"A" PARKING STATEMENT CARPET AREA CALCULATION USER CATAGORY NO. OF CAR PARKING CAR PARKING TOTAL PROFORMA A CAR PARKING SQ. MT. FLATS REQUIRED PROVIDED PROVIDED I. AREA STATEMENT SQ.MTR. BELOW 45 - - - 1 Area of plot 665.50 2 3 RESID. R.W.P. R.W.P. 2.55 X 1.50 0.25 X 1.35 PROPOSED B/W 45 TO 60 - - - SLOPE SLOPE 1 FLAT NO.502 NO OF FLAT = 1 BUILDING B/W 60 TO 90 3.00 3.00 3.00 a) Area of Reservation in plot -- FLAT NO.101 NO OF FLAT = 1 1 FLAT NO.401 NO OF FLAT = 1 A 9.45 X 10.15 X 1 NO = 95.92 SQ.MT. b) Area of Road Set back -- 4.35 X 4.70 A 9.45 X 18.35 X 1 NO = 173.41 SQ.MT. 90 ABOVE 5.00 10.00 10.00 4.20 X 1.20 A 9.45 X 13.95 X 1 NO = 131.83 SQ.MT. 1 TOTAL ADDITION = 173.41 SQ.MT. X TOTAL ADDITION = 95.92 SQ.MT. X 8 FLAT c) Area of D P Road -- 5 TOTAL ADDITION = 131.83 SQ.MT. X 2.75 X 0.60 2 Deduction for. 7 4.35 X 3.50 2 A TOTAL 8.00 13.00 13.00 A) For Reservation/Road Area 4.20 X 1.20 DEDUCTIONS 4 DEDUCTIONS 0.10 X 8.20 DEDUCTIONS 9.45 X 10.15 a) Road set-back area to be handed over (100%) (Regulation No 16) -- 401 1 2.75 X 0.60 X 1 NO = 1.65 SQ.MT. VISITORS ( 5%) 0.65 0.65 1.15 X 11.55 1 4.35 X 4.70 X 1 NO = 20.45 SQ.MT. 502 b) Proposed D P road area to be handed over (100%) (Regulation No 16) -- 4 RERA C.A.- 106.97 sq.mt. 1 X 4.20 1.20 X 1 NO = 5.04 SQ.MT. 2 2.45 X 1.50 X 1 NO = 3.68 SQ.MT. A 2 2.55 X 1.50 X 1 NO = 3.83 SQ.MT. TOTAL PARKING REQUIRED 13.65 13.65 c) (i) Reservation area to be handed over (100%)( Regulation No 17) -- 6 0.25 X 3.50 A 2 X 0.10 8.20 X 1 NO = 0.82 SQ.MT. 7 RERA C.A.- 78.06 sq.mt. 3 0.15 X 1.50 X 1 NO = 0.23 SQ.MT. 9.45 X 18.35 3 0.25 X 1.35 X 1 NO = 0.34 SQ.MT. (ii)Reservation area to be handed over as per AR( Regulation No 17) -- 4.35 X 7.00 3 X 2.75 1.05 X 1 NO = 2.89 SQ.MT. 0.95 X 5.00 4 1.20 X 1.35 X 1 NO = 1.62 SQ.MT. SAY 14.00 NOS. 14.00 NOS. 28.00 TERRACE @ 6TH FLOOR LVL. 4 1.15 X 11.55 X 1 NO = 13.28 SQ.MT. 9.45 X 13.95 4 X 0.25 3.50 X 1 NO = 0.88 SQ.MT. 6 5 1.05 X 1.50 X 1 NO = 1.58 SQ.MT. R.W.P. 5 2.75 X 1.20 X 1 NO = 3.30 SQ.MT. B) For Amenity Area SLOPE 5 X 4.35 3.50 X 1 NO = 15.23 SQ.MT. 1.10 X 3.95 6 1.10 X 3.95 X 1 NO = 4.35 SQ.MT. 6 4.35 X 7.00 X 1 NO = 30.45 SQ.MT. 5 2 TOTAL DEDUCTION = 24.86 SQ.MT. Y1 7 0.95 X 5.00 X 1 NO = 4.75 SQ.MT. SUMMARY a) Area of amenity plot/plots to be handed over as per DCR 14(A) -- 7 4.20 X 1.20 X 1 NO = 5.04 SQ.MT. 1.05 X 1.50 101 TOTAL BUILT UP AREA [X - Y1] = 106.97 SQ.MT. X1 3 2.45 X 1.50 TOTAL DEDUCTION = 17.86 SQ.MT. Y1 B.U.A. b) Area of amenity plot/plots to be handed over as per DCR 14(B) -- TOTAL DEDUCTION = 76.69 SQ.MT. Y1 4 c) Area of amenity plot/plots to be handed over as per DCR 35 (abeyance) "C" "C" RERA C.A.- 96.72 sq.mt. 3 0.15 X 1.50 TOTAL BUILT UP AREA [X - Y1] = 78.06 SQ.MT. X1 FLOORS ( INCLUDING TOTAL -- TOTAL BUILT UP AREA [X - Y1] = 96.72 SQ.MT. X1 1.20 X 1.35 ST-CASE 2.75 X 1.05 AREA ) AREA R.W.P. SLOPE STILT.FLR C) Deductions for Existing Built up area to be retained if any /Land component 5 LINE DIAGRAM OF CARPET AREA FOR 4TH FLR. LINE DIAGRAM OF CARPET AREA FOR 5TH FLR. FLAT NO. 401 FLAT NO. 502 of Existing BUA as per regulation under which the development was allowed. -- 2.75 X 1.20 1ST.FLR 148.04 148.04 SCALE - 1:200 SCALE - 1:200 R.W.P. LINE DIA. OF CARPET AREA FOR 1ST FLR. 2ND.FLR 230.62 230.62 SLOPE FLAT NO. 101 C.T.S. NO. 3 Total deductions: [ 2(A) + 2(B) + 2(C) as and when applicable.] -- 1029 SCALE - 1:200 1 FLAT NO.402 NO OF FLAT = 1 3RD. FLR 230.62 230.62 665.50 NORTH 4 Balance area of plot (1 minus 3) LIFT M/C ROOM 2.75 X 0.60 A 9.45 X 13.35 X 1 NO = 126.16 SQ.MT. RERA CARPET AREA SUMMARY C.T.S. NO. 4TH. FLR 262.24 262.24 5 Plot area under