ARCH RITESH H THAKUR B-1, Ganga Vihar Apt, V.N. Purav Marg, Near Trimurti Society, Sion (Chunabhatti), Mumbai-400022. Date: 31/12/2025 To, M/s Shree Dham Developers, 1205, Universal Majestic, 12th floor Opp- RBK International School, off. Ghatkopar – Mankhurd Link Road, Chembur, Mumbai, 400043. Subject: Certificate of Percentage of Completion of Construction Work of ‘Pushpanjali Residency’ situated on the Plot bearing C.N. No/CTS No. /Survey no. / Final Plot no. 352(pt) demarcated by its boundaries 19°06'49.7" to the 72°55’57.6" the East of Division Kokan, village Hariyali, taluka Kurla, District, Mumbai Suburban, PIN 400083 measuring 827.64 sq.mts. Area being developed by M/s Shree Dham Developers, for Quarter-3 of 2025-26 i.e.01-10 2025 to 31-12-2025. Sir, I, Ar. Ritesh Thakur have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the ‘Pushpanjali Residency’ situated on the Plot bearing C.N. No/CTS No. /Survey no. / Final Plot no. 352(pt), Division Kokan village Hariyali taluka, Kurla District, Mumbai Suburban PIN 400083 measuring 827.64 sq.mts. Area being developed by M/s Shree Dham Developers. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800024049 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table: TABLE - A Building – Pushpanjali Residency Sr. Tasks /Activity Percentage No of work done 1. Excavation 100% 2 1number of Basement(s) and Plinth 100% 3 Number of Podiums NA 4 Ground Floor 65% 5 23 number of Slabs of Super Structure 86% 6 Internal walls, Internal Plaster, Floorings withinFlats/ 70% Premises, Doors and Windows to each of the Flat/ Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 30% within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 55% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster,elevation, 65% completion of terraces with waterproofing of the Building/ Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 10% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance toconditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. TABLE – B Building - Pushpanjali Residency Internal & External Development Works in Respect of the entire Registered Phase Sr. No Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done 1. Internal Roads & Footpaths No 0 NA 2. Water Supply Yes 0 As per norms 3. Sewerage (chamber, lines, Yes 0 0 Septic Tank , STP) 4. Storm Water Drains Yes 0 0 5. Landscaping & Tree Planting No 0 NA 6. Street Lighting No 0 NA 7. Community Buildings No 0 NA 8. Treatment and disposal of No 0 NA sewage and selvage water 9. Solid Waste management & No 0 NA Disposal 10. Water conservation, Rain Yes 0 As per water harvesting norms 11. Energy management No 0 NA 12. Fire protection and fire Yes 5% As per safety requirements norms 13. Others (Option to Add more) No 0 NA Yours Faithfully, Ritesh Digitally by Ritesh signed Hemant Hemant Date: Thakur 2025.12.03 Thakur 11:12:02 +05'30' Ar. Ritesh H Thakur Agreed & Accepted by: Name : M/s Shree Dham Developers