Form 1 ARCHITECT'S CERTIFICATE Date: 13th April 2022 To, Shri Chirag M. Shah, Partner of M/s. Disha Construction 201, Square One, Gulmohar Road, Juhu, Mumbai - 400 049. Subject: Certificate of Percentage of Completion of Construction Work of Proposed Redevelopment of Existing Residential Building known as Tulip registered under MahaRERA vide registration no. P51800024339, situated on the Plot bearing C.T.S. No. 196A of Village Juhu, Plot No. 3/13 of JVPD MHADA Layout at North South Road No. 10, JVPD Scheme, Juhu, Vile Parle (West), Mumbai, demarcated by its boundaries (Latitude & Longitude of its End Points) 72 49 46.20-19 06 49.32, 72 49 46.28-19 06 49.37, 72 49 47.11-19 06 49.24, 72 49 47.10-19 06 48.65 & 72 49 46.18-19 06 48.70 of Konkan Division, Village Vile Parle (West), Taluka Andheri, District Mumbai Suburban, PIN 400049, admeasuring 522.56 Sq. Mts. area being developed by M/s. Disha Construction, Mumbai. Sir, I, Mr. Ashish R. Solanki, have undertaken assignment as an Architect of certifying Percentage of Completion of Construction Work of Proposed Redevelopment of Existing Residential Building known as Tulip situated on the Plot bearing C.T.S. No. 196A, Plot No. 3/13 of JVPD MHADA Layout of Konkan Division, Village Juhu, Taluka Andheri, District Mumbai Suburban, PIN 400049, admeasuring 522.56 Sq. Mts. area being developed by M/s. Disha Construction, Mumbai. Following technical professionals are appointed by Promoter:- (i) Mr. Premal K. Gogri as Architect; (ii) Mr. Bhavin M. Shah as Structural Consultant; (iii) Mr. Hitesh R. Solanki as Site Supervisor Based on Site Inspection, with respect to the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Wings of the Real Estate Project registered under MahaRERA vide registration no. P51800024339 is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Sr. No. Tasks / Activity Percentage of work done 1 Excavation 100% 2 Plinth 100% 3 Stilt 70% 4 13 no. out of 13 no. of Slabs of Super Structure 100% 5 Internal walls, internal Plaster, 50% Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 6 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 7 Stair cases, Lift Wells and Lobbies at each 80% Floor level connecting Stair cases and Lifts, Overhead and Underground Water Tanks 8 The external plumbing and external plaster, 31.25% Elevation, completion of terraces with water Proofing of the Building/ Wing, 9 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate TABLE B Internal & External Development Works in Respect of the entire project S. Common areas and Proposed Percentage of Details No. Facilities, Amenities ( Yes / No ) work done 1 Internal Roads & Footpaths No NA 2 Water Supply Yes 0% On completion of the building. 3 Sewarage (chamber, lines, Yes 0% Internal Chambers SepticTank, STP) and lines proposed. No STP Proposed. 4 Strom water drains Yes 0% Will be connected to Municipal Storm Water Drain. 5 Landscaping & Tree Yes 0% As per Tree NOC. planting 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of No NA sewage and sewage water 9 Solid waste management & Yes 0% Vermiculture Bin will disposal be provided as per requirement by MCGM. 10 Water conservation, Rain Yes 0% Recharge pit water harvesting proposed as per RWH Consultant’s Remarks. 11 Energy Management No NA 12 Fire Protection and fire Yes 0% As per CFO NOC. safety requirements 13 Electrical meter room, sub Yes 0% As per requirement station by Reliance Energy. 14 Society Office Yes 0% On completion of the building. 15 Fitness Centre Yes 0% On completion of the building. Yours Faithfully, For AASHISH SOLANKI a r c h i t e c t s Ashish Digitally signed by Ashish Ramniklal Solanki DN: c=IN, o=Personal, title=6402, pseudonym=fdd5b36b8123605b6663ba Ramniklal 56bda22dc06e7bc0a0153b7fadbb43528 4aa31985a, postalCode=400057, st=Maharashtra, serialNumber=9db82c5cd99a333ad65b Solanki 652b476ba6df1c16ce7b0f3170528b2eb e341207558f, cn=Ashish Ramniklal Solanki Date: 2022.04.13 14:59:34 +05'30' Ashish R. Solanki (CA/2000/26252)