FORM-2A [ See MAHARERA order no. of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (site supervisor's certificate) (To be uploaded quarterly) To, The ADHIKARI ENGINEERING PVT LTD 435, Avior, Nirmal Galaxy, LBS Road, Mulund (West), Mumbai 400078 Quality Assurance Certificate (Certificate no 1for the quarter ending 30/09/2022) of Construction and Subject: Certificate for quality of materials used and quality of Building(s)/Rehab and workmanship for the Work of Maharashtra Mandir No. C. S. Sale Wings(s) of the 1st Phase of the project situated on the plot bearing No./C.T.S. No./ Survey No./Final plot no. 231A (pt), 234, 234(1 to 14), 235, 235(1 to 6), 236, 236(1 to 7), 1331,1331 (1 to 10) demarcated by its boundaries of North, 27.45m wide D.P. Road, adjoining slum, South 13.40 m wide existing road, East West adjoining Nalla, of Village Kanjur, Taluka Kurla, Mumbai. Admeasuring PVT Ltd. 1680.15 Mtrs. Plot area being developed by M/s. Adhikari Engineering Sq. Reference: MahaRERA Registration Number- P51800024024 Sir. I have undertaken an assignment of supervision of this real estate project. 1. Our Responsibility: - and as per the To carry out the work in accordance with the development permission work and to carry out material approved plan and submit certificate of supervision of ensure quality of work and testing in-situ or in the authorized laboratory and to 1. Material Testing: the basic materials, used in the Iwe, have applied following mandatory checks on construction. mm: i. Cement- time. compressive strength etc. It has been tested for its fineness. soundness. setting 3535:1986 or as per other relevant IS 85/NBC code. or as per industry asper IS code limits. standards and its results are within the permissible ii. Coarse aggregate - It has been tested, for deleterious materials. clay lumps, crushing value, impact IS/BS/NBC code or as per value as per 1S 243011986 or as per other relevant within the permissible limits. industry standards and its results are ii. Bricks/ blocks etc. as per 1S They have been tested for water absorption. crushing strength 5454:1978 or as per other relevant IS/85/NBC code or as per industry standards and its results are within permissible limits. iv. Concrete/Ready-mix Concrete- as per 15 456:2000 It has ben tested for compressive strength for various periods standards and IS 1199 or as per other relevant IS/BS/NBC codes, as per industry and its results are within permissible limits. v. Steel for concrete- It has ben tested as per IS 2062:2011 or as per other relevant IS/BS/NBC code or as per industry standards for tensile strength. elongation and gauge length etc. and its results are within permissible limits. vi. Testing of Other materials Other materials like sand, crushed sand, tloor tiles, fixtures and {ittings, pipes and sanitary fittings ete. (List out all items) used in this project conform to relevant IS/BS/NBC code or as per standards laid down by the Industry for a particular material. 2. Workmanship: I/we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the pernmissible limits of deviations as per relevant code of practice. m: 3. Electrical Materials and workmanship:- works of all the electrical wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical and its records has been maintained. The materials used conform to engineer the relevant 1.S/ B.S/ National Building codes or as per industry standards. 4. Structural engineer: Promoters has engaged structural engineer M/s. Nexus Project Solution Pvt.Ltd. as Structural Consultant. having Licenses no. having office Rowhouse no. 4,Dheeraj Savera, opp. Siddhartha nagar, Boriwali East Mumbai -66 cell no.99301 29631 The structural design of buildings in this project has been done under his supervision. He has checked the soil report before laying PCC for foundation in consultation with soil consultant. The formwork and concrete mix design has been done as per Is 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 5. Preservation of records: - Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law 6. Please specify materials or any other item of work which were not conforming to the standard specifications and which were not rejected. Yours Faithfully, Name: SATISH S ADHIKARI License no.: A/37/SS-III Phone no.25620506 Place: Mumbai