FORM - 1 ARCHITECT'S CERTIFICATE 30th June, 2021 To, M/s. Deraiya Realtors Pvt. Ltd., J-19, Mudi Bazar, Phase – II, APMC Market – 1, Vashi, Turbhe, Navi Mumbai – 400 703. Subject :- Certificate of Percentage of Completion of Construction Work of Guruprasad C.H.S.L. Bldg. No. 40, 1 Nos of Building, A & B Wings of the 1 Phase of the Project [Maha RERA Registration Number - P51800023015] situated on the Plot bearing CTS No. 12 (Pt.), Survey No. 229 & 267 demarcated by its boundaries (latitude and longitude of the end points) Lat - 1903’42.6”N; Long – 72052’56.98”E to the North Lat – 1903’41.59”N; Long – 72052’56.92”E to the South Lat – 1903’42.27”N; Long – 72052’57.70”E; to the East Lat – 1903’42.13”N; Long – 72052’56’.17”E; to the West of Division – Konkon, Nehru Nagar, Village Kurla, Taluka Kurla –III, District – Mumbai, Pin - 400024 admeasuring 1334.32 sq. mts. area being developed by M/s. Deraiya Realtors Pvt. Ltd. Sir, We M/s. Space Moulders have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Bldg. No. 40, 1 Nos. of Building, A & B Wing’s of the 1 Phase of the Project, situated on the plot bearing CTS No. 12 (Pt.) Survey No. 229 & 267 of Division - Konkon, Nehru Nagar, Village - Kurla, Taluka - Kurla – III, District Mumbai, PIN – 400024, admeasuring 1334.32 sq. mts. area being developed by M/s. Deraiya Realtors Pvt. Ltd. 1. Following technical professionals are appointed by Owner / Promoter :- (i) M/s. Space Moulders as Architect. (ii) M/s. Sihavat Consultancy Services as Structural Consultant. (iii) M/s. MAK MEP Consultants as MEP Consultant. (iv) Mr. Zuber D. Jagirdar as Site Supervisor. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800023015 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table – A Building No. 40, Wing – A & B Percentage of work Sr. No. Tasks / Activity done (%) 1 Excavation 100 a. __-__ Number of Basement(s) - 2 b. 1 Number of Plinth 100 3 __-__ number of Podiums - 4 Ground Floor 00 5 16 Number of Slabs of Super Structure 31 a. Internal walls 6.25 b. Internal Plaster 00 6 c. Floorings within Flats/Premises 00 d. Doors and Windows to each of the Flat/Premises 00 a. Sanitary Fittings within the Flat/Premises, 00 7 b. Electrical Fittings within the Flat/Premises 00 a. Staircases 31 b. Lifts Wells at each Floor 00 8 c. Lobbies at each Floor level connecting Staircases and Lifts 31 d. Overhead and Underground Water Tanks 00 a. External plumbing 00 b. External plaster 00 9 c. Elevation 00 d. Completion of terraces with waterproofing of the Wing 00 a. Installation of lifts, 00 b. Water Pumps 00 c. Fire Fighting Fittings and Equipment as per CFO NOC 00 d. Electrical fittings to Common Areas 00 e. Electro mechanical equipment 00 10 f. Compliance to conditions of environment /CRZ NOC, 00 g. Finishing to entrance lobby/s 00 h. Plinth protection 00 i. Paving of areas appurtenant to Building/Wing, 00 j. Compound Wall 00 k. Other requirements as may be required to Obtain Occupation 00 /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Percentage of Sr. Common areas and Proposed Work done Details No. Facilities, Amenities (Yes/No) (%) 1 Internal Roads & Foothpaths - - 2 Water supply Yes 00 Sewarage (Chamber, lines, 3 - - septic tank, STP) 4 Storm Water Drains Yes 00 5 Landscaping & Tree Planting Yes 00 6 Street Lighting - - 7 Community Buildings - - Treatment and disposal of 8 No - sewage and sullage water Solid waste management & 9 Yes 00 Disposal Water conservation, 10 Yes 00 Rainwater harvesting 11 Energy Management - - Fire protection and fire safety 12 Yes 00 requirements Electrical meter room, sub- 13 Yes 00 station 14 Other (option to Add more) - - - Yours faithfully For SPACE MOULDERS Digitally signed by Chandan P. Chandan Kelekar DN: cn=Chandan P. Kelekar, o=Space Moulders, ou=000000, P. Kelekar email=spmoulders@yahoo.co.in, c=IN Date: 2021.08.14 15:30:27 +05'30' CHANDAN KELEKAR Reg. No. CA/87/11009