Somaiya E Associates ARCHITECT'S CERTIFICATE Date: 03/1,0/20L9 To M/s. Rishabraj Balaji Infra, 101, Raj Bhavan, Daulat Nagar, Road No. 9, Borivali (E), Mumbai - 400066 subject: certificate of Percentage of completion of construction work of Building having Single Wing of the phas6 I of the froyeci g*lrfrrnfna applied forl situated on the plot bearing crj ruo. Registration Number zo zB, 2678/r io s, iozg, 2679 to 3 demarcated by its boundari"r, crs No. 2677 /1 south' 2673 to the East & 9.15 Mtrwide Daulat to the North, 2680 to the Nagar Road No. 7 to the west of Division Eksar v,rage, Road No. 7, D_aurat Nagar, Borivali (E), Mumbai _ 400066 admeasuring42S sq.mts. area being develop"i uy rtl7r. nirnabraj Balaji Infra. Sir, l/ we AR' HIRAL 'M' SOMAIYA, have undertaken assignment as Surveyor of certifying?ercentage of completion Architect /Licensed of construction work of the -Building having single wing of the Phaie I of the Projec! ,itrrt.a on the plot beari ng 267g, 2678/1to 3,2679,2679/'l' to 3 of Eksar village, Road No. 7, Daulat Nagar, Borivali (EJ, |'r'iill,lj;400066 admeasurins 425 sq.mts. area being d;r;;;;'o;i;7.nishauraj L. Following technical professionals are appointed by Owner / promoter :_ (i) M/s/Shri/smt HIRAL .M. SOMAIyA as L.S. Architect; / (ii) M/s Nexus Project solutions Pvt. Ltd. as Stn:clurai consultant (iiiJ Shri. fitendra Udani as Site Supervisor Based on Site Inspection, with respect to each of the Builcling/wing of the aforesaid Real Estate Project , I certi$r that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project fapplied for) under MahaREM is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Tabre B. Table A Building /Wing Number_[to be prepared separately for each Building /Wing of the Proiect Sr. No Tasks /Activity Percentage of work done I Excavation 100 Completed 2 - Nil - number of Basement[sJ and Plinth 1.00 o/o Comoleted 3 00 number of Podiums NA 4 Stilt Floor 0 %o Completed 5 of Slabs of Super Structure 0 Slabs Completed -0g-number 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0 % Completed 7 Sanitary Fittings within the Flat/Premises, 0 % Completed Electrical Fittings within the Flat/Premises 0 % Comnleted B Staircases, Lifts Wells and Lobbies at each Floor Ievel connecting Staircases and Lifts, Overhead and Underground Water Tanks 0 %o Completed 9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing 0 % Completed 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ N0C, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate % Comnleted TABLE.B Internal & External Development Works in Respect of the entire Registered Phase S.No Common areas and Proposed Percentage of Details Facilities, (Yes/No) Work done Amenities 1. Internal Roads NO N.A Single Building adjacent &Foothpaths to Municipal Road 2. Water Supply YES 0 o/o Building Under Construction 3. Sewarage (chamber, lines, YES 0o/o Building Under Septic Tank, STP) Construction 4. Storm Water Drains YES 0 o/o Building Under Construction 5. Landscaping & Tree YES 0 o/o Building Under Plantine Construction 6. Street Lighting YES 0 o/o Building Under Construction 7. Community Buildings NO Nil N.A B. Treatment and disposal of NO Nil sewage and sullage water N.A 9. Solid Waste management & NO 0 o/o Disposal N,A 10. Water conservation, Rain YES 0 o/o Building Under water harvesting Construction 11. Energy management NO 0 o/o N.A 12. Fire protection and fire YES 0 o/o Building Under safetyrequirements Construction 13. Electrical meter room, sub- YES 0 o/o station, receiving Building Under stationOthers Construction 14. ( Option to Add more) 0 0 o/o Yours Faithfully For Somaiya & Associates Ar. Hiral M. Somaiya (Proprietorl License No. CAIZ00 0 /25680