FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date : October 07, 2020 To, Mr. Cyrus J. Mody, Designated Partner, M/s. SIMBA PROPERTIES LLP, Plot No.81/83, 2nd floor, Stadium House Block-I, Veer Nariman Road, Churchgate, Mumbai – 400 020. Subject: Certificate of Percentage of Completion of Construction Work of One No. of Building comprising Residential Units in B Wing of the Second Phase of the Project [MahaRERA Registration Number is P51800023159] situated on the Plot bearing CTS No. 809A/1/1/6 & 809A/1/1/7 of village Poisar demarcated by its boundaries 27.45m Wide D. P. Road to the North, CTS No.809A/1/1/8, CTS No.809A/1/1/10 & CTS No. 809A/1/1/11 to the South 36.60m Wide D. P. Road to the East CTS No.809A/1/1/5 to the West of Division- Village - Poisar, Taluka - Borivali, District - Mumbai Suburban PIN 400101 admeasuring 6362.40 Sq. m. or thereabout area being developed by M/s. SIMBA PROPERTIES LLP ( earlier M/s. BREDCO) C.A. to Owners M/s.NANABHOY JEEJEEBHOY PVT. LTD. Sir, I Shri. Vilas M. Nagalkar of M/s.4Site Architects have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of One No. of Building comprising Residential Units in B Wing of the Second Phase of the Project situated on the Plot bearing CTS No.809A/1/1/6 & 809A/1/1/7 of village Poisar of Division- Village - Poisar, Taluka - Borivali, District - Mumbai Suburban PIN 400101 admeasuring 6362.40Sq.m. or thereabout area being developed by M/s. SIMBA PROPERTIES LLP (earlier M/s.BREDCO) C.A. to Owners M/s. NANABHOY JEEJEEBHOY PVT. LTD. 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri Vilas M. Nagalkar of M/s.4Site Architects as Architect ; (ii) Shri Achyut Watve of M/s.JW Consultants LLP as Structural Consultant (iii) Shri Birju Patel of M/s.MEP Consulting Engineers as MEP Consultant (iv) Shri Sanjay S. Rane as Licensed Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on 30th September 2020 the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as P51800023159 registered under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. (Page 1 out of 4) Table A FOR P51800023159 Building / comprising Residential units in B Wing (to be prepared separately for each Building /Wing of the Project) Sr. Tasks /Activity Percentage of work done No. 1. Excavation 98.16% (Based on following sub-item%) a) Shore Piles a) –N.A.- % (As Completed -Nil- of Nil- Nos.) b) Excavation b) 98.16 % (As Completed 8344 of 8500Cu.m) 2. Two Number of Basement(s) -Nil- % (Based on following sub-item%) and Plinth a) Basement Raft Slab & Foundations a) – Nil -- % b) Lower Basement & ceiling/top Slab b) – Nil -- % c) Upper Basement & ceiling/top Slab/plinth c) – Nil -- % 3. Ground(pt) & Stilts(pt) Floor -Nil- % Overall 4. Five Number of Podiums/ -Nil- % (Based on following sub-item%) Parking Floors a) 1st Podium/parking Floor & ceiling a) – Nil -- % b) 2nd Podium/Parking Floor b) – Nil -- % c) 3rd Podium/Parking Floor c) – Nil -- % d) 4th Podium/Parking Floor d) – Nil -- % e) 5th Podium/parking Floor e) – Nil -- % 5. Forty Number of Slabs of -Nil- % (As Completed 0 out of 40 floors) Super Structure 6. Sub-structure Works: -Nil- % (Based on following sub-item%) a) Internal walls, a) – Nil -- % (As Completed 0 out of xx floors) b) Internal Plaster, b) – Nil -- % (As Completed 0 out of xx Units) c) Floorings within Flats/Premises, c) – Nil -- % (As Completed 0 out of xx Units) d) Doors & Windows to each of the d) – Nil -- % (As Completed 0 out of xx Units) Flat/Premises 7. Internal Installations Works: -Nil- % (Based on following sub-item%) a) Sanitary Fittings