Development 665.50 5.34 5.36 3.05X4.45 3 5.49 5.50 1028 2 TOTAL ADDITION = 126.16 SQ.MT. X CARPET AREA EXISTING 0.10 X 1.35 FLAT NO.201 & 301 NO OF FLATS = 2 STRUCTURE TO BE DEMOLISHED 5TH. FLR 127.15 127.15 6 Zonal (basic) FSI 1.00 2.70 X 1.50 A FLOORS FLAT NO. AS PER TOTAL NO. 4.18 6.33 1.50 1 A 9.45 X 18.35 X 1 NO = 173.41 SQ.MT. MAHARERA U.G. TANK FLUSED WITH 998.67 998.67 7 Built up Area as per Zonal (basic) FSI (5 X 6) 665.50 9.45 X 13.35 GROUND FLR. LVL. DESIGN TO TAKE VEHICLES LOAD TOTAL 4.35 X 4.70 TOTAL ADDITION = 173.41 SQ.MT. X DEDUCTIONS 4.14 PUMP RM (In case of Mill land permissible BUA kept in abeyance) -- 1ST FLR. 101 96.72 1 6 402 1 X2.75 0.60 X 1 NO = 1.65 SQ.MT. NET B.U.A. PROPOSED = 824.66 SQ.MTS. 8 BUA equal to area of land handed over as per reg. 30(A) 3.90 6.52 -- 7 0.95 X 1.05 RERA C.A.- 97.75 sq.mt. 2 X4.45 3.35 X 1 NO = 14.91 SQ.MT. 2ND & 3RD FLR. 201 & 301 96.70 2 C.T.S. NO. LIFT 6.70 C.T.S. NO. FUNGIBLE AREA PROPOSED = 174.01 SQ.MTS. DEDUCTIONS 5 95 ENTRANCE EXISTING 1022 i) As per 2(A) and 2(B) except 2(A)(c) (ii) above with in cap of "Admissible TDR" WEST EAST LIFT STRUCTURE TO 4.20 X 1.20 3 X4.30 1.20 X 1 NO = 5.16 SQ.MT. -"- 202 & 302 78.07 2 BE DEMOLISHED 1 4.35 X 4.70 X 1 NO = 20.45 SQ.MT. 2.05 X 2.45 as column 6 of Table -12 on remaining/balance plot.) -- 4 4 4 X4.45 0.15 X 1 NO = 0.67 SQ.MT. 3.72 UP T 2 2.70 X 1.50 X 1 NO = 4.05 SQ.MT. T 4TH FLR. 401 106.97 1 7.67 ii)in case of 2(A)(c) (ii) permissible over and above permissible BUA on remaining/ F.R.D. 1.15 X 11.55 3 5 X2.05 2.45 X 1 NO = 5.02 SQ.MT. STATEMENT FOR EXISTING B.U.A. AND CORRESPONDING PROPOSED FUNGIBLE AREA 3 0.10 X 1.35 X 1 NO = 0.14 SQ.MT. 4.45 X 0.15 3.62 4.75 A 4.30 X 1.20 STILT + 1ST TO 4TH & AS PER OCC PLANS ISSUED U/ NO. CE/7779/BSII/AK/DATED 11/06/1982 balance plot. -- 6 X0.95 1.05 X 1 NO = 1.00 SQ.MT. -"- 402 97.75 1 1.50 6 4 1.15 X 11.55 X 1 NO = 13.28 SQ.MT. 5TH (PT)UPPER FLOORS DN 5.33 6.59 EXISTING B.U.A. = 657.12 SQ. MTS. 4.35 X 7.00 9.45 X 18.35 2 TOTAL DEDUCTION = 28.41 SQ.MT. Y1 T EXISTING B.U.A. FUNGI.= 299.99 SQ. MTS. 9 Incentive bua in lieu of rehab component (15% of 6b above ) = 98.56 & 10 X 10 = 100 657.12 -- 5 2.75 X 1.20 X 1 NO = 3.30 SQ.MT. 5TH FLR. 502 78.06 1 3.10 O/H WATER TANK 6 4.35 X 7.00 X 1 NO = 30.45 SQ.MT. 4.45 X 3.35 TOTAL BUILT UP AREA [X - Y1] = 97.75 SQ.MT. X1 3.66 6.64 or 10 sq.mts. per tenament or 50% of rehab component as per reg. 33 (7)(B) (1) 100.00 4.55 4.50 TOTAL 8 T st-case area of Existing Bldg. Clamied free of f.s.i. by paying premium 33 (7)(B) (2) 31.69 1.50 7 4.20 X 1.20 X 1 NO = 5.04 SQ.MT. T T SLIDING GATE T T 1.50 1.75 1.50 TOTAL DEDUCTION = 76.71 SQ.MT. Y1 LINE DIAGRAM OF CARPET AREA FOR 4TH FLR. SOUTH 10 Built up area due to "Additional FSI on Payment of Premium" as per Table No 12 of 201 & 301 FLAT NO. 402 12.20 (40'0") M. W. MALAVIYA ROAD Regulation NO 30(A) on remaining / balance plot. TOTAL BUILT UP AREA [X - Y1] = 96.70 SQ.MT. X1 RERA C.A.- 96.70 sq.mt. SCALE - 1:200 Built up area due to admissible "TDR" as per Table No 12 of Regulation NO 30(A) COLUMN AREA CALCULATION .63 11 16 and 32 on remaining/ balance plot. (PERMISSIBLE 465.85 (70% TDR)) FOR COLUMN ON 2ND, 3RD & 5TH FLOOR BLOCK PLAN (SLUM TDR = 230.00 (DRC NO. SRA/1326/CONST.) + 463.36 TERRACE @ BELOW FLOOR LVL. BUILT UP AREA CALCULATION 1 "B" 5 X 0.15 X 0.23 X 1 NO = 0.03 SQ.MT. SCALE :- 1:500 (GENERAL TDR = 233.36 OUT OF DRC NO. 000962 & DRC NO. 000771 ) 2 FLAT NO.501 NO OF FLAT = 1 TOTAL ADDITION = 0.03 SQ.MT. 12 Permissible Built up Area {as the case may be with / without BUA as per 2(c)} 1260.55 1228.86 2.75 X 1.20 40 2.70 X 1.50 A 9.45 X 18.65 X 1 