AR DESIGN STUDIO ARCHITECTURE | INTERIORS | PMC | LANDSCAPE FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 01/02/2025 To, M/s. Damyanti villa Co. Op. Hsg. Soc. Ltd., Plot No 206, Jawahar nagar Road No.14, Goregaon (West), Mumbai 400104. Subject: Certificate of Percentage of Completion of Construction Work for Proposed redevelopment to the existing building on Plot No. 206, bearing C.T.S. No. 568, 568/1 to 568/6 at Jawahar Nagar, Road No.14 of Village Pahadi Goregaon, Goregaon (West), Mumbai, admeasuring 739.92 sq.mts. area being developed by M/s. Damyanti villa Co. Op. Hsg. Soc. Ltd. Sir, I, Shri. Ankit U. Jain have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work for on Plot No. 206, bearing C.T.S. No.568, 568/1 to 568/6 at Jawahar Nagar, Road No.14 of Village Pahadi Goregaon, Goregaon (West), admeasuring 739.92 sq.mts. area being developed by M/s. Damyanti villa Co. Op. Hsg. Soc. Ltd. 1. Following technical professionals are appointed by Owner / Promoter: - (i) Shri. Ankit U Jain of M/s. AR Design Studio as Architect (ii) Shri. Neel Narendra Dholia as Structural Consultant (iii) Shri. Dinesh H. Mehta as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800055127 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 2127 & 2128, Eaze Zone Mall, Goregoan Mulund link Road, Sunder Nagar, Malad West. ardesignstudio2017@gmail.com | work@ardesignstudio.co.in https://ardesignstudio.co.in/ +912240169458 / +917738723684 / 85 Table A Building /Wing Number_(to be prepared separately for each Building /Wing of the Project) Sr. Percentage of Work (As on Tasks / Activity No. Dated 31-12-2024) 1 Excavation 100% 2 Number of Basement(s) and Plinth 100% 3 Number of Podiums 00%. 4 Stilt Floor 100% 5 Number of Slabs of Super Structure 09% 6 Internal walls, Internal Plaster, Floorings within 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 00% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 00% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, 00% elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting 00% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other 00%requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Percentage of No. Common Area & completion Proposed Details Facilities, Amenities (As on Dated 31-12-2024) 1. Internal Road & Footpaths No 00% - 2. Water Supply Yes 00% Will be completed as per consultant Remarks 3. Sewerage Chamber Lines, Yes 00% Will be completed as Septic Tank per consultant Remarks 4. Storm water Drains Yes 00% Will be completed as per consultant Remarks 5. Landscape & Tree Yes 00% Will be completed as Planting per Tree NOC 6. Street Lighting Yes 00% - 7. Community Building No 00% - 8. Treatment and Disposal of No 00% - Sewerage & Sullage Water 9. Solid Waste Management Yes 00% Will be completed as & Disposal per Vermiculture Remarks 10. Water conservation & No 00% Will be completed as Rain water Harvesting per consultant Remarks 11. Energy Management No 00% - 12. Fire Protection & Fire Yes 00% Will be completed as Safety Requirement per fire consultant Remarks 13. Electric Meter room, Yes 00% Will be complied by substation, Receiving developer. Station 14. Open Parking No 00% Will be completed as per consultant Remarks Yours Faithfully Agreed and Accepted by Ankit Digitally signed by Ankit Uttamchand Jain Uttamchand Date: 2025.02.01 Jain 18:23:00 +05'30' Shri. Ankit U. Jain of M/s. AR Design Studio. Signature of Promoter Lic. No. CA/2014/64556 Name: M/s. Damyanti villa Co. Op. Hsg. Soc Ltd Date :