within the a) – Nil -- % (As Completed 0 out of xx Units) Flat/Premises, b) Electrical Fittings within the b) – Nil -- % (As Completed 0 out of xx Units) Flat/Premises 8. Common Area Works: -Nil- % (Based on following sub-item%) a) Staircases/Railing, floor finishing work at a) – Nil -- % (As Completed 0 out of xx floors) each Floor level b) Lifts Wells and Lobbies at each Floor level b) – Nil -- % (As Completed 0 out of xx floors) connecting Staircase and Lifts c) Overhead Tanks and c) – Nil -- % (As Completed 0 out of xx Tanks) d) Underground Water Tanks d) – Nil -- % (As Completed 0 out of xx Tanks) (Page 2 out of 4) Table A FOR P51800023159 continued/-….. 9. Structure’s External Finishing -Nil- % (Based on following sub-item%) Works: a) The External plumbing & a) – Nil -- %(As Completed 0 out of xx Shafts) b) & External plaster b) – Nil -- % (As Completed 0 out of xx Side/flrs) c) Elevation Features/finishing/treatment c) – Nil -- % (As Completed 0 out of xx Side/flrs) d) Completion of terraces with d) – Nil -- % waterproofing of the Building/Wing. 10. Phase’s Ancillary Works : -Nil- % (Based on following sub-item%) a) Installation of lifts, a) – Nil -- % (As Completed 0 out of xx Nos) b) water pumps, b) – Nil -- % (As Completed 0 out of xx Nos) c) Fire Fighting Fittings and Equipment as c) – Nil -- % (As Completed 0 out of xx floors) per CFO NOC, d) Electrical fittings to Common Areas d) – Nil -- % (As Completed 0 out of xx floors) e) electro, mechanical equipment, e) – Nil -- % (As Completed 0 out of xx floors) f) Compliance to conditions of f) – Nil -- % environment/CRZ NOC, g) Finishing to entrance lobby/s g) – Nil -- % h) plinth protection, paving of areas h) – Nil -- % (As Completed 0 out of xx Sides) appurtenant to Building/Wing, i) Compound Wall and i) – Nil -- % (As Completed 0 out of xx Sides) j) all other requirements as may be j) – Nil -- % required to Obtain Occupation /Completion Certificate (Page 3 out of 4) Table-B FOR P51800023159 Internal and External Development Works in Respect of the entire Registered Phase Sr. No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done 1. Internal Roads & Yes -Nil- Compound paving except Footpaths/Comp. LOS Paving 2. Water Supply Yes -Nil- Supply by MCGM 3. Sewerage (chamber, Yes -Nil- STP common for all lines, Septic Tank, STP) development 4. Storm Water Drains Yes -Nil- As per MCGM norms / Remarks 5. Landscaping & Tree Yes -Nil- common for all Planting development 6. Street Lighting Yes -Nil- common for all development 7. Community Buildings/ Yes -Nil- Fitness Center common for Fitness Center all residential development 8. Treatment & disposal of Yes -Nil- common for all sewage & sullage water development 9. Solid Waste Yes -Nil- common for all management & development Disposal 10. Water conservation, Yes -Nil- common for all Rain water harvesting development 11. Energy management Yes -Nil- common for all development 12. Fire Protection and fire Yes -Nil- common for all safety requirements development 13. Electrical meter room, Yes -Nil- Will be provided as sub-station, receiving necessary common for all station development 14. Proposed Public Yes -Nil- Final Approval is in Process parking/Retail market to be handed over to MCGM at any location in larger property 15. Aggregate area of Yes -Nil- common for all Recreation/Layout development as per MCGM Open Space norms Yours Faithfully, Vilas Digitally signed by Vilas Murlidhar Murlidhar Nagalkar Date: 2020.10.07 Nagalkar 10:58:57 +05'30' ( VILAS NAGALKAR ) ARCHITECT-CA/98/23224 (Page 4 out of 4)