ARCHITECT’S CERTIFICATE Date: 8th April 2021 To The Mahindra Lifespace Developers Ltd. Mahindra Towers ,5th floor, Dr G M Bhosale Marg, Worli, Mumbai 400018. Subject: Certificate of Percentage of Completion of Construction Work of 3 Nos. of Building (s) + Car park tower of the Project Mahindra ‘Vicino’ (Building 1- A1A2, Building 2 – A3A4, Building 3 – A5A6 & Car park tower). Vicino A1A2- [ RERA No : P51800022126 ] situated on the Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 demarcated by its boundaries 18.3 meter wide DP road to the east side, 13.4 meter wide road to the west side, Part abutting "Sethi Industries & Asha House" and part abutting I Zone to the north side, Part abutting "Dipti Classic" and part abutting I Zone to the south side of the plot. / Vicino A3A4- [ RERA No : P51800022067 ] situated on the Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 demarcated by its boundaries 18.3 meter wide DP road to the east side, 13.4 meter wide road to the west side, Part abutting "Sethi Industries & Asha House" and part abutting I Zone to the north side, Part abutting "Dipti Classic" and part abutting I Zone to the south side of the plot. / Vicino A5A6- [ RERA No : …….......] situated on the Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 demarcated by its boundaries 18.3 meter wide DP road to the east side, 13.4 meter wide road to the west side, Part abutting "Sethi Industries & Asha House" and part abutting I Zone to the north side, Part abutting "Dipti Classic" and part abutting I Zone to the south side of the plot. On Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 Gundavali village, Andheri Taluka, Mumbai, admeasuring 6739 sqm. area being developed by Mahindra Lifespace Developers Limited. Sir, I/We M/S Morphogenesis have undertaken assignment as Architect of certifying completion of Construction Work of 3 Nos. of Building (s) + Car park tower of the Project Mahindra ‘Vicino’ (Building 1- A1A2, Building 2 – A3A4, Building 3 – A5A6 + Car park tower). . Vicino A1A2- [ RERA No : P51800022126 ] situated on the Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 demarcated by its boundaries 18.3 meter wide DP road to the east side, 13.4 meter wide road to the west side, Part abutting "Sethi Industries & Asha House" and part abutting I Zone to the north side, Part abutting "Dipti Classic" and part abutting I Zone to the south side of the plot. / Vicino A3A4- [ RERA No : P51800022067 ] situated on the Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 demarcated by its boundaries 18.3 meter wide DP road to the east side, 13.4 meter wide road to the west side, Part abutting "Sethi Industries & Asha House" and part abutting I Zone to the north side, Part abutting "Dipti Classic" and part abutting I Zone to the south side of the plot. / Vicino A5A6- [ RERA No : …….......] situated on the Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 demarcated by its boundaries 18.3 meter wide DP road to the east side, 13.4 meter wide road to the west side, Part abutting "Sethi Industries & Asha House" and part abutting I Zone to the north side, Part abutting "Dipti Classic" and part abutting I Zone to the south side of the plot. On Plot bearing CTS No 247A, 247B, 243B/1, 243B/2 Gundavali village, Andheri Taluka, Mumbai, admeasuring 6739 sqm. area being developed by Mahindra Lifespace Developers Limited. 1. Following technical professionals are appointed by /Promoter: - (i) M/s Morphogenesis as Architect; (ii) M/s Whitby Wood Pritamdasani as Structural Consultant (iii) M/s Enersave as MEP Consultant (iv) M/s Gem Engserv as Quantity Surveyor. Based on site Inspection, with respect to each of the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Building 1 : Vicino A1A2 Vicino Percentage Completion as on April’2021 A1A2 Excavation 100% No. of basements 100% 01 No of Plinth 100% 00 number of Podiums NA 00 number of Stilt Floor 100% 15 number of Slabs of Super Structure 86.6% Internal walls, Internal Plaster, Floorings within Flats/Premises, 16.2% Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 46.3% Overhead and Underground Water Tanks The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Percentage Completion as on April’2021 Vicino A3A4 Excavation 100% No. of basements NA 01 No of Plinth 90% 00 number of Podiums NA 00 number of Stilt Floor 0% 14 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, 0% Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises 0% Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 0% Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of terraces with waterproofing of 0% the Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Percentage Completion as on April’2021 Vicino A5A6 Excavation 100% No. of basements NA 01 No of Plinth 70% 00 number of Podiums NA 00 number of Stilt Floor 0% 14 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, 0% Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises 0% Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 0% Overhead and Underground Water Tanks The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Table-B Internal & External Development Work in Respect of the entire registered buildings %COMPLETION %COMPLETION %COMPLETION DESCRIPTION A1A2 A3A4 A5A6 Internal Roads & Foot paths 50% 50% 50% Water Supply 5% 5% 5% Sewerage (chamber, lines, Septic Tank , STP) 5% 5% 5% Storm Water Drains 0% 0% 0% Landscaping & Tree Planting 5% NA 0% Street Lighting 0% 0% 0% Treatment and disposal of sewage and sullage water 5% NA NA Solid Waste management & Disposal 0% NA NA Water conservation, Rain water harvesting 10% NA NA Energy Management 0% 0% 0% Fire protection and fire safety 0% 0% 0% requirements Electrical meter room, sub-station, receiving station 10% 10% 10% Yours Faithfully Signature & Name of Architect