NO = 176.24 SQ.MT. TOTAL ADDITION = 0.03 X 3 FLRS. = 0.09 SQ.MT. A .59 13 Proposed Built up Area 824.66 LINE DIA. OF CARPET AREA FOR 2ND & 3RD FLR. 1 TOTAL ADDITION = 176.24 SQ.MT. X FLAT NO. 201 & 301 SITE U/R 14 TDR generated if any as per Regulation No 30(A) -- 4.35 X 4.70 FOR COLUMN ON 4TH FLOOR SCALE - 1:200 .82 6.51 15 Fungible Compensatory Area as per Regulation No 31(3) 34.79 X1 0.05 X 0.23 X 1 NO = 0.01 SQ.MT. DEDUCTIONS 38 3 "B" 7 -"- 0.10 X 0.08 X 1 NO = 0.01 SQ.MT. a) i) Perm. Fungible Compensatory area for Rehab Comp.w/o charging premium. 229.99 232.93 1 X4.35 4.70 X 1 NO = 20.45 SQ.MT. 8 657.12 X 0.35 36.0 FLAT NO.202 & 302 NO OF FLATS = 2 40 4.20 X 1.20 3 TOTAL ADDITION = 0.02 SQ.MT. B ii)Fungible Compensatory area availed for Rehab comp.w/o charging premium. 174.01 1 2 X2.70 1.50 X 1 NO = 4.05 SQ.MT. .28 A 9.45 X 10.15 X 1 NO = 95.92 SQ.MT. 0.10 X 12.90 b) i) Permissible Fungible Compensatory area by charging premium. 6 3 0.10 X 12.90 X 1 NO = 1.29 SQ.MT. FOR COLUMN ON 2ND TO 4TH FLOOR 7 4 2.75 X 0.60 TOTAL ADDITION = 95.92 SQ.MT. X AD 6 - A RO 1 4.35 X 3.50 4 X2.75 1.05 X 1 NO = 2.89 SQ.MT. Y 0.025 X 0.75 X 1 NO = 0.16 SQ.MT. AL 3.08 5.09 5.4 202 & 302 AJ M ii)Fungible Compensatory area availed on payment of premium. - 9.45 X 18.65 5 X0.25 3.50 X 1 NO = 0.88 SQ.MT. TOTAL ADDITION = 0.16 SQ.MT. 2 RERA C.A.- 78.07 sq.mt. 5 3 16 Total Built up Area proposed including FCA [13+15(a)(ii) ] 998.67 DEDUCTIONS 5 501 6 X4.35 3.50 X 1 NO = 15.23 SQ.MT. TOTAL ADDITION = 0.16 X 3 FLRS. = 0.48 SQ.MT. C D LINE DIAG. OF PLOT 1.09 2.36 0.50 RERA C.A.- 126.41 sq.mt. OA 6 A 1 2.75 X 0.60 X 1 NO = 1.65 SQ.MT. 7 X4.20 1.20 X 1 NO = 5.04 SQ.MT. R 17 FSI consumed on Net Plot [13/4] 1.24 0.25 X 3.50 FOR COLUMN ON 2ND TO 4TH FLOOR VI YA SCALE :- 1:500 2 2.45 X 1.50 X 1 NO = 3.68 SQ.MT. LA 0.95 X 1.05 9.45 X 10.15 TOTAL DEDUCTION = 49.83 SQ.MT. Y1 .M A II. OTHER REQUIREMENTS Z 0.105 X 0.75 X 1 NO = 0.08 SQ.MT. .W PLOT AREA CALCULATION 4.45 X 0.15 5 3 4.45 X 0.15 X 2 NOS = 1.34 SQ.MT. TOTAL BUILT UP AREA [X - Y1] = 126.41 SQ.MT. X1 ") M (A) Reservation/ Designation TOTAL ADDITION = 0.08 SQ.MT. 0'0 2.05 X 2.45 4 4.30 X 1.20 X 1 NO = 5.16 SQ.MT. 0 (4 1 1/2 X 40.59 X 16.63 X 1 NO = 337.51 SQ.MT. 3 TOTAL ADDITION = 0.16 X 3 FLRS. = 0.24 SQ.MT. D 1 2. 2 (a) Name of Reservation 5 2.05 X 2.45 X 1 NO = 5.02 SQ.MT. 2 1/2 X 40.59 X 0.50 X 1 NO = 10.15 SQ.MT. 4 2 (b) Area of Reservation land to be handed/ handed over as per Regulation No.17 6 0.95 X 1.05 X 1 NO = 1.00 SQ.MT. FOR COLUMN ON 5TH FLOOR 3 1/2 X 40.28 X 2.36 X 1 NO = 47.53 SQ.MT. 4.30 X 1.20 2.45 X 1.50 (c) Built up area of Amenity to be handed over as per Regulation no. 17 TOTAL DEDUCTION = 17.85 SQ.MT. Y1 Z 0.07 X 0.75 X 1 NO = 0.05 SQ.MT. 4 1/2 X 38.82 X 5.41 X 1 NO = 105.01 SQ.MT. 3 4 (d) Area/Built up Area of Designation "A" TOTAL BUILT UP AREA [X - Y1] = 78.07 SQ.MT. X1 TOTAL ADDITION = 0.05 SQ.MT. E 5 1/2 X 36.51 X 1.09 X 1 NO = 19.90 SQ.MT. 4.45 X 0.15 2.75 X 1.05 A 6 1/2 X 36.08 X 5.09 X 1 NO = 91.82 SQ.MT. (B) Plot area/Built up Amenity to be Handed Over as per Regulation No. 0.25 X 1.30 7 1/2 X 34.79 X 3.08 X 1 NO = 53.58 SQ.MT. (a) 14(A) LINE DIAGRAM OF CARPET AREA FOR 5TH FLR. LINE DIAGRAM OF CARPET AREA FOR 2ND & 3RD FLR. FLAT NO. 501 TOTAL ADDITION A+B+C+D+E = 0.88 SQ.MT. LOCATION PLAN TOTAL ADDITION = 665.50 SQ.MT. (b) 14(B) TERRACE FLOOR PLAN FLAT NO. 202 & 302 SCALE - 1:200 LINE DIA.OF COMMAN AREA @ 1ST TO SCALE :- 1:4000 (c) 15 SCALE - 1:200 0.15 (C)Requirement of LOS as per Regulation No.27(15% or 20% or 25%) SCALE :- 1:100 5TH FLOOR 0.15 M. SLOPE GRD LVL. (D)Tenement Statement SCALE :- 1:100 (a) Proposed