A SSASSOCATES 0 OPA s0ARE SGARVt MAR OPP MIDTHANE, WAGltt sIA HANE (WN) 400b04 Iandlune 02 2081 o mail s otesl@yahoo in FORM 1 ARCHITECT'S CERTIFICATE Date: 10/02/2023 To, M/s. Adhikari Engineering PVT Ltd, 435, Avior, LBS Road, Opp Johnson & Johnson, Mulund (W), Mumbai - 400 081. Subject:Certificate of Percentage of Completion of Construction Work of proposed building Known as "Maharashtra Mandir" comprising of the project situated on the plot bearing C.T.S. No. 231A (pt), 234, 234(1 to 14), 235, 235(1 to 6), 236, 236(1 to 7), 1331, 1331 (1 to 10) of "Shree Ganpat Mali SRA CHSL" demarcated by its boundaries of North, adjoining slum, South 13.40 m wide existing road, East 27.45m wide D.P. road, West adjoining Nalla, of Village Kanjur, Taluka Kurla, Mumbai. Admeasuring 1680.16 Sq. Mtrs. plot area being developed by M/s. Adhikari Engineering PVT Ltd. Sir, We, S. S. Associates have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the proposed building Known as "Maharashtra Mandir" Composite building situated on the plot bearing, C.T.S. No. 231A (pt), 234, 234(1 to 14), 235, 235(1 to 6), 236, 236(1 to 7), 1331, 1331 (1 to 10) of "shree Ganpat Mali SRA CHS" Village Kanjur, Taluka Kurla, Mumbai. Admeasuring 1680.16 Sq. Mtrs. plot area being developed by M/s. Adhikari Engineering PVT Ltd, having registered office at M/s. Adhikari Engineering PVT Ltd, 435, Avior, LBS Road, Opp Johnson & Johnson, Mulund (W), Mumbai 400 080. Following technical professionals are appointed by Promoter: i) S.S. Associates as Architect. (ii) M/s. Nexus Project Solution Pvt.Lid. as Structural Consul tant. (ii) M/s. Nexus Project Solution Pvt. Ltd. as MEP consultant. (iv) M/s. Nexus Project Solution Pvt.Ltd. as Quantity Surveyor. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. A S. S. ASSOCIATES 1103, OPAL SQUARE, S. G. BARVE MARG OPP. MIDC THANE, WAGLE ESTATE THANE (WEST) - 400 604. Landline : 022 2081 3369 e-mail: ss_associates1@yahoo.co.in TABLE-A (Composite Building) work Sr Tasks/ Activity Percentage of No. (2) done 3 1. Excavation 100 % 100 % 2. Plinth 3. Podiums N.A 1 Stilt floor O.00 % 4. 100 % 5 23 number of Slabs of Super Structure Internal Walls, Internal Plaster, Floorings 45 % 6. Doors and withina Flats/Premises, Windows to each of the Flat/Premises Fittings within the 35 % 7. Sanitary within Flat/Premises, Electrical Fittings the Flat/Premises. 80 % 8. Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks The external plumbing and externa1 30 % 9 with plaster, elevation, completion of terraces waterproofing of the Building/Wing. Installation of lifts, water pumps, Fire Fighting 0.00 % 10. Fittings and Equipment a s per CFO NOC, Electrical fittingsto Common Areas, electro, mechanical equipment, Compliarnce to condi- tionas of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of a r e a s appurtenant to Building Wing, Cormpound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate. .AS A S.SASSOCIATES 1103, OPAL SQUARE, S. G. BARVE MARG5 OPP. MIDC THANE, WAGLE ES TATE THANE (WEST) 400 604. Landline :022 2081 3369 e mal 55 associates1@yahoo.co.In TABLE- B Internal and External Development Works in respect of the entire Registered Phase. Proposed Percentage Details Sr.No Common areas and Facilities (Yes/No) of work (1) Amenities (3) done (5) (2) 4) N.A InternalRoads &Footh-paths._ No N.A 0% MCGM Water Supply Yes 0% MCGM Yes 3. Sewerage (Chamber,lines,Septic Tank STP) Developer 4 Storm Water Drains Yes 0% Landscaping&Tree Planting. No N.A N.A 5. N.A No N.A 6. Street Lighting No N.A N.A Community Buildings N.A and disposal of No N.A 8. Treatment sewage and sullage water. N.A N.A Solid Waste management & No 9. Disposal_ water Yes 0% Developer Water conservation Rain 10. harvesting_ N.A Energy management No N.A 11 Fire protection and fire safety Yes 0% Developer 12. requirementS Developer meter room, sub- Yes 0% 13. Electrical station, receiving station. Yes 0% Developer 14. PumpRoom Yours faithfully, CA SHEETAL NIKHARE FOR S. S. ASSOCIATES (CA/2003/31138) Agreed And Accepted by Signature of Promoter Name:- M/s. Adhikari Engineering PVT Ltd Date :-