DEODHAR A55OCIATES ARCHITECT5 AND PROJECT MANAGEMENT CONBULTANTS 150 9001: 201 5 Certified Organization HDlL 'Kaledonia', 5 0 4 / 6 , 5ch Floor, Sahar Road,Opp. ViJay Nagar S o ~ i e t y , - Andheri (E), Mumbai 400 069. Tel : 2684 6904/2604 0905 emril: office@deodhareeeocletee.com m RM1 ARCHITECT'S CERTIFICATE Date: 24.10.2019 To A. R. Amboli Developers. 702-708, Golden Chambers, Opp. Tanishq Showroom, Link Road, Andheri (West),Mumbai 400 053 - Subject : CeMcate of Percentage of Completion of Construction Work of Composite Building Wing-B of the Project MK GABINO [MahaRERA Registration Number] situated on the Plot bearing C.T.S. no. 440119, 440/19/1 to 7, 440120, 44012011to 8 demarcated by its boundaries (latitude and longitude of the end points) latitude 19d-07-45.857" Longitude 72d-50'-38.001N, latitude 19d-07'45.312" Longitude 724-50'-37.482" to the North latitude 19d-07-44.105" Longitude 72d-50$-37.782 to the South latitude 19d-07'- 44.92 1" Longitude 72d-50'-39.084", latitude 19d-07'45.403" Longitude 724-50'-38.348", latitude to the East 19d-07-44.931" Longitude 72d-50'- 37.002" latitude 19d-07-43.914"Longitude 7261-50,-36.813" to the West of Division Mumbai Suburban- village Ambivali, Taluka Andheri District MUMBAI CITY-PIN 400058 admeasuring 2962.99 sq. mts. Plinth area being developed by M / s A. R AMBOLI DEVELOPERS. Sir, I, Dr. Sushma A. Deodhar have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Building Wing- B, of the Project MK GABINO situated on the plot bearing C.T.S. no. 440119, 44011911 to 7, 440120, 44012011 to 8, of Division KONKAN village MUMBAI CITY, Taluka MUMBAI CITY, District MUMBAI CITY, PIN 404058 admeasuring 2962.99 sq.mts. Plinth area being developed by M l s A. R: AMBOLI DEVELOPERS. 1. Following technical professionals are appointed by Owner / Promoter: - (i) Dr. SUSHMA A. DEODHAR as Architect (ii) Mr. Ankusrh Mohile as Structural Consultant (iii)Mr. Rupesh Dwivedi as MEP Consultant (iv)Mr. Asgari GHnwala as Site Supervisor Based on Site Inspection, with respect of the Building of the aforesaid Real Estate Project, I cerhfy that as on the date of this certificate, the Percentage of Work done for Building Wing-B of the Real Estate Project as registered vide number under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase in detailed in table B. Table A Building A Sr. Tasks /Activity Percentage lo of work done 1 Excavation 0% 2 1number of Basement(s)and 1Plinth 0% 3 2 number of Podiums 0% 4 1Stilt Floor 0% 5 20 number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 0% within the FlatIPremises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0% Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZNOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal 8s External Development Works in Respect of the entire Reatered Phase No Common areas and Proposed Percentage Details Facilities, Amenities (yes/ No) of Work done 1. Internal Roads & Footpaths Yes 0% Trimix Concrete Internal Roads 2. Water Supply Yes 0% Municipal Water and Ground Water 3. Sewerage (chamber, lines, No 0% Direct connection Septic Tank , STP) to Municipal Sewer Line as per MCGM laws. 4. Storm Water Drains Yes 090 RCC pipes with Inspection 5. Landscaping 86 Tree Yes 0% NA Planting 6. Street Lighting No 0% NA 7. Community Buildings No 0% NA 8. Treatment and disposal of Yes 0% Direct connection sewage and sullage water to Municipal drain 9. Solid Waste management & Yes 0% Segregated and Disposal disposed by Agency 10. Water conservation, Rain Yes 0% RWH pits for Rain water harvesting Water. Dual water supply system. 1 1. Energy management Yes 0% LED lights in Common Areas 12. Fire protection and fire Yes 0% FF tank, Wet safety Risers, Hose Reels requirements and Fire Alarms. 13. Electrical meter room, sub- Yes 0% Meter Room to be station, receiving station provided 14. Others ( Option to Add more) Yours Faithfully,