built up area (13 above) 2.00 (b) Less deduction of Non-residential area (Shop etc.) COMMAN AREA @ 1ST TO 5TH FLOOR 2.00 2.30 GRD LVL (c)Area available for tenements [(i) minus (ii).] C.T.S. NO. A 0.25 X 1.30 X 1 NO = 0.33 SQ.MT. (d)Tenements permissible (450/hectare) = 29.95 SAY = 30.00 30.00 1029 TOTAL ADDITION = 0.33 SQ.MT. (e) Total number of Tenements proposed on the plot 8.00 "A" TOTAL ADDITION = 0.33 X 5 FLRS. = 1.65 SQ.MT. A (E)Parkign Statement NORTH (i) __Parking required by Regulations for - 14.00 SECTION THRO' SUCTION TANK SECTION THRO' 0.58 0.61 Car 13.00 1.60 SCALE : 1:100 COMPOUND WALL Scooter/Motor cycle C.T.S. NO. SCALE : 1:100 Outsiders (visitors) 0.65 3.18 3.96 3.21 3.93 1028 "A" "A" "A" 10.40 "A" 10.40 (ii) Covered garage permissible STACK PARKING 0.15 0.15 0.10 (iii) Covered garages proposed 5.34 5.36 S.P. 0.10 5.25 10.40 0.40 3.65 2.45 3.65 0.40 3.65 2.45 3.65 BLDG. LINE @ 0.15 0.10 Car B.P. 0.40 3.80 2.45 3.65 0.60 0.60 0.60 0.60 0.60 0.60 2ND TO 9TH FLR. BLDG. LINE @ 2ND TO 9TH FLR. BLDG. LINE @ Scooter/Motor cycle 9TH FLR. 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA S.P. S.P. B.P. B.P. Outsiders (visitors) BLDG. LINE @ 2ND TO 9TH FLR. 25 1.40 M. W. CANTI. PROJ. 0.75 M.W. CHAJJA 1.40 M. W. CANTI. PROJ. 1.40 M. W. CANTI. PROJ. 0.75 M.W. CHAJJA 1.40 M. W. CANTI. PROJ. 1.40 M. W. CANTI. PROJ. 0.75 M.W. CHAJJA 1.40 M. W. CANTI. PROJ. (iv) Total parking provided 28.00 3.40 BOREWELL Y 0.80 M. W. Z Y 0.80 M. W. Z 0.80 M. W. Z (F)Transport Vehicles Parking 22 23 9.75 24 26 27 28 COLUMN COLUMN COLUMN COLUMN CANTI. PROJ. COLUMN CANTI. PROJ. CANTI. PROJ. 4.18 H G 6.33 COUNTED IN F.S.I. 0.025X0.75 COUNTED IN F.S.I. 0.105X0.75 COUNTED IN F.S.I. 0.025X0.75 COUNTED IN F.S.I. 0.105X0.75 COUNTED IN F.S.I. 0.07X0.75 (i) Spaces for transport vehicles parking required by Regulations 1.50 BED ROOM BED ROOM BED ROOM BED ROOM BED ROOM BED ROOM 3.35X3.65 3.35X3.65 (ii) Total No. of transport vehicles parking spaces provided 1.63 EXISTING 1.34 KITCHEN 3.35X3.65 KITCHEN 3.35X3.65 KITCHEN 3.35X3.65 3.35X3.65 2.45X3.35 5.45 5.45 5.45 STRUCTURE 2.45X3.35 2.45X3.35 ALREADY DEMOLISHED PROFORMA B 4.05 U.G. TANK FLUSED WITH ELE. ON 3RD FLR. 3.00 GROUND FLR. LVL. DESIGN TO TAKE VEHICLES LOAD ELE. ON 3RD FLR. 0.34 0.34 0.34 CONTENTS OF SHEET TOILET TOILET DUCT DUCT DUCT 8.95 FIRE FIGHTING DUCT DUCT DUCT TOILET 0.90X TOILET TOILET TOILET S.S. S.S. S.S. 0.90x 0.90x 0.90X 0.90x 0.90X STILT FLR. PLAN, 1ST TO 5TH FLR. PLANS, TERRACE FLR. PLAN, SECTIONS,AREA CALC., BLOCK PLAN & LOCATION PLAN TANK 7.40 2.30X1.35 1.50 1.50 2.30X1.35 2.30X1.35 1.50 1.50 2.30X1.35 2.30X1.35 1.50 1.50 2.30X1.35 10.45 10.45 2.45 X 1.20 2.45 X 1.20 2.45 X 1.20 I 6.48 1.20 1.20 1.20 4.14 0.80 DOUBLE HIEGHT 0.95 NOTES :- F 0.95 0.95 0.34 M.W. CHAJJA 0.34 M.W. CHAJJA 0.34 M.W. CHAJJA SERV. TOIL. PUMP RM W. C. W. C. W. C. BLDG. LINE @ 9TH FLR 1.05 1.50X0.90 1.85X0.90 1.05 S.S. 1.35X0.90 1.05 X1 S.S. 1.35X0.90 1.05 S.S. 1.35X0.90 ALL DIMENSIONS ARE IN METERS 2.79 4.91 J 1.20 X LIVING COLUMN LIVING X LIVING 4.11 COLUMN 1.10 7.00X3.35 COUNTED IN F.S.I. 0.05X0.23 1.20 7.00X3.35 COLUMN 1.10 7.00X3.35 APPROVAL OF PLANS COUNTED IN F.S.I. 0.10X0.08 0.40x COUNTED IN F.S.I. 1.20 M.W. 1.20 M.W. BLDG. LINE @ 0.40x 0.40x "C" "C" "C" "C" "C" 0.15X0.23 "C" "C" 2.30 "C" "C" 0.15X0.23 "C" THIS DOCUMENT IS DIGITALLY SIGNED AND NO PHYSICAL SIGN IS REQUIRED. 