Form 1 ARCHITECT'S CERTIFICATE Date: 15th October 2022 To, Shri Chirag M. Shah, Partner of M/s. Disha Construction 201, Square One, Gulmohar Road, Juhu, Mumbai - 400 049. Subject: Certificate of Percentage of Completion of Construction Work of Tulip having MahaRERA registration no. P51800024339, being developed by M/s. Disha Construction, Mumbai. Sir, I, Mr. Ashish R. Solanki, have undertaken assignment as an Architect of certifying Percentage of Completion of Construction Work of Tulip having MahaRERA Registration No. P51800024339being developed by M/s. Disha Construction. Based on Site Inspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wings of the Real Estate Project registered under MahaRERAis as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Sr. No. Tasks / Activity Percentage of work done 1 Excavation 100% 2 Plinth 100% 3 Stilt 90% 4 13 no. out of 13 no.of Slabs of Super Structure 100% 5 Internal walls, internal Plaster, 95% Floorings Doors and Windows within Flat/Premises 6 Sanitary Fittings within the Flat/Premises, 0% 7 Stair cases, Lift Wells and Lobbies at each 90% Floor level Overhead and Underground Water Tanks 8 The external plumbing and external plaster, 90% Elevation, completion of terraces with water Proofing of the Building/ Wing, 9 Installation of lifts, water pumps, Fire Fighting 40% Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required complete project as per specification in agreement of Sale. Any other Activities TABLE B Internal & External Development Works in Respect of the entire project S. Common areas and Proposed Percentage of Details No. Facilities, Amenities ( Yes / No ) work done 1 Internal Roads & Footpaths No NA 2 Water Supply Yes 0% On completion of the building. 3 Sewarage(chamber, Yes 90% Internal Chambers lines,SepticTank,STP) and lines proposed. No STP Proposed. 4 Strom water drains Yes 0% Will be connected to Municipal Storm Water Drain. 5 Landscaping & Tree Yes 0% As per Tree NOC. planting 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of No NA sewage and sewage water 9 Solid waste management & Yes 0% Vermiculture Bin will disposal be provided as per requirement by MCGM. 10 Water conservation, Rain Yes 100% Recharge pit water harvesting proposed as per RWH Consultant’s Remarks. 11 Energy Management No NA 12 Fire Protection and fire Yes 70% As per CFO NOC. safety requirements 13 Electrical meter room, sub Yes 90% As per requirement station by Reliance Energy. 14 Society Office Yes 90% On completion of the building. 15 Fitness Centre Yes 90% On completion of the building. Yours Faithfully, For AASHISH SOLANKI a r c h i t e c t s Ashish Digitally signed by Ashish Ramniklal Solanki DN: c=IN, o=Personal, title=6402, pseudonym=fdd5b36b8123605b6663 Ramnikla ba56bda22dc06e7bc0a0153b7fadbb4 35284aa31985a, postalCode=400057, st=Maharashtra, serialNumber=9db82c5cd99a333ad65 l Solanki b652b476ba6df1c16ce7b0f3170528b 2ebe341207558f, cn=Ashish Ramniklal Solanki Date: 2022.10.18 11:44:20 +05'30' Ashish R. Solanki (CA/2000/26252)