SUFIYAN ARIF KHILJI 201, Haji Badruddin Manzil, Near St. Larence Highschool, Marol, Andheri (East), Mumbai- 400 059. Mob. No.9967466696 FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Proiect and for withdrawal of Money from Designated Account- Proiect wise) Date: r- 08/07 /2020 To M/s. Atul Projects India Pfi. Ltd., 5th Floor, Trade Avenue, Suren Road, off. W. E. Highway, Andheri [East), Mumbai 400 093. Sub : Certificate of Cost Incurred for Development of Samarth BIue Mountains for Construction of one building / A Wing of the 1" Phase (MahaRERA Registration Number psi800024146 situated on the Plot bearing CTS No.102, 102/! to Sldemarcated by its boundaries (latitude L9"LA'25.10"N Longitude 72"51'3.81"8, latitude 19"LO'26.93"N Longitude 72"5!'8.6L"E, latitude t9" LO' 24.90"N Longitude 7 2" 5L' 12.60"E, latitude 19" LO' 22.7 5"N Longitude 72"5L'6.43"E of the end points) 9.15Mtr wide DP Road to the North, CTS NO 102(Pt) &27.45 Mtr wide DP Road to the South, CTS No. l0 /LA, lO /lE, 50A to the East & CTS No. 102(Pt) to the West of Division P/South, village Pahadi Goregaon - (E), talukaBorivali, District Mumbai, PIN 4OO 097 admeasuring 26863.45 sq.mts. area being developed by M/s. Atul Projects India Pvt. Ltd. (C.A to Lucky Developers). Ref : MahaREM Registration Number p5i800024146 Sir, I, Shri Sufiyan Arif Khilji undertaken assignment of certiSzing Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaREM, being one Building/ A Wing of the lstPhase situated on the plot bearing CTS nos. 102, 1.02/L to 8L of Division P/South, village PahadiGoregaon - [E), talukaBorivali, District Mumbai, PIN 400 097 26863.45 sq.mts. area being developed by Mls. Atul Proiects India Pvt. Ltd. (C.A to Lucky Develppers)..- ir1,., b 1. Following technical professionals are appointed by Owner / Promoter :- [i) M/s. ]atin Bhuta & Associates as L.S. / Architect ; (iiJ M/s P.T. Gala as Structural Consultant (iii) IryHouse MEP Consultant (iv) Shri N. B. Delvadia Quantity Surveyor * 5k 7 SUFIYAN A RIF KHILTI Andheri Mumbai - (East]' 400 ose' 201, Haii Badruddin Manzil, Near st' [:T:ii'3$;i"r:L#"rol' 't'tgp and Allied works' of the 2.WehaveestimatedtheCostofthecompletiontoobtainoccupation certificate/completion certifiJa:t"e, J ,ir. civil, project under reference by the Buildingoftheproject'our.estimatedcostcalculationsarebasedonthe madeavailable io ,,, for the Drawings/plans the entire Developer and Consultants ,;;tht Stt'tautt of ilems and quantity for appointed by as calculated by shri N- B. Delvadia quantity surveyor*. work and other Developer/Engineer, and the ,rru*ption of the io,t oi material' labour inputsmadebydeveloper,andthesiieinspectioncarriedoutbyus. tfre buildingof the aforesaid 3. we estimate Total Estimated cost of completiol-of tot'r^of Table A and B)' The project under ,"r.,tntt as Rs 18'40'0;i'007'[ the civil,' MEP and allied works is with r;;;;;;:.io estimated rotat cost of proiect certificate required to be compleied for the purpor. of obtaining occupation being ,h.ilu* Rehabilitation Authoritv /completion ...tin.ullui"rin. ort,;;dfril proiect is being planning Authority under whose iutitiitti"' the aforesaid the implemented. of Cost Incurred till date is calculated at Rs. 18,40,05,000/-[Total of 4. The Estimated on the base TableA and B). the amount of estimatJ iori in.u.ted is calculated amount of Total Estimated Cost' of the Buildingof of the.Civil, MEP and Allied works The Balance cost of Completion from 5. dertificate / completion certificate the subject proiegr to oritrin occupation is estimated at Rs NIL (Total of Authority[prrnning euir,otiryl slum Rehabilitation Table A and B). Prof ect and allied work Jor the aforesaid I certiff that the cost of the civil, MEP is as given in Table A and B below : ascompleteaon tn. Jriu or,ni, certificate L7,t4,55,OOOI' ffibuilding/wing .. 3LuMarch 2020 17,t4,55,0001- E6si i""r""d ,t on the Estimq!99!-999! Work done in Percentage cost as Percentage of the estimated ilG... C*t t" be lncurred Uo-st 1"""*a;. Additiona I /Extra ltems in the Estimated Cost as on 31st July 2019 not included / SUFIYAN ARIF KHILII 201, Haji Badruddin Manzil, Near St. Larence Highschool, Marol, Andheri (East), Mumbai- 400 059. Mob. No.9967466696 TABLE A Rehab Building SR. PARTICULARS AMOU NTS No 1 Total Estimated cost of the building/wing NIL as on date of Reeistration 2 Cost incurred as on 3l,st March 2020 NIL (based on the Estimated cost ) 3 Work done in Percentage Nil (as Percentage of the estimated cost 4 Balance Cost to be lncurred NIL (Based on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems NIL as on 31st March 2020 not included in the Estimated Cost (Annexure A) TABLE B To be prepare for the entire registered phase of the Project 1 Total Estimated cost of the lnternal and External 1,25,50,000f - Development Works including amenities and Facilities in the layout as on 31/03/2020date of Registration is 2 Cost incurred as on 31'March2020 1,25,50,000f - (based on the Estimated cost ) 3 Work done in Percentage 1,00% (as Percentage of the estimated cost 4 Balance Cost to be lncurred NIL (Based on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems .r NIL as on 31u March 2020 not included in the Estimated Cost B (Annexure A) Yours Faithfully Sufiyan Arif Khilji (License No. S/937lSS-[ / STJFIYAN ARIF KHIUI (East)' Mumbai-400 ose' Andheri 201, Haji Badruddin Manzil, Near st' n:T.'i]5$;i"##"rol' I * Note Real Estate Proiect as per drawings 1. The scope of work is to complete entire certificate /completion certificate' approvedfrom time to time so as to outrin occupation Enqineer or can be done by an 2. [*) Quantity survey can be .done by officeof9f upon independenteuantity Surveyor, who;e c#ificate quantity calculated can be relied appointed by Developer' by theEngineer. In Jrr. of independeni"rrdt ,,.r*uyo'ieing -m.ntioned are thename has to ue at tr,e prace -marked 1*1 and in- case -quantitywho of Engineer' the name of the pu"on in the office beingcalculated by place marked (*)' "ffi;.-"iE"gineer, should be mentioned at the isresponsibfu fo, tt qrrilt;[rlaied " required material, equipment and machinery 3. The estimated cost includes all labour, tocarry out entire work' in quantity required for development of 4. As this is an estimated cost, any deviation be incurred' theReal estate Proiect will result in amendment of th; cost incurred/to exhaustive' 5. All components of workwith specifications are indicative and not Annexure A with Cost iii"ir*,.a / Additional Items executed Estimate of Total Cost) of tf'" original [which were not prti 4k r.r1 r B