2.30 2.30 2.30 2.30 4TH FLR. 21 S.P. 0.08 10.40 2.30 2.30 6.08 B.P. 19 20 202 CHAJJA CHAJJA 1.05X2.30 APPROVED SUBJECT TO THE CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER AUTODCR DOMESTIC WATER 0.25 BLDG. LINE @ 2ND, 3RD, 5TH,6TH & 8TH FLR. TANK 0.40 4.75 2.40 2.60 402 502 FILE No. CHE/WS/4458/K/E/337(NEW) DATE : 03/09/2019 4.04 6.08 2.15 STACK PARKING 2.20 302 2.20 2.20 THIS CANCELS APPROVAL TO THE PREVIOUS PLANS SANTIONED UNDER NO. 3.90 K 6.52 F.R.D. 18.35 E 1.50 0.15 M. W. 0.15 M. W. 0.50 0.35 CHE/WS/4458/K/E/337(NEW) DATED - 16/03/2019 6.68 F.R.D. F.R.D. TOILET 1.50 1.50 DUCT DUCT TOILET 1.65 TOILET 1.65 6.00 2.55X1.50 2.55X1.50 2.55X1.50 LIFT FLUSHING WATER LIFT 2.30X1.35 LIFT 2.30X1.35 LIFT 2.30X1.35 CANTI. PROJ. LIFT 18.35 PLANS FOR APPROVAL CANTI. PROJ. TANK 2.15X2.00 2.15X2.00 2.15X2.00 2.15X2.00 2.15X2.00 6.70 DUCT D BLDG. LINE @ 7.60 C.T.S. NO. 1ST FLR. C.T.S. NO. 1.05 6.55 4.75 CANOPY 4.75 4.75 4.75 4.75 0.40 M.W. CHAJJA 95 ENTRANCE EXISTING 1022 LOBBY STRUCTURE LOBBY BED ROOM LOBBY LOBBY BED ROOM LOBBY 2.05X5.90 4.25X4.55 BED ROOM 4.85 LIFT ALREADY DEMOLISHED LIFT 2.05X5.90 3.95X3.05 LIFT 2.05X5.90 LIFT 2.05X5.90 5.00X3.05 LIFT 2.05X5.90 2.15X2.00 2.15X2.00 3.95X3.05 2.15X2.00 2.15X2.00 2.15X2.00 0.45M WIDE M. S. 0.45M WIDE M. S. 0.45M WIDE M. S. 0.45M WIDE M. S. WEST EAST CHEQUERED CHEQUERED CHEQUERED CHEQUERED PLATFORM FOR E.D. PLATFORM FOR E.D. PLATFORM FOR E.D. PLATFORM FOR E.D. Digitally signed by SAWANT RAMCHANDRA SAWANT Prakash A/C UNITS. A/C UNITS. A/C UNITS. A/C UNITS. Digitally signed by Prakash Rajaram Rasal L Balwant SAMPATRAO DN: c=IN, o=Municipal Corporation of 27.45 27.45 DN: c=IN, o=MUNICIPAL CORPORATION OF Greater Mumbai, ou=Building Proposal, 3.76 27.75 27.75 2.40 6.06 Digitally signed by Balwant Sukdeo Pawar DN: c=IN, o=Municipal Corporation of Greater GREATER MUMBAI, postalCode=400050, st=Maharashtra, W.R. W.R. W.R. W.R. 1.45 RAMCHANDRA Rajaram 2.5.4.20=4dd8b645eb68c9ba3596daa1f2 7.64 Mumbai, ou=Building Proposal Dept. (WS)-1, 2.5.4.20=9d11a56829cbe3669f9dbaf34df88bec 2.55 2.40 401 Sukdeo postalCode=400050, st=Maharashtra, d576b2064701191c053614d3e4a85e601 1.30 1.30 F.R.D. 1.30 F.R.D. 2.40 2.40 1.30 CHAJJA F.R.D. CHAJJA CHAJJA CHAJJA f2e56e94fbc55ee0b0ea304eedb1074c, ou=DY F.R.D. 2.5.4.20=cb4c3ee99d907553c9dba22af6a53d e78d5, 7.90 6.14 101 201 1.30 3689310974ce180a7544c70ca438907d7d, CH E B P SPL CELL,CID - 6302637, serialNumber=bcdd79d619cfdf599b673 Rasal serialNumber=2767a48face0bbaa93bd92e34 SAMPATRAO b9c0ff942e547a856c50c073dca6a97a89 postalCode=400072, st=Maharashtra, 2.80 7a5c908e7d5f089015d5b4a1fc9dfade9fff668, Pawar 1.20 M.W. CHAJJA 1.20 M.W. CHAJJA 44163cad1, cn=Prakash Rajaram Rasal UP 2.80 2.80 cn=Balwant Sukdeo Pawar cn=SAWANT RAMCHANDRA SAMPATRAO 1.05 M. W. CANTI. PROJ. M ELEC.METER PANEL Date: 2019.08.14 13:12:13 +05'30' Date: 2019.09.03 08:37:55 +05'30' Date: 2019.08.29 20:45:15 +05'30' 3.72 0.40 M.W. CHAJJA B.P. 16 17 18 F.R.D. F.R.D. 301 F.R.D. F.R.D. 0.40 M. W. CANTI. PROJ. 0.40 M. W. CANTI. PROJ. 0.40 M. W. CANTI. PROJ. 0.40 M. W. CANTI. PROJ. 4.75 A.E. (B.P) WS K/E E.E. (B.P) WS (K) WARD 0.60 M.W. CHAJJA 3.50 0.60 M.W. CHAJJA 0.60 M.W. CHAJJA 4.75 4.75 4.75 4.75 S.E. (B.P.) KW S1 1.50 1.50 1.50 1.50 1.50 11.25 11.25 11.25 11.25 1 PIT + 2 STACK UP UP UP UP CERTIFICATE OF AREA 3.50 3.10 BLDG. LINE @ 7.68 3.50 3.10 3.10 3.50 3.10 LIV/DIN 3.50 3.10 4TH TO 9TH FLR. Digitally signed 1.50 1.50 1.75 1.50 B.P. 13 14 15 1.50 1.50 1.75 1.50 LIV/DIN 3.95X8.05 0.60 M.W. CHAJJA 1.50 1.50 1.75 1.50 LIV/DIN 3.95X8.05 1.50 1.50 1.75 1.50 5.00X6.85 1.50 1.50 1.75 1.50 CERTIFIED THAT THE PLOT UNDER REFERENCE WAS SURVERYED BY ME ON 10-4-2014 AND THAT THE DIMENSIONS OF THE SIDES ETC. OF Saumil by Saumil Ashwin Jhaveri 18.65 18.65 Ashwin 3.22 THE PLOT STATED ON THE PLANS ARE AS MEASURED ON SITE N Date: 0.40 M.W. CHAJJA 3.62 1 PIT + 2 STACK AND THE AREA SO WORKED OUT IS 665.50 SQ.MT. AND TALLIES 1.30 M. W. CANTI. PROJ. 1.81 5.00 0.90 2019.08.12 WITH THE AREA STATED IN THE DOCUMENTS OF OWNERSHIP/ Jhaveri 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA T. P. S. RECORD/CITY SURVEY RECORD. 