A 11,03, OPAL SQUARE, S, G. BARVE MARG OPP. MIDC THANE, WAGLE ESTATE THANE (WEST)- 400 604 Landline : 022 2081 3369 e-mail : ss_associatesl@yahoo.co.in FORM 1 ARCH ITE CT'S CERTIFICATE Date: - 19l06l2023 To, M/s. Adhikari Engineering P\/T Ltd, 435, Avior, LBS Road, Opp Johnson & Johnson, Mr-rlund (W), Murnbai - 4OO O81. Subject:Certificate of Percentage of Cornpletion of Constmction Work of proposed building Known as "Maharashtra Mandir" cornprising of the project situated on tLre plot bearing C.T.S. No. 23IA (pt),234,234(1 to 14), 235,235(1 to 6), 236,236(l to 7), 1331, 1331 (1 to 10) of "Shree Ganpat Mali SRA CHSL" dernarcated by its boundaries of North, adjoining slurn, Sorrtkr 13.40 rrr wide existing road, East 27.45rn wide D.P. road, West adjoining Nalla, of Village Kanjur, Taluka Kurla, Murnbai. Adrneasuring 1680.16 Sq. Mtrs. plot area being developed by M/s. Adhikari Engineering PVT Ltd. Sir, We, S. S. Associates Lrave r.rndertaken assignrnent as ArcLritect of certifying Percentage of Cornpletion of Constrr.ction Work of the proposed building Known as "Maharashtra Mandir" Cornposite building situated on the plot bearing, C.T.S. No. 23IFt (pt), 234, 234(L to I4), 235,235(1 to 6),236,236(I to 7), 1331, 13.31 (1 to 10) of o'Shree Ganpat Mali SRA CHS" Village Kanjur, TaLrka Kurla, Murnbai. Adrneasuring 1680.16 Sq. Mtrs. plot,aqea being developed by M/s. Adtrikari Engineering PVT Ltd, having r/gist\red office at M/s. Adhikari Engineering PVT Ltd' 435, Avior, L$S Road, Opp JohnSon & JoLrnson, Mulund (W), Murnbai - 400 080. Following tectrnical professionaLs are appointed by Prornoter: - (i) S.S. Associates as Architect. (ii) M/s. Nexus Project Solution Pvt.Ltd. as Structural Consultant. (iii) M/s. Nexus Project Solution Pvt.Ltd. as MEP consr-rltant. (i.r) M/s. Nexus Project Soh.rtion Pvt.Ltd. as Quantity Surveyor. Based on Site Inspection, with respect to each of thre Buitding/Wing of the a-foresaid Real Estate Project, I certify that as on tlre date of this certificate, tkre Percentage of Work done for the building of tLre Real Estate Project is as per tabie A herein below. TLre percentage of thre work executed with respect to each of tkre activity of the entire phase is detailed inTable B. f 1103, OPAL SQUARE, S. G. BARVE MARG OPP. MIDC THANE, WAGLE ESTATE THANE (WEST) - 400 604. Landline : 022 2081 3369 e-mail : ss_asSoCiatesl@yahoo.co.in \. TAEIr-E - A ( Cornpo site Brrilding) Sr. Ted .ffl' N, sl(lat ure of tt I Prornotfr I n TL Narrie :- M I s. AdhiHati lE l- neering PVT Ltd Date :- /// /)