Taluka Andheri, District Mumbai Suburban, PIN 400049, admeasuring 522.56 sq. mts. area being developed by M/s. Disha Construction. 2. Following technical professionals are appointed by Owner / Promoter:- (i) Mr. Premal K. Gogri as Licensed Surveyor; (ii) Mr. Bhavin M Shah as Structural Consultant (iii) Mr. Hitesh R. Solanki as Site Supervisor 3. Based on Completion Certificate received from Structural Engineer and Site Supervisor; and to the best my/our knowledge I/We hereby certify that “TULIP” has been completed in all aspects and is fit for occupancy for which it has been erected / constructed and enlarged. The “TULIP” building is granted Full Occupancy Certificate (for part Stilt + 1st to 11th + 12th (pt) upper floors) bearing number MH/EE/(BP)/GM/MHADA- 104/238/2023 dated 3rd May 2023 by the Executive Engineer, BP Cell, Greater Mumbai, MHADA. Yours Faithfully For AASHISH SOLANKI a r c h i t e c t s Digitally signed by Ashish Ramniklal Ashish Solanki DN: c=IN, o=Personal, title=6402, pseudonym=fdd5b36b8123605b666 3ba56bda22dc06e7bc0a0153b7fadb Ramnikla b435284aa31985a, postalCode=400057, st=Maharashtra, serialNumber=9db82c5cd99a333ad6 l Solanki 5b652b476ba6df1c16ce7b0f317052 8b2ebe341207558f, cn=Ashish Ramniklal Solanki Date: 2023.05.03 17:42:32 +05'30' Ashish R. Solanki (CA/2000/26252)