17:33:58 BLDG. LINE @ PART TERRACE @ 5TH FLOOR LVL. +05'30' 4TH & 5TH FLR. "B" "B" "B" "B" "B" COLLAPSIBLE DOOR B.P. 10 11 12 STUDY 3.35 BLDG. LINE @ 3.35 3.35 3.35 4.05X3.35 8.12 BLDG. LINE @ 1ST TO 3RD FLR. DESCRIPTION OF THE PROPOSAL & PROPERTY 4.02 1ST TO 3RD FLR. 1 PIT + 2 STACK BLDG. LINE @ 2.80X1.20 TOILET 6TH TO 9TH FLR. 2.05X1.10 4.35 0.25 1 PIT + 2 STACK 1 PIT + 2 STACK 1 PIT + 2 STACK 3.32 5.33 O 1.55 1.15 6.59 1.60 x 0.15 1.60 x 0.15 1.15 1.60 x 0.15 C 0.45 0.45 0.45 DUCT DUCT DUCT DUCT DUCT DUCT "B" "B" TOILET TOILET "B" TOILET 3.50X1.05 TOILET "B" TOILET 0.90x 3.50X1.05 TOILET "B" S.S. S.S. S.S. 3.50X1.05 PROPOSED PLANS FOR RESIDENTIAL BUILDING ON PROPERTY 2.30X1.35 0.90x 2.30X1.35 0.90x 2.30X1.35 1.50 1.50 0.90x 2.30X1.35 1.50 0.90x 2.30X1.35 0.90x 2.30X1.35 BEARING C.T.S. NO. 1021, 1021/1 TO 4 OF VILLAGE VILE PARLE (EAST), S.P. S.P. S.P. 1.10 0.30 1.10 0.30 1.10 0.30 F. P. NO. 96 OF TPS II, VILE PARLE (EAST), AT MALVIYA ROAD, 4.05 1 4 7 4.05 VILE PARLE (EAST), IN K/EAST WARD, MUMBAI - 400 057. KITCHEN KITCHEN 5.75 5.75 5.75 5.75 2 5 8 KITCHEN 6.05 6.05 2.45X3.05 2.45X3.05 2.45X3.50 3 6 9 BED ROOM BED ROOM BED ROOM BED ROOM BED ROOM BED ROOM NAME & SIGNATURE OF OWNER / APPLICANT 3.35X3.95 3.35X3.95 3.35X3.95 3.35X3.95 3.35X4.25 3.35X4.25 3.66 A 9.75 B 6.64 0.50 M. W. CANTI. PROJ. ELE. ON 3RD FLR. 0.50 M. W. CANTI. PROJ. ELE. ON 3RD FLR. 0.95 M. W. SHRI. KAVINDRA R. SHAH & SHRI. JIGNESH J. SHAH KAVINDRA JIGNESH RATILAL BLDG. LINE @ 1ST TO 3RD FLR. 0.75 M.W. CANTI. PROJ. PARTNERS OF SIDDHI SUNDER R.R. LLP JAYENDRA 1.20 1.20 BLDG. LINE @ 0.75 M.W. CHAJJA CHAJJA 6.03 C.A. TO SUNDER NIWAS CHSL. SHAH 0.75 M.W. SHAH 4TH & 5TH FLR. 1.05 1.05 BLDG. LINE @ BLDG. LINE @ 1ST TO 3RD FLR. BLDG. LINE @ 1ST TO 3RD FLR. 1.70 M. W. CANTI. PROJ. 1.70 M. W. CANTI. PROJ. 1.70 M. W. CANTI. PROJ. 1.70 M. W. CANTI. PROJ. CHAJJA 6TH TO 8TH FLR. 2.00 M. W. CANTI. PROJ. 2.00 M. W. CANTI. PROJ. 4.55 4.50 BLDG. LINE @ BLDG. LINE @ BLDG. LINE @ 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA Digitally signed by Digitally signed by 4TH TO 9TH FLR. 9TH FLR. 4TH TO 9TH FLR. 0.75 M.W. CHAJJA 0.75 M.W. CHAJJA ADDRESS:- KAVINDRA RATILAL JIGNESH JAYENDRA 2.83 0.65 3.65 2.45 3.65 SHAH 0.65 3.65 2.45 3.65 SHAH 2.55 2.50 10.40 0.65 3.65 2.45 3.65 5.15 2.70 2.55 FLAT NO. 7, 2ND FLOOR, MANI BHAVAN SHRADDHANAND ROAD Date: 2019.08.12 "A" 10.40 10.40 10.40 Date: 2019.08.12 1.80 1.75 "A" "A" "A" "A" EXTENSION, VILE PARLE (EAST), MUMBAI - 400 057. 17:31:38 +05'30' 17:32:57 +05'30' SLIDING GATE 1ST FLOOR PLAN TYP. 2ND & 3RD FLOOR PLAN NAME, ADD. & SIGNATURE OF ARCHITECT. SOUTH SCALE :- 1:100 SCALE :- 1:100 4TH FLOOR PLAN 5TH FLOOR PLAN STILT FLOOR PLAN Digitally signed Saumil SCALE :- 1:100 SCALE :- 1:100 SCALE :- 1:100 by Saumil Ashwin Jhaveri 12.20 (40'0") M. W. MALAVIYA ROAD Ashwin Date: 2019.08.12 Jhaveri BIG PARK -14 17:33:37 SMALL PARK -14 +05'30' TOTAL =28 SHEET NO. CHE/WS/4458/K/E/337(NEW) 2 of 2 3 2 2 2 2 Y Z Y Z Y Z 0.25 X 2.45 X 0.60 2.45 X 0.60 2.45 X 0.60 COLUMN COLUMN COLUMN COLUMN COLUMN COLUMN 2.40 X 1.50 1.65 COUNTED IN F.S.I. COUNTED IN F.S.I. COUNTED IN F.S.I. COUNTED IN F.S.I. COUNTED IN F.S.I. COUNTED IN F.S.I. 0.025X0.75 0.105X0.75 0.025X0.75 0.105X0.75 0.025X0.75 0.105X0.75 1 1 BUILT UP AREA CALCULATION 1 1 0.40 X BUILT UP AREA CALCULATION 4.75 0.55 X 2ND & 3RD FLOOR 0.55 X 0.55 X 5.45 4TH FLOOR 5.45 A 10.40 X 27.45 X 1 NO = 285.48 SQ.MT. 5.45 A 