FORM 1 ARCHITECT’S CERTIFICATE Ref.No.711/MUL March 31, 2020 M/s. L & T Asian Realty Project LLP L & T House, Ballard Estate Mumbai – 400 001. Subject: Certificate of Percentage of Completion of Construction Work of ‘Rejuve 360’ for Construction of Building No.3, Wing A situated on the plot bearing C.T.S. No., Part 706- B/B, Part 706-B/D, Part 706-B/E, Part 710A, Part 712A, demarcated by its boundaries (latitude and longitude of the end points) 1910’1.8452”N and 7256’25.7533”E to the North-West, 199’59.368”N and 7256’24.8475”E to the South-West, 199’59.0092”N and 7256’25.6909”E to the South-East and 1910’1.4437”N and 7256’26.6622”E to the North-East of Village Nahur, at L.B.S. Marg, Mulund (West), Mumbai- 400 080 admeasuring 1219.21 sq. mts. area being developed by M/s. L & T Asian Realty Project LLP. Sir, In continuation of our certificate dated 31.12.2019 certifying Percentage of Completion of Construction work of ‘Rejuve 360’ Building No.3, Wing A of the project, situated on plot bearing C.T.S. No. Part 706-B/B, Part 706-B/D, Part 706-B/E, Part 710A, Part 712A of Village Nahur, at L.B.S. Marg, Mulund (West), Mumbai- 400 080 admeasuring 1219.21 sq.mts. area developed by M/s. L & T Asian Realty Project LLP we further certify as under - Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, we certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project - ‘Rejuve 360’ Building No.3, Wing A is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A ‘Building no.3 Wing ‘A’ Sr. Tasks/Activity Percentage of No. work done 1 Excavation 10% 2 Number of 2 Basement & 1 Plinth 0% Ajb/1 3 7 number of Podiums 0% 4 3 number of Stilt Floor 0% 5 58 number of Slabs of Super Structure. 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors 0% and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 0% Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0% Staircases and Lifts, Overhead and Underground Water Tank. 9 The external plumbing and external plaster, elevation, completion of 0% terraces with waterproofing of the Building. 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment 0% as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Work done 1 Internal Roads & Footpaths Yes 0% Part of larger layout 2 Water Supply Yes 0% Part of larger layout Sewerage (chamber, lines, 3 Yes 0% Part of larger layout Septic Tank, STP) 4 Storm Water Drains Yes 0% Part of larger layout 5 Landscaping & Tree Planting Yes 0% Part of larger layout 6 Street Lighting Yes 0% Part of larger layout Club House with 7 Community Buildings Yes 0% various amenities part of larger Layout Treatment and disposal of sewage 8 Yes 0% Part of larger layout and sullage water Solid Waste management & 9 Yes 0% Part of larger layout Disposal Ajb/2 S. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Work done Water conservation, Rain water 10 Yes 0% Part of larger layout harvesting 11 Energy management Yes 0% Solar Panels Fire protection and fire safety As per CFO NOC: Part 12 Yes 0% requirements of larger layout Electrical meter room, sub-station, 13 Yes 0% Part of larger layout receiving station 14 Others (Option to add more) No N.A. Note : N.A. stands for Not Applicable. C.F.O stands for Chief Fire Officer N.O.C stands for No Objection Certificate Thanking you, Yours Faithfully, For DAISARIA ASSOCIATES MANOJ Digitally signed by MANOJ VALJIBHAI DAISARIA DN: c=IN, o=DAISARIA ASSOCIATES, ou=Partnership, VALJIBHAI 2.5.4.20=e0b99abe717d872eeb5d6f419f70 69763002d672c7ca95bc85eb7db685df181 a, postalCode=400086, st=Maharashtra, serialNumber=69ee299d1afcad80ad50373 DAISARIA 6061a9c8e316aa80737ea0db6acf2a70187b 9c607, cn=MANOJ VALJIBHAI DAISARIA Date: 2020.08.01 15:29:45 +05'30' (Manoj V. Daisaria) CA/82/7254 Ajb/3