10.40 X 27.75 X 1 NO = 288.60 SQ.MT. X 0.15 X 0.23 X 1 NO = 0.03 SQ.MT. Y 0.025 X 0.75 X 1 NO = 0.02 SQ.MT. Y 0.025 X 0.75 X 1 NO = 0.02 SQ.MT. Z 0.105 X 0.75 X 1 NO = 0.08 SQ.MT. 8 3 Z 0.105 X 0.75 X 1 NO = 0.08 SQ.MT. X1 0.05 X 0.23 X 1 NO = 0.01 SQ.MT. 2.80 X 1.30 11 TOTAL ADDITION = 285.61 SQ.MT. X 10 0.10 X -"- 0.10 X 0.08 X 1 NO = 0.01 SQ.MT. 1.50 X 10.45 1.50 X 0.90 8 X1 1.05 TOTAL ADDITION = 288.72 SQ.MT. X X DEDUCTIONS COLUMN 1.50 X 1.05 COLUMN COUNTED IN F.S.I. 1 0.55 X 5.45 X 1 NO = 3.00 SQ.MT. 0.05X0.23 DEDUCTIONS 4 COUNTED IN F.S.I. 0.15X0.23 0.10X0.08 9 A 10 2 2.45 X 0.60 X 1 NO = 1.47 SQ.MT. A 1 0.55 X 5.45 X 1 NO = 3.00 SQ.MT. 7 10.30 X 18.35 1.15 X 2.60 X 2.30 A 1.40 X 2.45 11.25 3 0.10 X 10.45 X 1 NO = 1.05 SQ.MT. 2 2.45 X 0.60 X 1 NO = 1.47 SQ.MT. 2.60 X 2.30 A 10.40 X 27.45 4 1.15 X 11.25 X 1 NO = 12.94 SQ.MT. 10.40 X 27.75 3 0.10 X 21.70 X 1 NO = 2.17 SQ.MT. 5 2.45 X 1.20 X 1 NO = 2.94 SQ.MT. 4 2.45 X 1.05 X 1 NO = 2.57 SQ.MT. 10.40 X 18.65 6 0.65 X 5.75 X 1 NO = 3.74 SQ.MT. 5 0.65 X 6.05 X 1 NO = 3.93 SQ.MT. 3 7 5.00 X 3.35 X 1 NO = 16.75 SQ.MT. 6 0.90 X 3.35 X 1 NO = 3.02 SQ.MT. 2.45 X 1.50 9 8 2.80 X 1.30 X 1 NO = 3.64 SQ.MT. 7 2.80 X 1.30 X 1 NO = 3.64 SQ.MT. 8 3 7 0.40 X 9 0.40 X 4.75 X 1 NO = 1.90 SQ.MT. 8 0.40 X 4.75 X 1 NO = 1.90 SQ.MT. 6 4.75 0.40 X 0.10 X 10 2.60 X 2.30 X 1 NO = 5.98 SQ.MT. 4.75 9 1.40 X 2.45 X 1 NO = 3.43 SQ.MT. 0.40 X 5.00 X 3.35 21.70 11 1.50 X 1.05 X 1 NO = 1.58 SQ.MT. 10 1.50 X 0.90 X 1 NO = 1.35 SQ.MT. 4.75 TOTAL DEDUCTION = 54.99 SQ.MT. Y1 TOTAL DEDUCTION = 26.48 SQ.MT. Y1 TOTAL BUILT UP AREA [X - Y1] = 230.62 SQ.MT. X1 TOTAL BUILT UP AREA [X - Y1] = 262.24 SQ.MT. X1 8 7 5 2.80 X 1.30 2.80 X 1.30 4 2.80 X 1.30 5.15 X 7.90 6 4 0.65 X 5.75 1.15 X 11.25 5 12 2.45 X 1.20 0.90 X 0.15 LINE DIAG. OF 5TH FLOOR LINE DIAG. OF 1ST FLOOR SCALE :- 1:100 7 6 SCALE :- 1:100 5.00 X 3.35 0.90 X BUILT UP AREA CALCULATION 3.35 BUILT UP AREA CALCULATION 5TH FLOOR 1ST FLOOR A 10.30 X 18.35 X 1 NO = 189.01 SQ.MT. A 10.40 X 18.65 X 1 NO = 193.96 SQ.MT. X 0.15 X 0.23 X 1 NO = 0.03 SQ.MT. TOTAL ADDITION = 193.96 SQ.MT. X Z 0.07 X 0.75 X 1 NO = 0.05 SQ.MT. TOTAL ADDITION = 189.09 SQ.MT. X DEDUCTIONS 1 4.75 X 1 NO 0.40 X = 1.90 SQ.MT. DEDUCTIONS 2 1.50 X 1 NO 2.40 X = 3.60 SQ.MT. 6 5 1 0.55 5.45 X 1 NO X = 3.00 SQ.MT. 3 1.65 X 1 NO 0.25 X = 0.41 SQ.MT. 0.65 X 2 2.45 0.60 X 1 NO X = 1.47 SQ.MT. 0.65 X 4 11.25 X 1 NO 1.15 X = 12.94 SQ.MT. 5.75 6.05 3 2.45 1.50 X 1 NO X = 3.68 SQ.MT. 5 1.20 X 1 NO 2.45 X = 2.94 SQ.MT. 4 5.15 7.90 X 1 NO X = 40.69 SQ.MT. 6 5.75 X 1 NO 0.65 X = 3.74 SQ.MT. 5 5 2.80 1.30 X 1 NO X = 3.64 SQ.MT. 7 3.35 X 1 NO 5.00 X = 16.75 SQ.MT. 2.45 X 1.20 4 6 0.40 4.75 X 1 NO X = 1.90 SQ.MT. 8 1.30 X 1 NO 2.80 X = 3.64 SQ.MT. 2.45 X 1.05 7 2.60 2.30 X 1 NO X = 5.98 SQ.MT. TOTAL DEDUCTION = 45.92 SQ.MT. Y1 8 1.50 1.05 X 1 NO X = 1.58 SQ.MT. TOTAL BUILT UP AREA [X - Y1] = 148.04 SQ.MT. X1 LINE DIAG. OF 2ND & 3RD FLOOR LINE DIAG. OF 4TH FLOOR TOTAL DEDUCTION = 61.94 SQ.MT. Y1 SCALE :- 1:100 SCALE :- 1:100 TOTAL BUILT UP AREA [X - Y1] = 127.15 SQ.MT. X1 BREAK LINE PROFORMA B O/H WATER TANK CONTENTS OF SHEET LIFT M/C ROOM SECTION - A-A, SECTION - B-B, SECTION - C-C & BUILT UP AREA CALCULATION 4.25 4.25 4.25 AREA CALCULATIONS 2.00 2.00 TERRACE @ 6TH FLR. LVL. TERRACE @ 6TH FLR. LVL. ALL DIMENSIONS ARE IN METERS APPROVAL OF PLANS THIS DOCUMENT IS DIGITALLY SIGNED AND NO PHYSICAL SIGN IS REQUIRED. 5TH FLR. 3.025 0.75 5TH FLR. 3.025 APPROVED SUBJECT TO THE CONDITIONS MENTIONED IN THIS OFFICE LETTER UNDER AUTODCR FILE No. CHE/WS/4458/K/E/337(NEW) DATE : 03/09/2019 2.00 2.00 THIS CANCELS APPROVAL TO THE PREVIOUS PLANS SANTIONED UNDER NO. 0.80 M. W. CANTI. PROJ. PART TERRACE @ 5TH FLR. LVL. LIVING/DINING KITCHEN PART TERRACE @ 5TH FLR. LVL. LIVING/DINING CHE/WS/4458/K/E/337(NEW) DATED - 16/03/2019 1.05 M. W. CANTI. PROJ. SAFETY RAILING 2.00 M. W. CANTI. PROJ. S.S. 0.30 0.30 PLANS FOR APPROVAL 0.40 3.025 3.025 3.025 3.025 2.425 AT ALL FLOOR 4TH FLR. 4TH FLR. 4TH FLR. 0.45 0.90 0.30 0.30 BED RM TOILET STUDY LIVING/DINING KITCHEN 23.725 TOILET BED PASS. LIVING LIVING/DINING FLUSH TO BLDG. LINE. S.S. Balwant Digitally signed by Balwant Sukdeo Pawar SAWANT Digitally signed by SAWANT RAMCHANDRA SAMPATRAO DN: c=IN, o=MUNICIPAL CORPORATION OF Prakash Digitally signed by Prakash Rajaram Rasal DN: c=IN, o=Municipal Corporation of Greater Mumbai, ou=Building Proposal, 3.025 DN: c=IN, o=Municipal Corporation of 0.34 23.725 23.725 Rajaram postalCode=400050, st=Maharashtra, 3.025 3.025 3.025 Greater Mumbai, ou=Building Proposal GREATER MUMBAI, RAMCHANDRA 2.5.4.20=4dd8b645eb68c9ba3596daa1f2 Sukdeo Dept. (WS)-1, postalCode=400050, 2.5.4.20=9d11a56829cbe3669f9dbaf34df88b d576b2064701191c053614d3e4a85e601 st=Maharashtra, e78d5, ecf2e56e94fbc55ee0b0ea304eedb1074c, 3RD FLR. SAFETY RAILING 3RD FLR. 3RD FLR. 2.5.4.20=cb4c3ee99d907553c9dba22af6 ou=DY CH E B P SPL CELL,CID - 6302637, serialNumber=bcdd79d619cfdf599b673b Rasal a53d3689310974ce180a7544c70ca4389 9c0ff942e547a856c50c073dca6a97a8944 SAMPATRAO postalCode=400072, st=Maharashtra, 163cad1, cn=Prakash Rajaram Rasal 07d7d, Date: 2019.09.03 08:38:49 +05'30' 0.90 Pawar serialNumber=2767a48face0bbaa93bd9 cn=SAWANT RAMCHANDRA SAMPATRAO AT ALL FLOOR 1.10 2e347a5c908e7d5f089015d5b4a1fc9dfa Date: 2019.08.29 20:46:38 +05'30' 0.30 de9fff668, cn=Balwant Sukdeo Pawar Date: 2019.08.14 13:13:44 +05'30' BED RM TOILET LIVING/DINING KITCHEN FLUSH TO BLDG. LINE. TOILET BED PASS. LIVING LIVING/DINING S.E. (B.P.) KW S1 A.E. (B.P) WS K/E E.E. (B.P) WS (K) WARD 1.70 M. W. CANTI. PROJ. 19.475 19.475 19.475 S.S. 1.20 S H A F T S H A F T 1.20 DESCRIPTION OF THE PROPOSAL & PROPERTY 0.75 2ND FLR. 3.025 3.025 2ND FLR. 3.025 3.025 2ND FLR. 16.30 PROPOSED PLANS FOR RESIDENTIAL BUILDING ON PROPERTY BEARING C.T.S. NO. 1021, 1021/1 TO 4 OF VILLAGE VILE PARLE (EAST), BED RM TOILET LIVING/DINING KITCHEN TOILET BED PASS. LIVING LIVING/DINING F. P. NO. 96 OF TPS II, VILE PARLE (EAST), AT MALVIYA ROAD, 13.275 VILE PARLE (EAST), IN K/EAST WARD, MUMBAI - 400 057. 13.425 S.S. 3.025 L I F T L I F T 3.025 GIRDER BEAM 1ST FLR. 1ST FLR. SAFETY RAILING 1ST FLR. NAME & SIGNATURE OF OWNER / APPLICANT 1.10 AT ALL FLOOR VERTICAL VERTICAL KAVINDR JIGNESH 7.225 BED RM TOILET FLUSH TO BLDG. LINE. SHRI. KAVINDRA R. SHAH & SHRI. JIGNESH J. SHAH FINS TOILET BED PASS. LIVING FINS S.S. DOUBLE HIEGHT PARTNERS OF SIDDHI SUNDER R.R. LLP A RATILAL JAYENDRA 7.225 7.225 C.A. TO SUNDER NIWAS CHSL. VERTICAL FINS DOUBLE HIEGHT SHAH SHAH COMPOUND COMPOUND Digitally signed by WALL WALL Digitally signed ELEC.METER PANEL COMPOUND ADDRESS:- by KAVINDRA JIGNESH 4.20 WALL RATILAL SHAH JAYENDRA SHAH STILT FLR. FLAT NO. 7, 2ND FLOOR, MANI BHAVAN SHRADDHANAND ROAD Date: 2019.08.12 Date: 2019.08.12 2.60 EXTENSION, VILE PARLE (EAST), MUMBAI - 400 057. 17:32:27 +05'30' 2.10 2.10 17:32:01 +05'30' 0.15 2.00 0.15 0.15 PUMP NAME, ADD. & SIGNATURE OF ARCHITECT. STILT FLR. RM Digitally 0.15 LIFT PIT LIFT PIT 2.15 2.30 Saumil signed by Saumil Ashwin H. M. JHAVERI & SONS U.G. TANK U.G. TANK ARCHITECTS Ashwin Jhaveri Date: SECTION "A-A" SECTION "B-B" SCALE:- 1:100 SECTION "C-C" SCALE:- 1:100 3RD FLR, SATYANARAYANPRASAD COMMERCIAL CENTRE, DAYALDAS ROAD, OFF. NEHRU ROAD,VILE PARLE(E). Jhaveri 2019.08.12 17:34:17 SCALE:- 1:100 +05'30' MUMBAI - 400 057.